
It is planned to start reconstruction and construction of the water supply system this year. The project is designed for 2023-2024.
- the length of the water supply system in the village of Rahat is 31.5 km .
- the length of the water supply system of the village of Kazakhstan is 15.5 km .
- the length of the village water supply system is 12 km .
- - the length of the water supply system of the village of Aschybulak is 12 km.
- the length of the water supply system of the village of Shelek is 124 km .
At the moment, competitive procedures are being conducted.