WATER SUPPLY
There are 320 settlements in Aktobe region, of which 283 (88.4%) or 921 thousand people (99.2%) are provided with drinking water, 37 (11.5%) operate wells.
Last year, 2023, water supply in 5 villages (Baiganin-Altai Batyr. Kobda-Zharsai, Light, Zhanatalap. Uil-Shubarshy) a new centralized water supply network has been installed. It has a population of 2,285 people. In addition, in 13 villages (Alga – Tyldysai. Baiganin-Zhyngyldytogai. Irgiz-Karasai. Kobda-Baytak, Zharsai-2, Sogaly. Mugalzhar-males, Zhylzhen-Temir. Temir-Sarytogai, Shibulak, Kopa. Shalkar-Yeset ata, Taldykum.) the complex module of the block is installed. There are 1,426 people in it.
In addition, there are 3 villages connected to the centralized water supply network (Ayteke bi – Karabutak. Go ahead-Koralbulak. Bayganin – Karaulkeldy) reconstruction, reconstruction has been carried out.
This year, out of 312 villages, 275 are equipped with drinking water, of the remaining 37 villages:
There is a central water system in 15 villages;
KBM will be installed in 2 villages;
During the meeting with the population of 20 villages
KBM refused to install it. However, in the operation of water intake wells provided with clean drinking water that meets sanitary standards. There are fresh water wells and mine wells in these villages.
By the end of 2024, it is planned to increase the availability of drinking water supply to 926 thousand people (99.8%) in the population, to 300 (93.7%) in settlements.
All 8 cities of the region are equipped with water or 100%.
In general, villages subject to centralized water supply and installation of CBMs will be fully covered in the region by 2025.