Availability of visualized information on water use in Taraz

Project description

Within the framework of the project "Modernization of the water supply system in the city of Taraz" 6 contracts were executed. The main goals are: bringing the water balance (full accounting of the raised and supplied water to the network), to further identify the most problematic areas and reduce water losses, increase energy efficiency, etc.

Region

Zhambyl region

Provider/IT-company name

  • EkoInfraEngineering LLP NPF Ergonomics LLP
  • SK Global LLP"

National/foreign

national

Scope

city

Year of launch into operation

gradually from 2018 to beginning of 2020

Financing source

RB/LB/IBRD

Results(Impacts)

  1. Facilitating the work of production technical unit and dispatching service employees, thanks to the electronic map (GIS).
  2. Increasing the service life and reliability of the necessary equipment for lifting and transporting water to the city.
  3. Facilitation of the work of drivers, thanks to remote control of borehole pumps and pumps of the 2nd lift.
  4. Supply and regulation of the required pressure to the population due to the frequency regulation of pumps, as a result of which the reduction of accidents on the networks.
  5. Increasing the productivity of pumping water from wells, reservoirs, testing and repairing emergency power cables.
Publication date

30 October 2020

Date of update

30 October 2020