
Number of streets: 18 streets, from 2020 to 2022. as part of the program under the program "Ensuring the functioning of highways", 15 streets in the village of Birlik were paved.
There are 3 pedestrian crossings, 2 on Arasan Street, 1 on Kirova Street, road signs.
Street lighting: According to the program "Development of regions":
- 2023 replacement of lanterns on Dostyk Street, Embankment, Kirova, Technical, Molodezhny, Lugovaya, Zapadny – 40 lanterns.
- in 2024, it is planned to install street lighting on Priishimskaya Street, Zernovaya Street.
Landscaping of the village: Within the framework of the three-month landscaping and sanitary cleaning of territories, work was carried out on planting flowers of 320 m2, pine seedlings of 40 pcs; whitewashing of trees and pillars; whitewashing of the facade of the recreation center; mowed 3000 m2 of lawn in the district, on playgrounds, landscape area near the monument; whitewashing of fences, trees; mowing of shrubs along the streets Kirova, Arasan, Dostyk. Within the framework of the three-month improvement and sanitary cleaning of the territories of the rural district, the following were carried out: repair of the monument to the "Soldier—Liberator" - the monument, the fence, the acacia was pruned, the slabs were whitewashed and painted, the entire territory was cleared of debris; On the territory of the village - planting of pine seedlings, pruning trees and sawing dead wood, planting flowers, whitewashing trees and pillars; the village club was renovated (whitewashing, painting). A problematic issue is the installation of a mini-football field with artificial turf, the installation of a playground.
Winter road maintenance: ES Global Agro LLP cleans snow in winter.
The condition of cemeteries: There is a Christian cemetery, in 2021, the current repair of the cemetery fence in the village of Birlik was carried out in the amount of 1,400,000 tenge, the supplier is IP StroySvet. A Muslim cemetery is planned to be built in 2024.
Water supply: is carried out in the village of Birlik by means of a local water pipeline, with a total length of 11.5 km. 1 object of water distribution networks in the village of Birlik. The distribution networks are on the balance sheet of the KSU "Apparatus of the akim of the Birlik rural district of the Gabit Musrepov district of the North Kazakhstan region", the maintenance of the network is carried out at the expense of ES Global Agro LLP (repair in case of an accident). There is water in 120 houses.
275 people (90 households) live in the village of Starobilka. The supply of drinking and industrial water is carried out by ES Global Agro LLP, on MTZ-80 transport with a barrel. The volume of a barrel of drinking water is 3 m3, industrial water is 3.8 m3. Water supply is carried out 3 times a week: Monday, Wednesday, Friday, from 9.00 am to 20.00 pm. The price for 1 m3 is 100 tenge. A PSD has been developed for the construction of water supply distribution networks in the village of Starobilka.
Entrepreneurship
There are 9 sole proprietors in the district.
There are 3 shops in the village of Birlik: the Bastau store of IP Akpanova K.O., the Yana mini-market of IP Yana, the Yana construction goods store. IP "Yana" has a culinary workshop and a workshop for the production of small architectural forms.
In the village of Starobilka there are 2 shops "Esaul" IP "Rusakov S.A.", "Nadezhda" IP "Gromova N.L.".
There is a public bathhouse of ES Global Agro LLP, built in 1970, works on Saturdays, 100-150 people visit, the cost is 150 tenge, the condition is satisfactory.
There are 2 bakeries of ES Global Agro LLP, 800 loaves of bread are baked per day, the price for a loaf of bread is 100 tenge.