There is a total length of 26 kilometers of rural roads in Bayandy village. Of which 24 kilometers are fully asphalted.
In addition, 2 kilometers of medium repair work on the rural road was carried out by specialists from the Mangystau regional branch of the National Quality Center for Road Assets, and it was determined that the road surface should be covered by medium repair work.
Accordingly, at present, estimate documents are being developed for medium repair work on the mentioned rural road.
5.3 million tenge has been allocated for the maintenance of rural roads, and according to the results of the public procurement competition, a contract for 3.5 million tenge has been concluded with the private entrepreneur "Zhanbolat" and the relevant work is being carried out.
In addition, a total of 63 road signs have been installed on rural roads.
It is planned to install 50 road signs as part of additional road maintenance work, of which 25 road signs, artificial road barriers in 2 locations, pedestrian lanes in 4 locations, and road lanes on 6 kilometers of the highway have been installed to date.