Certificate on ensuring access of citizens with disabilities to the objects of the road and transport infrastructure of the Kyzylorda region

As of the third quarter of 2026

Regarding transport infrastructure:
A total of 202 bus routes have been established in the region, connecting 212 settlements, districts, and the regional center. These comprise: 65 inter-district (intercity) routes, 86 district (intra-settlement) routes, and 32 intra-city and suburban routes.
In addition, one international bus route to Tashkent and 18 inter-regional bus routes to cities such as Astana, Almaty, Shymkent, Zhezkazgan, Turkistan, Saryagash, and Aktobe have been organized.
Inter-district (intra-regional intercity) routes are served by two bus terminals and eight bus stations located in the city of Kyzylorda and various district centers.
In 2024, a modern bus terminal with a capacity of 200 passengers and a cost of 975 million tenge was commissioned on the left bank of Kyzylorda. The new terminal was transferred by the Kyzylorda city administration to the ownership of "Kyzylorda Bus Depot" LLP and is currently operational.
A new regular inter-regional (intercity) passenger route, "Kyzylorda – Atameken (Khorgos)," has been launched, operating from the new left-bank bus terminal. Public transport operations in Kyzylorda are improving, with significant efforts underway to expand the fleet with new, high-capacity buses. In the third quarter of 2026, passenger traffic reached 28.8 million people (compared to 27.7 million in the third quarter of 2025), representing a 0.8% increase over the same period in 2025.
Between 2022 and 2024, to address public transport issues in the city of Kyzylorda, 300 "Yutong ZK6852 HG" buses running on natural gas (methane) were acquired via the Industrial Development Fund JSC under a 7% leasing arrangement. These new, high-capacity buses are fully equipped with video cameras, GPS systems, and special ramps to facilitate access for passengers with disabilities. Currently, the "Kyzylorda Bus Depot" LLP operates 32 urban routes.
As part of the "Eco-Taxi" service project in Kyzylorda, 100 electric vehicles were purchased to serve the city's residents and visitors.
Regarding air transport:
On November 12, 2024, a new terminal at Korkyt Ata Airport was opened, an event attended by Prime Minister Olzhas Abayevich and held under the directive of Head of State Kassym-Jomart Kemelovich. The Bulat Utemuratov Foundation invested 16.7 billion tenge in the project, while over 4.3 billion tenge was allocated from the local budget for engineering and utility infrastructure. The new terminal meets the high standards set by the International Air Transport Association (IATA) and the International Civil Aviation Organization (ICAO). For reference: the new terminal features lounges for domestic and international flights, a transit passenger lounge, a "Lilac Lounge," an automated baggage claim system, retail outlets, a medical station, 8 passenger check-in counters, and 5 self-check-in kiosks. It also includes 7 security screening points for passengers and baggage, as well as 10 passport control booths.
On June 20, 2026, the airline Scat launched a new subsidized flight route connecting Aktau, Kyzylorda, and Aktau.
Currently, the airlines Air Astana, FlyArystan, Qazaq Air, and Scat operate a total of 43 flights per week via Korkyt Ata Airport: 29 flights to Astana, 12 to Almaty, and 2 to Aktau. In the third quarter of 2026, the airport handled 127,700 departing passengers (compared to 84,100 in the third quarter of 2025), representing a 51.8% increase year-on-year.
Regarding railway transport:
The total length of the main railway network passing through the Kyzylorda region is 1,051.7 km; the infrastructure includes 8 railway stations and 2 service points.
A total of 15 pairs of passenger trains operate across the region; of these, 6 pairs originate from the regional center, connecting it to the cities of Astana, Petropavlovsk, Pavlodar, Kokshetau, Semey, and Turkistan. The socially significant passenger train No. 6843/6844 (Kyzylorda–Besaryk–Turkistan), operating in the southern part of the region, serves 26 settlements. For reference: between January and August 2026, 12,500 passengers were transported, and 110.2 million [tenge] in subsidies was utilized.
In 2023, with sponsorship from Kazakhstan Temir Zholy and local entrepreneurs totaling over 605 million tenge, major repairs and landscaping were carried out at the Kyzylorda railway station building and its surrounding area.
In 2025, with the support of the Head of State and the Government of the Republic of Kazakhstan, work began on the major renovation and landscaping of railway stations and station grounds across the country and the region; in total, 124 stations are undergoing renovation.
The list of railway stations undergoing renovation includes seven stations in the region (Zhanakorgan, Shieli, Zhosaly, Toretam, Kazaly, Aralskoye More, and Saksaul) and two service points (Terenozek and Zhalagash), as well as the passenger platform at Station Talap. A contract has been concluded between the contractors renovating these railway stations and JSC "NC" Kazakhstan Temir Zholy."
This year, the railway stations at Sekseuyl, Aral, Kazaly, Toretam, Zhosaly, Shieli, and Zhanakorgan, as well as the passenger platform at Talap station, were opened for public use. Reconstruction and major renovation works are currently underway at the remaining railway stations. These efforts aim to create favorable conditions for passengers, modernize infrastructure, and enhance safety standards. The renovations involve updating the exterior and interior of the station buildings and refurbishing waiting areas, ticket offices, and restrooms to meet modern standards. Furthermore, utility systems are being completely overhauled, with special attention paid to ensuring accessibility and comfort for citizens with disabilities.
Upon completion of these renovations, the quality of service at the railway stations is expected to improve, creating a more comfortable and safe environment for local residents and visitors.
Regarding road infrastructure development:
The total length of local roads in the Kyzylorda region is 3,525 km. This figure comprises 1,025 km of national roads, 555 km of regional roads, and 1,945 km of district roads.
In total, 43.8 billion tenge has been allocated from national, regional, and district budgets for road infrastructure development in 2026, covering the renovation of 168 km of roads, streets, and bridges.
By the end of 2026, the aim is to increase the share of regional and district roads rated as being in "good" or "satisfactory" condition to 95.5%.


As of the second quarter of 2026

There are 202 bus routes operating in the region, connecting 212 settlements, the district, and the regional center.
Of these, 65 routes are interdistrict (intercity), 86 are district (intra-village), and 32 are intra-city and suburban.
In addition, there is one international bus route to Tashkent and 18 inter-regional bus routes to Astana, Almaty, Shymkent, Zhezkazgan, Turkestan, Saryagash, Aktobe, and other cities.
Two bus stations and eight bus stations in Kyzylorda and district centers serve inter-district (intercity and intra-regional) routes. These stations are included in the passenger service points, bus stations, and bus terminals of the Kyzylorda region. In 2024, a modern 200-seat bus station building, costing 975 million tenge, was commissioned on the left bank of the Kyzylorda River.
The new bus station was transferred by the Kyzylorda City Akimat to the ownership of Kyzylorda Bus Park LLC and is currently providing services.
A new interregional (intercity) regular passenger transport route, Kyzylorda - Atameken (Khorgos), has now opened, operating from the new bus station on the left bank.
Public transportation in Kyzylorda is improving, with significant work underway to replenish the fleet of new, high-capacity buses.
In the second quarter of 2026, $17.3 million in passengers were carried, representing 97.3% of the 2025 target (17.7 million in the second quarter). This represents a 2.7% decrease compared to the same period in 2025. In 2022-2024, to address public transportation issues in Kyzylorda, 300 Yutong ZK6852 HG buses powered by natural gas (methane) were purchased through the Industrial Development Fund JSC with a 7% lease.
The new, high-capacity buses are fully equipped with video cameras, GPS devices, and special ramps for disabled riders.
Currently, Kyzylorda Bus Park LLC operates 32 city routes.
As part of the project to establish an Ecotaxi service in Kyzylorda, 100 electric vehicles have been purchased to serve residents and visitors of Kyzylorda. In accordance with the instructions of Head of State Kassym-Jomart Kemelovich, the new terminal of Korkyt Ata Airport was opened on November 12, 2024, with the participation of Prime Minister of the Republic of Kazakhstan Olzhas Abayevich.
The Bulat Utemuratov Foundation invested 16.7 billion tenge in the project, with 4 billion tenge from the local budget allocated for engineering and communications infrastructure. Over 300 million tenge has been allocated.
The airport's capacity has been increased sevenfold, from 300,000 passengers per year.
The new terminal meets the high standards of the International Air Transport Association (IATA) and the International Civil Aviation Organization (ICAO). For reference: the new terminal features lounges for domestic and international flights, a transit passenger lounge, a lilac lounge, an automatic baggage claim system, vending machines, a first-aid station, 8 passenger check-in areas and 5 self-service check-in stations, baggage and passenger screening stations.
There will also be 7 security checkpoints and 10 passport control booths.

Starting June 20, 2026, Scat Airlines launched a new subsidized flight on the Aktau-Kyzylorda-Aktau route.
Currently, AirAstana, Fly Arystan, Qazaq Air, and Scat operate 47 flights per week through Korkyt Ata Airport, including 32 flights to Astana, 13 flights to Almaty, and two flights to Aktau. In the second quarter of 2026, the airport handled 78,500 passengers (compared to 51,900 in the second quarter of 2025), a 51.3% increase compared to the second quarter of 2025.
The total length of the main railway network running through Kyzylorda Oblast is 1,051.7 km and includes 8 railway stations.
There are 2 service points.
A total of 15 pairs of passenger trains operate within the region, including 6 pairs of passenger trains from the regional capital to the cities of Astana, Petropavlovsk, Pavlodar, Kokshetau, Semey, and Turkestan. Socially significant passenger train No. 6843/6844 "Kyzylorda-Besaryk-Turkestan" serves 26 settlements in the southern region.
For reference: from January to May 2026, 7.8 thousand passengers were transported, and 80.2 million tenge in subsidies were utilized.
In 2023, with the sponsorship of Kazakhstan Temir Zholy and local entrepreneurs, a major overhaul and improvement of the surrounding area of ​​the Kyzylorda railway station was carried out, totaling over 605 million tenge.
In 2025, with the support of the head of state and the Government of the Republic of Kazakhstan, major overhaul and improvement work began on all railway stations and station areas in the republic and the region; a total of 124 stations are currently undergoing renovation. The list of the above-mentioned repair railway stations includes 7 railway stations of the region (Zhanakorgan, Shieli, Zhosaly, Toretam, Kazaly, Aral Sea, saxaul), 2 service points (Terenozek and Zhalagash) and the passenger platform at Talap station.
An agreement was signed between the contractors responsible for the renovation of these railway stations and JSC NK Kazakhstan Temir Zholy.
On June 27-28 of this year, the Kazaly, Shieli, and Zhanakorgan railway stations and the passenger platform at Talap station were handed over to the public.
Reconstruction and major repairs are underway at the remaining railway stations.
These works are aimed at creating favorable conditions for passengers, modernizing the infrastructure, and strengthening safety requirements.
During the renovation, the exterior and interior appearance of the station buildings will be updated, and waiting rooms, ticket offices, and restrooms will be refurbished to meet modern requirements. Furthermore, utility systems have been completely updated, with special attention being paid to creating comfortable conditions for citizens with disabilities. It is expected that after completion of these renovations, the quality of service at railway stations will improve and a more comfortable and safe environment will be created for residents and visitors of the city.


Final information for 2025

Road transport in the region includes 202 bus routes, connecting 212 settlements with district and regional centers. These include: 65 inter-district (intercity) routes, 86 district (intra-settlement) routes, and 32 city and suburban routes.
In addition, there is one international bus route to Tashkent and 18 inter-regional routes to Astana, Almaty, Shymkent, Zhezkazgan, Turkestan, Saryagash, Aktobe, and other cities.
A new inter-regional (intercity) regular passenger route, Kyzylorda - Atameken (Khorgos), has recently opened, serving from the new bus station on the left bank. In addition, in response to public demand, work is underway to open a regular passenger route between Kazaly and Atameken (Khorgos).
By the end of 2025, 46.1 million passengers were transported, representing a 29.3% increase (35.7 million in 2024), a 29.3% increase compared to the same period in 2024.
By the end of 2025, 6,650.4 thousand tons of freight were transported by road, representing a 59.5% increase (4,170.8 thousand tons in 2024), a 59.5% increase compared to the same period last year.
Revenue amounted to 36 billion 326.8 million tenge (including 29.1 billion tenge from freight transportation and 7.2 billion tenge from passenger transportation), a 37.9% increase compared to the same period last year (22 billion 528.5 million tenge in 2024).
Air Transport
Currently, Korkyt Ata Airport operates 27 flights per week, including 17 flights to Astana and 10 flights to Almaty. Flights are operated by Air Astana, Fly Arystan, and Qazaq Air.
For reference: 145,100 passengers departed from the airport in 2025 (171,800 in 2024), a 15.6% decrease compared to the same period in 2024. Revenue amounted to 6 billion 308.3 million tenge, a 23.1% decrease compared to the previous year (8 billion 204.2 million tenge in 2024).
During the summer of this year, Fly Arystan operated a charter flight to Antalya, Turkey. Also in 2024, a flight between Kyzylorda and Aktau was launched, but was subsequently suspended due to a lack of passenger traffic.
Starting in 2026, approval has been received to include the socially important flights Kyzylorda-Aktau-Kyzylorda and Kyzylorda-Atyrau-Kyzylorda in the relevant list, and work is underway to launch these flights. Railway Station
The total length of the main railway network running through Kyzylorda Oblast is 1,051.7 km. There are 8 railway stations and 2 service centers.
A total of 15 pairs of passenger trains run through the region, including 6 pairs of passenger trains from the regional capital to Astana, Petropavlovsk, Pavlodar, Kokshetau, Semey, and Turkestan.
The socially significant passenger train No. 6843/6844 "Kyzylorda - Besaryk - Turkestan" provides transportation services to 26 settlements in the southern part of the region.
For reference: in 2025, 19,300 passengers were transported, and 170.3 million tenge in subsidies were utilized.
Regarding innovations in rail transport, we would like to inform you that JSC "Passenger Transportation" previously operated Talgo train route No. 65/66 "Astana - Zhezkazgan." Effective December 14, 2025, this route will be extended to the Kyzylorda region, allowing passengers to travel comfortably and more quickly to the country's capital.
For reference: the Astana - Kyzylorda train will run every other day and will be able to carry over 400 passengers per trip. The line will utilize modern Talgo trains, which are highly comfortable and equipped with everything necessary for long journeys. Special attention has been paid to passengers with disabilities, with special seats and discounts of up to 50% provided. Travel time on this route will be reduced by seven hours compared to other passenger trains. Starting December 16, 2025, two direct sleeper cars were added to international passenger train No. 7/8 "Almaty - Saratov" on the route "Almaty - Moscow" (Russian Federation). These cars will operate according to the schedule of train No. 7/8 "Almaty - Saratov."
In 2023, with the support of JSC NC "Kazakhstan Temir Zholy" and local entrepreneurs, a major overhaul and improvement of the railway station and its surrounding area was carried out in Kyzylorda, totaling over 600 million tenge.
For reference: The total cost of the project was 577 million tenge, of which 322 million tenge was allocated by "Kazakhstan Temir Zholy" and 255 million tenge through sponsorship from local entrepreneurs.
With the support of the Head of State and the Government, this initiative has been expanded to all regions of the republic, including seven railway stations in the region—Zhanakorgan, Shieli, Zhosaly, Toretam, Kazaly, Aral, and Sekseul—and the Zhalagash and Terenozek service points, as well as the passenger platform at Talap station, where reconstruction, major repairs, and improvements to the stations and surrounding areas are underway.


Passenger Transport and Transport Infrastructure Development

Report on Work Progress for the Third Quarter of 2025

I. Automobile Transport. Currently, 202 bus routes operate in the region, connecting 212 settlements with the district and the regional center. Of these, 71 are inter-district (intercity) routes, 99 are district (intra-settlement) routes, and 32 are intra-city and suburban routes. In addition, there is one international bus route to Tashkent and 13 inter-regional bus routes to Astana, Almaty, Shymkent, Zhezkazgan, Turkestan, Saryagash, Aktobe, and other cities.
In total, more than 30 legal entities and individuals provide passenger transportation services on these routes, using 1,069 buses of varying capacities. From January to September 2025, 34.7 million passengers were transported, a 35.0% increase compared to the previous year.
Over the first nine months of 2025, 8.5 million tenge were allocated for four inter-district (intercity, intra-regional) socially significant routes.
Two bus stations and eight bus stations in Kyzylorda and district centers, which are included in the bus stations, bus stations, and passenger service points of the Kyzylorda region, serve inter-district (intercity, intra-regional) routes.
A new bus station was built and commissioned on the left bank of the river in Kyzylorda, costing 975 million tenge.
The new bus station was transferred by the Kyzylorda city administration to the ownership of Kyzylorda Bus Park LLC and is currently providing services.
2022-2024 To address public transportation issues in Kyzylorda, the Industrial Development Fund JSC purchased 300 Yutong ZK6852 HG buses, powered by natural gas (methane), with a 7% lease.
Currently, Kyzylorda Bus Park LLP operates 32 city routes.
As part of the creation of the Ecotaxi service in Kyzylorda, 100 electric vehicles were purchased. Ecotaxi currently provides services to residents and visitors of the city.
II. Air Transport.
Currently, 29 flights per week depart from Korkyt Ata Airport, including 18 to Astana and 12 to Almaty. These flights are operated by Air Astana, Fly Arystan, and Qazaq Air. In the third quarter of 2025, the airport handled 154,300 passengers, a 15.0% increase compared to the same period last year.
On November 12 of this year, at the direction of the head of state, the opening ceremony of the new passenger terminal at Korkyt Ata Airport in Kyzylorda was held with the participation of Prime Minister Olzhas Bektenov. The new passenger terminal was built with the sponsorship of the Bulat Utemuratov Foundation.
The Bulat Utemuratov Foundation specifically allocated 16.6 billion tenge (US$33.0 million) for the construction of a new passenger terminal at Korkyt Ata Airport in Kyzylorda.
In addition, $4.3 billion tenge was allocated from the regional budget. The Kyzylorda city administration carried out work to connect external utilities to the new passenger terminal (water supply, sewerage, electricity, and internet networks, construction of a steam boiler house and sewer pumping station, parking lots, and a road).
The new passenger terminal will soon increase air transport capacity by approximately sevenfold. Passenger traffic is planned to increase from 300,000 to 2 million passengers annually, and freight traffic will increase from 150 tons to 240 tons per year. The updated terminal Korkyt Ata complies with the high standards of the International Air Transport Association (IATA) and the International Civil Aviation Organization (ICAO).
III. Rail Transport.
1. The total length of the mainline rail network passing through Kyzylorda Oblast is 1,051.7 km and has 8 railway stations and 2 service points.
A total of 14 pairs of passenger trains run through the region, including 5 pairs of passenger trains from the regional capital to the cities of Petropavlovsk, Pavlodar, Kokshetau, Semey, and Turkestan.
Socially significant passenger train No. 6843/6844 "Kyzylorda-Besaryk-Turkestan" in the southern direction of the region serves 26 settlements.
From January to August 2025, 14,800 passengers were transported and 110.7 million rubles in subsidies were utilized.
2.By rail Kyzylorda Railway Station consists of two buildings: a single-story building built in 1905 and a three-story second station built in 1969.
Definition:
- The total area of ​​the Old Station is 832.1 m²;
- The total area of ​​the New Station is 1,336.9 m²;
- The railway station has two passenger platforms, with a total area of ​​2,169 m².
With the support of Kazakhstan Temir Zholy and local entrepreneurs, a major renovation of the Kyzylorda railway station building and adjacent territory was completed at a cost of over 600 million tenge. Construction of the retail building within the railway station has been completed and commissioned.
The list of railway stations to undergo renovations this year includes seven (Zhanakorgan, Shieli, Zhosaly, Toretam, Kazaly, Aral and Saxaul), two service stations (Terenozek and Zhalagash), and a passenger platform at Talap station. Contractors carrying out repairs to these railway stations have signed an agreement with JSC NK Kazakhstan Temir Zholy. Work is currently underway at all railway stations in the districts to dismantle the interior, cover the exterior with hard travertine, and replace the roof with tiles.


Certificate of the regional department of passenger transport and highways on the work done in the 2nd quarter of 2025

On the development of road infrastructure

The total length of local roads in the Kyzylorda region is 3545 km. Of these, 1024.5 km are republican, 555 km are regional, 1965.5 km are district roads.
In total, 41.2 billion tenge have been allocated from the republican, regional and district budgets for the development of road infrastructure in 2025; a total of 330 km of roads, streets and bridges are being repaired.
By the end of 2025, it is planned to increase the share of good and satisfactory indicator indicators of regional and district roads to 95%.

On the development of passenger transport and transport infrastructure

I. Automobile transport. In 2025, 202 bus routes were organized in the region, connecting 212 settlements with the district and the regional center, of which: interdistrict (intercity) - 71 routes, district (intra-village) - 99 routes, intra-city and suburban - 32 routes. In addition, 1 international bus route to Tashkent and 13 interregional bus routes to Astana, Almaty, Shymkent, Zhezkazgan, Turkestan, Saryagash, Aktobe and others were organized. In total, more than 30 legal entities and individuals provide passenger transportation services on these routes with 1069 buses of various capacities.
In January-February 2025, 6.9 million passengers were transported, which is 29.5% higher than last year. 2.3 million tenge have been spent on 5 inter-district (intercity intra-regional) socially significant routes.
2 bus stations and 8 bus stations in the cities of Kyzylorda and district centers included in the bus stations, bus stations and passenger service points of the Kyzylorda region serve inter-district (intercity intra-regional) routes.
On the left bank of the city of Kyzylorda, the cost of the project was
975 million tenge, a new bus station was built and put into operation.
The new bus station was transferred by the Akimat of the city of Kyzylorda to the ownership of Kyzylorda Bus Park LLP and will provide its services in 2025.
2022-2024 in the direction of solving the problem of public transport in Kyzylorda. Through JSC "Industrial Development Fund", 300 Yutong ZK6852 HG buses were purchased, running on natural gas fuel (methane) with 7% leasing.
As of 2025, Kyzylorda Bus Park LLP covers 32 city routes.
As part of the creation of the Ecotaxi service in the city of Kyzylorda, 100 electric vehicles were purchased. Currently, the Ecotaxi service provides its services to residents and guests of the city.
II. Air transport.
As of 2025, 29 flights are operated per week through Korkyt Ata Airport, including: 18 to Astana, 11 to Almaty. These flights are operated by Air Astana, Fly Arystan and Qazaq Air. In the first quarter of 2025, 43.9 thousand passengers were dispatched from the airport, which is 11.0% more than in the same period last year.
On November 12 of this year, on behalf of the head of state, with the participation of Prime Minister Olzhas Bektenov, the opening ceremony of the new passenger terminal of the Korkyt Ata airport in the city of Kyzylorda was held.
The new passenger terminal was built with the sponsorship of the private foundation "Bulat Utemuratov Foundation".
"Bulat Utemuratov Foundation" for the implementation of the project "construction of a new passenger terminal of the airport" Korkyt ata of the city of Kyzylorda in the amount of 16.6 billion tenge (33.0 million US dollars) specially allocated.
At the same time, from the regional budget 4.3 billion tenge were considered, the Akimat of the city of Kyzylorda carried out work to connect external engineering and communications infrastructure to the new passenger terminal (connection of water supply, sewerage, electricity and Internet networks, construction of a steam boiler house and a sewage pumping station, parking lots, a road).
The new passenger terminal will allow in the near future to increase the indicators of air transport by about 7 times. It is planned that the volume of passenger transportation will increase from 300 thousand passengers to 2 million passengers annually, and the volume of freight transportation will increase from 150 tons to 240 tons per year. The updated terminal "Korkyt Ata" complies with the high standards of the International Air Transport Association (IATA) and the International Civil Aviation Organization (ICAO).
III. Rail transport.
1. The total length of the main railway network passing through the Kyzylorda region is 1051.7 km and has
8 railway stations, 2 service points.
In total, 14 pairs of passenger trains pass through the territory of the region, of which 5 pairs of passenger trains are organized from the regional center to the cities of Petropavlovsk, Pavlodar, Kokshetau, Semey and Turkestan.
Socially significant passenger train No. 6843/6844 "Kyzylorda-Besaryk-Turkestan" in the southern direction of the region serves
26 settlements.
In January-February 2025, 3.4 thousand passengers were transported and
42.2 million. subsidy was spent.
2. by railway stations
The railway station of the city of Kyzylorda consists of 2 buildings - a 1-story building built in 1905 and a 3-story second station built in 1969.
Definition:
- the total area of the Old Station is 832.1 m2;
- the total area of the New Station is 1336.9 m2;
- the railway station has 2 passenger platforms, the total area is 2169 m2.
The railway station serves 1,500 passengers per day.
With the support of the company "Kazakhstan Temir Zholy" and local entrepreneurs, a major overhaul of the building of the railway station of the city of Kyzylorda, the adjacent territory was carried out for more than 600 million tenge. The construction of the building of retail outlets on the territory of the railway station has been completed and put into operation.
In addition, the district akimats have developed design and estimate documentation for the overhaul of railway stations located in the districts and sent it to the branch of JSC NK Kazakhstan Temir Zholy - Kyzylorda branch of the main network. The issue of allocating funds for repair work is being cons


Road transport. At the current time on the territory of region 205 bus routes were organized, which connect 212 settlements with district and the regional center, from them: interdistrict (intercity) – 71 routes, districts (intervillage) – 101 routes, intercity and countryside – 33 routes. In addition, 1 international bus route to the city of Tashkent and 13 interregional routes to the cities of Astana, Almaty, Shymkent, Zhezkazgan, Turkestan, Saryagash, Aktobe and others were organized.
In total, more than 30 legal entities and individuals provide passenger services on these routes with 1405 buses of various capacities.
At the end of 2023 24.1 million passengers were transported.
For 7 socially important interdistrict (intercity and interregional) routes, 18.5 million subsidy was spent.
On interdistrict (intercity and interregional) routes serve 1 bus station and 8 auto stations in the cities of Kyzylorda and district centers included in bus stations, auto stations and passenger service points of the Kyzylorda region.
On the left bank of the city of Kyzylorda construction of a new bus station cost KZT 975 million.
The construction works are being planned to start in July and finish in the first quarter of 2024. At the direction of solving the issue of the public transport of the Kyzylorda city through the Industrial Development Fund, it is planned to purchase «Yutong ZK6852 HG» in the amount of 300, moving on natural gas fuel (methane) with 7% leasing.
In 2022, 150 buses were purchased. In 2023, 150 buses had their relevant documents filed, and so far, 50 buses have been delivered. Another 100 buses are planning to be delivered in January-February 2024.
2. Air transport. To date, 28 regular flights are carried out per week through the airport «Korkyt Ata», of which: in Astana - 14, Almaty - 14. These flights are operated by «AirAstana», «Fly Arystan» and «Qazaq Air». According to the results of 2023, 305.7 thousand passengers served from the airport. That is 17.1% higher than in the period of 2022.
The project to construct a new passenger terminal at "Korkyt Ata" airport in Kyzylorda is currently underway.
From the private foundation “Fund of Bulat Utemuratov” for the construction of a new passenger terminal KZT 15.7 billion (33.0 million USD) was considered.
From the January 1, 2024 the construction works of terminal fulfilled for 87.4%.
The construction works of terminal are planned to start in February 2023 and complete at the end of May, 202, thus, for 4 months before the plan.
From the regional budget KZT 4.3 billion was allocated for consideration by the akimat of the city of Kyzylorda the works on completion of external engineering and communication infrastructure of the airport are being carried out (construction of water, sewerage, electricity and Internet networks, construction of steam boiler and KNS).
To date, public procurement competitions have been held for the improvement of the terminal territory (construction of parking lots, construction of highways) and rainwater purification (storm drainage), the winner of the public procurement competition for the improvement project was “Iman” LLP, and for the work of rainwater purification (storm drainage) the winner was “Sat Service” LLP.
It is expected that the construction of this facility will increase a number of transport indicators by approximately 1.5 times. The volume of passenger traffic by air will increase from 130 thousand passengers to 200 thousand passengers annually from 2022. It is planned that the volume of cargo transportation will increase from 150 tons to 240 tons per year.
3. Railway transport. Total length of main railway network, passing through the Kyzylorda region, amounted to 1051.7 km. It has 8 railway stations and 2 settlements of services.
In total, 14 pairs of passenger trains pass through the region, from which 5 pairs of passenger trains to the cities of Petropavlovsk, Pavlodar, Kokshetau, Semey and Turkestan were organized from the regional center.
At the end of 2023 was transported 19.2 million. passengers.
In 2023, a major repair of the railway network Aralkum-sapak-Aral Sea of the main railway of Kyzylorda region 23 589 m, Dirmentobe-Toretam 26 641.49 m, Korkyt-Dermentobe 19 900 m was carried out.
2. Railway stations
The railway station in Kyzylorda consists of two buildings - a 1-storey building built in 1905 and a second 3-storey station building built in 1969.
Definition:
- total area of the Old Railway Station - 832.1 m2;
- total area of the new station - 1336.9 m2;
- railway station has 2 passenger platforms, total area - 2169 m2.
The total number of employees of the railway station is 38 people.
The AREM station serves 1 500 passengers per day.
The project of the company «Kazakstan Temir Zholy» was directed to KZT 322 million and KZT 255 million due to sponsorship of local entrepreneurs.
The total amount of the project is KZT 577 million.
On 3 September, 2023 signed an agreement No. 884192/2023/1 with “Integstroy” LLP by JSC NC KTZ for major repair works of the old train station.
In accordance with the preliminary design, work was carried out to install travertine slabs on the outer surface of the station building, repair the roof, repair ramps for citizens with disabilities, repair the drainage system, water supply and sewerage systems, heating systems, and landscaping the urban surface of the station building. Currently, the interior of the station buildings has been renovated. New asphalting (7080 m2) and 10 pieces (4 sources) of lamps were installed on 2 passenger platforms.
On July 3, 2023, following the results of a competition held with the “Kazakhstan Temir Zholy” company for the current renovation of the second station building, contract No. 867618/2023/1 was concluded with “Bersugur”LLP.
In accordance with the repair work plan, the external facade, roof, entrance/exit doors were repaired.
3. For freight transportation by rail cars
For 11 months of 2023, 44 012 cars, i.e. 2.3 million tons (an average of 107 cars 6784.4 tons per day) (oil and petroleum products, testing of ferrous metals, chemicals, soda, building materials, cement, grain products and etc.). This is 23.5% higher than for the same period in 2022.


By the passenger transport industry

The register of bus stations, bus stations and passenger service points of the Kyzylorda region includes 4 bus stations and 8 bus stations in the city of Kyzylorda and regional centers.
They are all privately owned.
Currently, bus stations and bus stations in the city of Kyzylorda and the regional center were built mainly in the Soviet era. And about. Minister for Investment and Development of the Republic of Kazakhstan Does not comply with the requirements of order No. 349 of March 26, 2015 "On approval of the Rules for the carriage of passengers and luggage by road" (ramp, wheelchair for disabled people, space for people moving in wheelchairs, information device alarms, specially adapted ticket offices, public toilets, cabins for people moving in wheelchairs, free parking space with special road signs, etc.) on the land plot and other requirements.
At the bus station of "Saltanat" LLP in Kyzylorda, there are ramps for the unhindered access of people with disabilities, including wheelchairs, a specialized payphone, an accessible ticket office, public toilets, special parking lots for parking vehicles of disabled people.
At the same time, the rest of the bus stations and bus stations are partially accessible for people with disabilities.
In addition, on 125 modern buses on intracity public routes, special ramps are installed for the unhindered entry and exit of citizens with disabilities in wheelchairs, and there are seats inside the bus equipped with special seat belts. The bus conductor drops the equipment, helping a disabled passenger get on the bus and fasten it with a seat belt.
For 2020, 13 large-capacity buses were purchased. Currently, there are 13 large-capacity buses serving passengers.
Also, in the city of Kyzylorda, within the framework of the social responsibility of business, according to the memorandum between the city akimat and the Kyzylorda Bus Depot LLP, free travel is provided for veterans of the Great Patriotic War and category I disabled persons (except for taxis) on the city public transport.
From January 1, 2018, free travel and 50 percent (40 tenge) discounts for school students up to 7-15 years old are provided for all disabled persons of the 1st category and disabled children under 16 years old.

In JSC "Airport" Korkyt ata "in Kyzylorda, special trolleys (two units) for the organization of transportation are provided for serving passengers, in addition to personal assistance in boarding and disembarking passengers with disabilities during check-in.
Airport entrances and gates to the landing area are equipped with ramps. Airport employees pay special attention to passengers and those who have difficulty in moving:
- a wheelchair is provided;
- provides assistance with registration;
- allocates specially designated seats in the aircraft cabin to persons in need of them, in agreement with the airline representatives;
- provides transportation of a passenger with a disability to the plane by road, as well as provides professional service and trouble-free passage after landing with the provision of a bus and a trolley.
In the absence of accompanying persons for the visually impaired and the hearing impaired, professional assistance is provided during takeoff and landing.

At the railway stations of the Kyzylorda region

There are 8 railway stations on the territory of Kyzylorda region (Kyzylorda, Shieli, Zhanakorgan, saxaul, Aral Sea, Kazaly, Zhosaly, Toretam). Also on the territory of the station there are special parking lots for cars of passengers with disabilities;
- 6 ramps are installed on the stairs leading to the station platform;
- a special toilet has been created in the station building;
- to serve hearing-impaired and hearing-impaired passengers, an induction panel is located in the information department.
At the railway stations on the Kyzylorda section, ticket offices are available for persons with disabilities (at the Kyzylorda station - 2 ticket offices, one ticket office at the Saksaul, Aral, Kazaly, Toretam, Zhosaly, Zhalagash, Shieli, Zhanakorgan stations).
For people with disabilities, at the entrance to the Kyzylorda railway station, a bell is set to connect with the station attendant.

Дата публикации
26 мая 2021
Дата обновления
14 октября 2026
Тип
Information

Сейчас читают

Information
21 октября 2026
Results of the socio-economic development of the Kyzylorda region for the period from January to September 2026
Information
07 октября 2026
Report on work performed for the nine months of 2026
Information
17 сентября 2026
Results of the socio-economic development of the Kyzylorda Region for January–August 2026

Социальные медиа

Instagram
Facebook
Telegram
YouTube

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты