Construction of Social Facilities
At the most recent joint session of the Houses of Parliament, the Head of State set forth critical and urgent tasks and directives, emphasizing the need to transform Kazakhstan into a vast construction site.
In the nine months of 2026, the volume of construction work reached 300.5 billion tenge, establishing a stable, positive growth trend.
A total of 684.7 thousand square meters of housing was commissioned, representing 101.1 percent of the target.
Overall, plans are in place to commission 950 thousand square meters of housing from all funding sources by the end of the year.
During the first nine months of 2026, 206.1 billion tenge was allocated for the development of the construction sector, with 63 projects currently underway. These include facilities in the following sectors: healthcare (4 projects), sports (8 projects), culture (3 projects), mobilization preparedness (2 projects), and engineering infrastructure (43 projects). Additionally, construction is proceeding on three 7-story residential buildings—financed through credit schemes—on the Left Bank, each comprising 84 apartments.
This year, the regional center is scheduled to commission a 300-bed multidisciplinary hospital costing 54.3 billion tenge—featuring an outpatient clinic with a capacity of 100 visits per shift and an oncology department—as well as Polyclinic No. 5 in the Titov microdistrict, which has a capacity of 400 visits per shift and costs 9.8 billion tenge.
Furthermore, major socially significant projects include the construction of the "Kyzylorda Arena" complex, valued at 20.5 billion tenge; this facility will house an indoor Olympic-sized swimming pool, a multi-purpose hall with 2,000 seats, and various sports facilities, and is designed to host world-class competitions. Construction of the complex is scheduled for full completion by the end of the current year, at which point it will be opened for public use.
In addition, a 200-bed perinatal center costing 52.7 billion tenge is under construction in the city of Kyzylorda, alongside an outpatient clinic with a capacity of 500 visits per day—costing 14.7 billion tenge—located on the city's left bank.
In accordance with the directive issued by the Head of State at the 5th meeting of the National Kurultai, construction is commencing in Kyzylorda on a drama theater (costing 34.4 billion tenge) and a Presidential Library (costing 20.0 billion tenge); the latter is designed for round-the-clock operation and will house a collection of 600,000 items.
Design and Cost Documentation for Construction Projects
A total of 100.0 million tenge has been allocated from the regional budget for the project titled "Construction of an Innovation and Creative Center in the Al-Farabi Microdistrict of Kyzylorda (including full completion of construction)." A winning design firm has been selected following a public procurement tender.
Currently, land plot documentation is being processed, relevant technical specifications and pre-design documentation are being gathered, and topographic surveys are underway.
Furthermore, 40.1 million tenge has been allocated from the regional budget for the project titled "Construction of a Rapid-Assembly Fire Station on the Left Bank of the Syr Darya River in Kyzylorda," and a contract has been signed with a design firm.
At present, the collection of relevant technical specifications and pre-design documentation is in progress, and topographic surveys are being conducted. Architecture and Urban Planning Development
On the commissioning of residential buildings and public services:
Between January and August 2026, 2,298 residential buildings with a total area of 583,758 square meters were commissioned in the region; this represents a 103.5% increase in completions compared to the period from January to June 2025.
To populate the state urban planning cadastre information system with relevant data—in accordance with Articles 37–40 of the Law of the Republic of Kazakhstan "On Architectural, Urban Planning, and Construction Activities in the Republic of Kazakhstan"—data regarding 569 architectural and planning assignments issued, 487 preliminary designs approved, and 583,758 square meters of housing commissioned by the structural units of local executive bodies responsible for architecture and urban planning have been fully (100%) entered into the system.
Regarding urban planning documentation:
To facilitate the development (and amendment) of approved master plans for settlements in the Kyzylorda Region, a "Roadmap for the Development and Approval of Master Plans and Detailed Planning Projects (DPP) for Settlements in the Kyzylorda Region (including rural settlements)" (hereinafter referred to as the Roadmap) was developed and approved in 2026. In accordance with the aforementioned roadmap, the necessary funds were allocated from regional and municipal budgets to develop projects for amending the master plans and development and zoning schemes of 45 settlements in the region (including six district centers), as well as to prepare detailed planning projects for five new residential districts and a new master plan for the city of Kyzylorda (due to the expiration of the current master plan).
Work is currently underway to obtain the necessary approvals for the developed projects, in accordance with the plan.
To date, positive opinions have been received from the RSE "GosExpertiza" regarding four urban planning projects; subsequently, these were approved by decisions of the district *maslikhats* (local representative bodies). Currently, the vector and raster layouts for these projects have been submitted to the RSE "GosGradKadastr" for review.
Preliminary designs:
To enhance the architectural appearance of planned construction projects, preliminary designs for the exterior facades of the following facilities have been developed:
The "Engineering Park" at Korkyt Ata University in Kyzylorda;
The facade of the Mustakhim Yksanov Kyzylorda Technical IT College;
Single-story residential buildings (2-unit and 4-unit configurations);
Preliminary designs have also been developed for entrance signage intended for installation at the entry points to the region, districts, and rural settlements.
Housing and utility infrastructure construction
In 2026, the commissioning of 950.0 thousand square meters of housing is planned, utilizing all sources of funding.
During the period from January to August 2026, 583.8 thousand square meters of housing were commissioned (103.5% of the target) using all funding sources.
In 2026, under the Concept for the Development of Housing and Utility Infrastructure for 2023–2029, 80.5 billion tenge was allocated from the state budget for housing construction and the purchase of new housing (33.8 billion tenge from the regional budget and 46.7 billion tenge via securities). Using allocated budget funds:
Construction is underway on three 7-story buildings—comprising a total of 252 apartments—on the left bank of the Syr Darya River in the city of Kyzylorda, funded through the issuance of securities.
To provide housing for citizens on the waiting list, a total of 77.0 billion tenge has been allocated from the budget to purchase new, completed apartments; of this amount, 33.8 billion tenge comes from the regional budget, and 43.2 billion tenge is derived from the issuance of securities. These funds are designated for the purchase of 4,652 new, completed rental apartments for socially vulnerable population groups (Kyzylorda city: 4,302 apartments; Aral District: 50; Kazaly District: 50; Karmakshy District: 50; Zhalagash District: 50; Syrdariya District: 50; Shieli District: 50; Zhanakorgan District: 50), as well as 945 social credit-scheme apartments and 135 apartments for residents of dilapidated housing in the city of Kyzylorda.
For 2026, 23.1 billion tenge has been allocated from the state budget (7.3 billion tenge from the regional budget and 15.8 billion tenge from securities) to implement 43 engineering and utility infrastructure projects serving residential development areas (water: 3; sewage: 1; electricity: 26; heating: 1; gas: 5; integrated infrastructure: 7).
These include:
- Kyzylorda city – 10 projects;
- Aral District – 7 projects; - Kazaly District – 2 projects;
- Karmakshy District – 4 projects;
- Zhalagash District – 1 project;
- Syrdariya District – 4 projects;
- Shieli District – 9 projects;
- Zhanakorgan District – 6 projects.
Construction of Social Facilities
Under a direct order from the Department of Construction, Architecture, and Urban Development of the Kyzylorda Region, 31.1 billion tenge has been allocated for the development of the construction industry for January-June 2026. These funds are being used to construct five facilities.
Reference:
- Healthcare – 2 facilities;
- Sports – 2 facilities;
- Mobilization training – 1 facility.
In January 2026, a sports and fitness center was commissioned in the Left Bank microdistrict of Kyzylorda. Three major facilities are scheduled for completion by the end of this year:
- A 300-bed multidisciplinary hospital with a 100-visit-per-shift outpatient clinic and an oncology department on the Left Bank of Kyzylorda;
- Outpatient Clinic No. 5 with 400 visits per shift in the Titov microdistrict;
- the Kyzylorda Arena multifunctional sports complex.
Construction of a 300-bed multidisciplinary hospital with a 100-visit outpatient clinic and an oncology department on the Left Bank has been ongoing since 2023. The general contractor is Meliorator LLC. The project cost is 50.4 billion tenge. The land area is 6.8 hectares, and the total building area is 47,995.28 square meters. The complex consists of 10 blocks with heights of 3, 5, 7, and 9 floors. Currently, the construction readiness of the facility is 70%.
Construction of the Kyzylorda Arena multifunctional sports complex began in July 2025. The general contractor is ASPAN HOLDINGS LLC. The project cost is 20.0 billion tenge. The land area is 2.1 hectares, and the total building area is 25,540.67 square meters. The facility is 65% complete.
Construction of Polyclinic No. 5, with a capacity of 400 visits per shift, in the Titov microdistrict of Kyzylorda, began in November 2025. The general contractor is Otau-Stroy LLC. The project cost is 9.3 billion tenge. The land area is 1.5 hectares, and the total building area is 8,937.71 square meters. Currently, the facility is 35% complete.
Design and estimate documentation for construction projects
Two new major projects are currently underway in Kyzylorda: the construction of a 200-bed perinatal center and the construction of a polyclinic with a capacity of 500 visits per shift on the Left Bank. Furthermore, in accordance with the Head of State's instructions given at the fifth meeting of the National Kurultai held in January of this year, construction has begun in Kyzylorda on a new 24-hour library costing 20 billion tenge, as well as a new drama theater building costing 20 billion tenge.
For the development of design and estimate documentation and the completion of state expert review
Under the budget program "Development of Mobilization Training and Emergency Facilities," 42,884,000 tenge have been allocated for the development of design and estimate documentation and the conduct of the state expert review for the project "Construction of a prefabricated fire station in the Left Bank microdistrict of Kyzylorda." Public procurement procedures are currently underway.
Architecture and Urban Development
Regarding the commissioning of residential buildings and public services:
From January to June 2026, 1,310 residential buildings with a total area of 353,044 square meters were commissioned in the region, representing a 100.7% increase compared to January to June 2025.
In order to populate the state urban planning cadastre information system with relevant data in accordance with Articles 37-40 of the Law of the Republic of Kazakhstan "On Architectural, Urban Planning, and Construction Activities of the Republic of Kazakhstan," 569 architectural planning assignments and 487 approved sketch designs issued by structural divisions of local executive bodies exercising functions in the field of architecture and urban development, as well as data on the 353,044 square meters of housing commissioned, have been fully entered into the system.
Regarding urban planning documentation:
For the purpose of developing (amending) the approved master plans for populated areas of the Kyzylorda region, the "Roadmap for the Development and Approval of Master Plans and Detailed Planning Projects (DPP) for Populated Areas of the Kyzylorda Region (Including Rural Populated Areas)" (hereinafter referred to as the Roadmap) was developed and approved in 2026.
In accordance with this Roadmap, the necessary funds were allocated from the regional and city budgets for the development of projects for amending the master plans, development plans, and construction plans for 45 populated areas of the region (including 6 district centers), as well as for the development of detailed planning projects for 5 new residential districts and a new master plan for the city of Kyzylorda (due to the expiration of the current master plan).
Currently, in accordance with the plan, work is underway for the developed projects to obtain the necessary approvals from interested government agencies and institutions, and to submit documents for environmental assessment and state expertise.
To date, four urban development projects have received positive conclusions from the State Expertise State Enterprise (GSE) and were subsequently approved by decisions of district maslikhats (government bodies). Vector and raster diagrams of these projects have now been submitted to the State City Cadastre State Enterprise (Gosgradkadastr) for review.
Schematic Designs:
To improve the architectural appearance of the planned construction sites, conceptual designs have been developed for improving the external façades of the following buildings:
The Engineering Park of Korkyt Ata University in Kyzylorda;
The façade of the Mustakhim Yksanov Kyzylorda Technical IT College;
A one-story residential building with 2 and 4 apartments;
Schematic designs have been developed for entry signs to be installed at the entrances to the region, districts, and rural settlements. Housing and Utilities Infrastructure Construction
Housing Construction and
Utilities Infrastructure
In 2026, 950,000 square meters of housing are planned to be commissioned using all funding sources.
From January to May 2026, 249,700 square meters of housing (101%) were commissioned using all funding sources.
In 2026, under the Housing and Utilities Infrastructure Development Concept for 2023–2029, 55.6 billion tenge (40.1 billion tenge in public funds and 15.5 billion tenge in securities) have been allocated from the state budget for housing construction and the acquisition of new finished apartments.
Using allocated budget funds:
Construction of two 7-story, 84-apartment residential buildings with credit facilities is underway on the left bank of the Syr Darya River in Kyzylorda (2.5 billion tenge).
Additionally, to provide housing for citizens on the housing waiting list, 2,277 ready-made new apartments will be purchased (53.1 billion tenge), including 1,332 rental apartments (1,292 for socially vulnerable groups in Kyzylorda and 40 apartments in the Zhanakorgan District), and 945 credit facilities in Kyzylorda.
In 2026, 7.2 billion tenge has been allocated from the regional budget for the implementation of 14 engineering and communications infrastructure projects in housing construction areas (11 electricity, 1 heat, 2 integrated utilities).
Including:
- Kyzylorda City (Kalasy) – 5 projects;
- Aralsky District – 3 projects;
- Kazalinsky District – 1 project;
- Shieli District – 3 projects;
- Zhanakorgan District – 2 projects.
To date, construction of two projects has been completed in Kyzylorda, and one boiler house and 52.8 km of electrical networks have been commissioned.
Construction of Social Facilities
Based on the results of the first nine months of 2025, 62.5 billion tenge was allocated from the state budget for the construction of social facilities. Ten social facilities are being built with these funds.
Reference:
1 facility in education;
5 facilities in healthcare;
1 facility in culture;
3 facilities in sports.
As part of the "Comfortable School" National Project, 13.3 billion tenge was allocated from the republican budget for the construction of 10 educational facilities. Construction and installation work has begun, and the facilities are scheduled to be commissioned by the end of this year.
The following facilities have been commissioned to date:
1. Construction of a gymnasium and a 20-seat cafeteria at Basic School No. 255 in the village of Bilibai, Zhanakorgan District, Kyzylorda Region;
2. Construction of the "Rukhaniyat" Center in the village of Terenozek, Syrdarya District, Kyzylorda Region;
3. Construction of a 400-seat physics and mathematics school with a 300-seat dormitory on the left bank of the SyrDarya River in Kyzylorda. Adjustment;
4. Construction of a 400-seat boarding school with a physics and mathematics focus and a 300-seat dormitory on the left bank of the Syr Darya River in Kyzylorda. No external utilities;
5. Construction of an innovative creativity center at the intersection of Sultan Beybars Street and N. Nazarbayev Avenue in Kyzylorda;
6. Construction of a 200-seat schoolchildren's center and a 50-seat arts school in the village of Shieli, Shieli District, Kyzylorda Region. Anchorage;
7. Construction of a music college on the left bank of the Syr Darya River in Kyzylorda. Above (elevation 0.000). Landscaping. External utility lines. Adjustments;
8. Reconstruction of the first-lift pumping station building and replacement of the water tower of the Syrdarya District Hospital, a state-owned enterprise on the right of economic management, located at the following address: Kyzylorda Region, Syrdarya District, Terenozek settlement, Toktybaeva Street, 13. Adjustments;
9. Construction of a historical and cultural heritage center located on the left bank of the Syr Darya River in the city of Kyzylorda, Kyzylorda Region;
10. Reconstruction and addition of a block to the multidisciplinary central district hospital in the village of Shieli, Shieli District, Kyzylorda Region;
11. Construction of an extension (infectious disease ward) with 30 beds to the Shieli Multidisciplinary Central District Hospital in the village of Shieli, Shieli District, Kyzylorda Region.
Design and estimate documentation for construction projects
Based on the results of the first nine months of 2025, the regional department of construction, architecture, and urban planning developed design and estimate documentation for 11 ongoing construction projects (total cost: 77,412,556 million tenge) and received positive expert opinions.
Specifically:
Healthcare facilities – 2 projects:
• "Construction of a 250-visit polyclinic in the city of Aral, Aral District";
• "Construction of a 400-bed polyclinic in the city of Kyzylorda"
Sports – 5 projects:
• "Construction of a sports and fitness complex in the city of Baikonur"
• "Construction of the Kyzylorda Arena in Kyzylorda";
• "Strengthening the structure of the Nursat summer tennis court in Kyzylorda";
• "Construction of a 7,000-seat stadium in Kyzylorda. Adjustments to increase capacity to 11,000";
• "Construction of a sports and fitness complex on the left bank of Kyzylorda."
Education – 2 projects:
• "Construction of a music college on the left bank of the SyrDarya River in Kyzylorda. (from the zero mark and above). Landscaping. External utility networks. Adjustments";
• "Construction of a 150-seat school in the village of Zhalanash, Aralsky District. Adjustments"; Development of government facilities – 1 project:
• "Construction of the Friendship House in Kyzylorda"
Public order protection – 1 project
• "Construction of a citizen's reception center for the Kyzylorda Region Police Department"
In addition, design estimates were developed for 3 more projects and submitted for expert review.
Including:
Healthcare facilities – 2 projects:
• "Construction of a 500-bed outpatient clinic in Kyzylorda";
• "Construction of a 300-bed multidisciplinary hospital (with an oncology department) with an outpatient clinic for 100 visits per shift in Kyzylorda (without external electrical networks). Adjustment of the design estimates."
Development of Mobilization Preparedness and Emergency Situations Facilities – 1 project:
• "Construction of specially equipped checkpoints for checking compliance with building input/output regulations, construction of an external electrical network to ensure uninterrupted power supply, construction of an external and internal network of autonomous (autonomous) heating boiler systems for buildings located in the city of Kyzylorda, the village of Tasboget, and the Sabalak tract."
Architecture and Urban Development
Regarding the commissioning of residential buildings and public services:
From January to August 2025, 2,474 residential buildings with a total floor area of 564,141 square meters were commissioned in the region, representing a 101.1% increase in commissioning compared to January to August 2024.
In order to fill the information system of the state urban planning cadastre with the relevant data in accordance with Articles 37-40 of the Law of the Republic of Kazakhstan "On architectural, urban planning and construction activities of the Republic of Kazakhstan", 1,561 architectural planning assignments and 1,588 approved sketch designs issued by structural divisions of local executive bodies exercising functions in the field of architecture and urban planning, as well as data on 564,141 square meters of housing put into operation, have been 100% entered into the specified system.
Regarding urban planning documentation:
For the purpose of developing (amending) master plans for settlements in the Kyzylorda region, a Roadmap for the Development (Amendment) of Master Plans, Development, and Construction Plans for Settlements in the Kyzylorda Region until 2025 (hereinafter referred to as the Roadmap) was developed and approved in 2023.
To amend the master plans, development, and construction plans for 53 settlements (including 6 district centers) in the region, as well as detailed planning projects for 4 new residential districts, and to develop a new master plan for the city of Kyzylorda (due to the expiration of the current master plan), the necessary funds have been allocated from the regional and city budgets for 2024-2025 in accordance with this Roadmap.
Currently, work is underway on the developed projects to obtain the necessary approvals from relevant government agencies and institutions, and to submit documents for environmental and state review. All work is scheduled for completion by the end of this year.
Preliminary Designs:
To improve the architectural appearance of the planned construction sites, preliminary designs have been developed for improving the external façades of the following facilities:
Regional Infectious Diseases Hospital;
Kyzylorda Regional Justice Department Building;
Music College Dormitory;
Schoolchildren's Palace;
Administrative Building;
A. Tazhibaev Regional Library;
Sports and Fitness Complex in Shieli.
Housing and Utilities Infrastructure Construction
Housing Commissioning Volume
In 2025, 870,000 square meters of housing is planned to be commissioned using all funding sources.
According to statistics for January-August 2025, 564,100 square meters of housing was commissioned, a 1.1% increase compared to the same period last year.
In 2025, 48.5 billion tenge has been allocated from the budget for the construction and acquisition of new housing under the Housing and Utilities Infrastructure Development Concept for 2023–2029 (3.8 billion tenge from the Republic of Bashkortostan, 4.2 billion tenge from the Oblast, and 40.5 billion tenge from securities issuance).
From these funds, 15 residential buildings with 650 apartments are being constructed. Of these, the following projects are underway:
- the construction of 5 50-apartment rental housing buildings with no option to buy in the city of Baikonur;
- the construction of 10 5-story, 40-apartment financed housing buildings on the left bank of the Syr Darya River in the city of Kyzylorda. To date, construction has been completed and 8 financed buildings (320 apartments) have been commissioned.
Furthermore, to provide housing for residents on the housing waiting list, 292 apartments in the city of Kyzylorda are planned to be purchased from the republican budget, while 2,688 apartments are planned to be issued through the regional securities issue (2,238 in the city of Kyzylorda, 100 in the Aralsky District, 100 in the Kazalinsky District, 50 in the Karmakshinsky District, 100 in the Shieli District, and 100 in the Zhanakorgan District). The regional budget will also finance the purchase of 42 apartments for residents of dilapidated buildings in the city of Kyzylorda. Since the beginning of the year, 345 apartments have been purchased in the city of Kyzylorda. The remaining apartments will be purchased by the end of the year.
Development and development of utility infrastructure in housing construction areas
In 2025, a total of 35.5 billion tenge (1.6 billion tenge from the National Fund of the Republic of Kazakhstan, 1.8 billion tenge from the Republic of Belarus, 2.1 billion tenge from the Public Fund, and 30.0 billion tenge from the issuance of securities) has been allocated from the state budget to connect utility networks to housing construction areas for the implementation of 57 projects (water - 6, electricity - 31, heat - 2, gas - 9, general planning, landscaping, and telephone - 3, and comprehensive information systems - 6).
Including:
- Kyzylorda city - 12 projects;
- Aral district - 6 projects;
- Kazaly district - 7 projects; - Karmakshy District – 2 projects;
- Zhalagash District – 1 project;
- Syrdarya District – 3 projects;
- Shieli District – 9 projects;
- Zhanakorgan District – 17 projects.
To date, construction of 5 projects has been completed (Kyzylorda City – 1, Aral District – 1, Karmakshy District – 1, Zhanakorgan District – 2), with 101.1 km of utility lines installed (12.6 km of gas, 88.5 km of electricity).
Construction of social facilities
Based on the results of 6 months of 2025, 72.5 billion tenge were allocated from the state budget for the construction of social facilities. 20 social facilities are being built with these funds.
Reference:
Education - 6 facilities;
Healthcare - 7 facility;
Culture - 3 facilities;
Sports rally - 3 facilities;
Utility networks - 1 facility;
As part of the national project "Comfortable School", 13.3 billion tenge were allocated from the republican budget for the construction of 10 educational facilities, of which 6 schools have been fully completed and commissioned. The construction of the remaining 4 schools is planned to be completed and commissioned by September.
List of facilities commissioned:
In the field of education;
1. Construction of a gym and a canteen for 20 people at primary school No. 255 in the village of Bilibay, Zhanakorgan district, Kyzylorda region.
2. Construction of the Innovation Creativity Center at the intersection of Sultan Beibarys Street and N. Nazarbayev Avenue in Kyzylorda
3. Construction of a 400-seat physics and mathematics school with a 300-seat dormitory on the left bank of the Syr Darya River in Kyzylorda. Without external networks
4. Construction of a 400-seat physics and mathematics school with a 300-seat dormitory on the left bank of the Syr Darya River in Kyzylorda. Adjustment
In the cultural sphere:
1. Construction of the Rukhaniyat center in the village of Terenozek, Syrdarya district, Kyzylorda region
Design and estimate documentation for construction projects
In 2025, through the regional department of construction, architecture and urban development, design and estimate documentation (hereinafter referred to as PSD) were developed for 7 ongoing construction projects (total cost - 45,630.9 million tenge), which received a positive expert opinion.
In particular:
- Healthcare facilities - 2 projects (Construction of a polyclinic for 250 visits in the city of Aralsk, Aral district, construction of a polyclinic for 400 beds in the city of Kyzylorda);
- Sports - 4 projects (Construction of sports and fitness centers in the city of Baikonur and on the left bank of the city of Kyzylorda, construction of the Kyzylorda Arena complex in the city of Kyzylorda, strengthening the structure of the Nursat tennis center in the city of Kyzylorda);
- Development of government facilities - 1 project (Construction of the Friendship House in the city of Kyzylorda).
In addition, design and estimate documentation was developed for 6 facilities and submitted for examination.
Including:
- Healthcare facilities - 1 project (Construction of a 500-bed polyclinic in the city of Kyzylorda);
- Education - 1 project (Construction of a 150-bed school in the village of Zhalangash, Aralsky District, Kyzylorda. Adjustment);
- Development of mobilization readiness and emergency response facilities - 1 project (Construction of specially equipped checkpoints (CP) in buildings located in the Sabalak tract, Tasböget village, Kyzylorda city, checking compliance with legal requirements upon entry and exit, construction of an external power supply line to ensure uninterrupted power supply, construction of an autonomous boiler house and external and internal utility networks);
- Public order - 1 project (Construction of a citizen reception center of the Kyzylorda Region Police Department);
- Sports - 2 projects (Construction of a stadium for 7 thousand seats in Kyzylorda city with adjustments to increase the capacity to 11 thousand seats, construction of a multifunctional sports and recreation complex in the Park of the First President in Kyzylorda city).
Architecture and urban development
On commissioning of residential buildings and public services:
In January-May 2025, 1,204 residential buildings with a total area of 247,282 square meters were commissioned in the region, which indicates an increase in commissioning by 104.6% compared to January-May 2024.
In order to fill the information system of the state urban planning cadastre with relevant data in accordance with Articles 37-40 of the Law of the Republic of Kazakhstan "On architectural, urban planning and construction activities of the Republic of Kazakhstan", 932 architectural planning assignments and 954 agreed draft designs issued by structural divisions of local executive bodies performing functions in the field of architecture and urban planning, as well as data on 247,282 square meters of housing commissioned are 100% entered into this system.
According to urban planning documentation:
In order to develop (make adjustments) to the master plans of settlements in the Kyzylorda region, in 2023 the Roadmap “Development (make adjustments) of master plans, development schemes and construction of settlements in the Kyzylorda region until 2025” (hereinafter referred to as the Roadmap) was developed and approved.
In order to make adjustments to the master plans, development and construction schemes of 53 settlements (including 6 district centers) in the region, as well as detailed planning projects for 4 new residential areas and the development of a new master plan for the city of Kyzylorda (due to the expiration of the master plan), the necessary funds have been allocated from the regional and city budgets for 2024-2025 in accordance with the specified roadmap.
Currently, in accordance with the plan for the developed projects, work is underway to obtain the necessary approvals from interested government agencies and institutions, submit documents for environmental and state expertise. All work is planned to be completed by the end of this year.
Sketch designs:
In order to improve the architectural appearance of the facilities planned for construction, sketch designs have been developed to improve the external facades of the following facilities:
Regional Infectious Diseases Hospital;
Building of the Justice Department of the Kyzylorda Region;
Music College Dormitory;
Schoolchildren's Palace;
Administrative Building;
Regional Library named after A. Tazhibaev;
Sports and Recreation Complex in the town of Shieli
Construction of housing and engineering and communications
infrastructure
In 2025, within the framework of the Concept for the Development of Housing and Public Utilities for 2023-2029, 31.0 billion tenge were allocated for housing construction (RB - 3.8 billion tenge, OB - 1.7 billion tenge, through the issue of securities - 25.5 billion tenge).
With budget funds of 0.5 billion tenge, 15 residential buildings with 650 apartments are being built. Of these:
For rental housing without the right to buy, the construction of five 50-apartment residential buildings in the city of Baikonur.
For the construction of credit housing, the construction of 5-story 40-apartment 10 houses on the left bank of the Syr Darya River in the city of Kyzylorda.
Along with this, in order to provide housing to socially vulnerable groups of the population of the city of Kyzylorda from among those on the waiting list, it is planned to purchase 292 apartments for 3.8 billion tenge from the republican budget, the purchase of 1,688 apartments for 25.0 billion tenge through the issue of securities.
In January-June 2025, 136 apartments were purchased. The remaining apartments will be purchased by the end of the year.
In 2025, 1.7 billion tenge was allocated from the regional budget for the purchase of 135 apartments for citizens of the city of Kyzylorda, whose only housing is recognized as emergency. The apartments will be purchased by the end of the year.
In 2025, the commissioning of 870.0 thousand square meters of housing is planned in the region at the expense of all sources of financing.
According to statistics for January-May 2025, 247.3 thousand square meters were commissioned. meters of housing, which is 4.6% higher than the same period in 2024. The fact for the first half of 2025 will be provided after receiving the statistical data.
In 2025, 35.4 billion tenge were allocated from the state budget for the implementation of 75 projects for connecting engineering and communications infrastructure to residential buildings (water - 7, electricity - 48, heat - 1, gas - 12, general plan and telephone - 3, comprehensive information and communications - 4) (NF RK - 1.6 billion tenge, RB - 1.8 billion tenge, OB - 1.9 billion tenge, bonds - 30.0 billion tenge).
Of these:
- Kyzylorda city - 11 projects;
- Aralsky district - 9 projects;
- Kazalinsky district - 9 projects;
- Karmakshinsky district - 5 projects;
- Zhalagash district – 3 projects;
- Syrdarya district – 4 projects;
- Shieli district -12 projects;
- Zhanakorgan district – 22 projects.
Construction of social facilities
Based on the results of 3 months of 2025, KZT 72.5 billion were allocated from the state budget for the construction of social facilities. These funds are used to build 12 social facilities.
Reference:
Education - 4 facilities;
Healthcare - 4 facilities;
Culture - 2 facilities;
Sports rally - 1 facility;
Utility networks - 1 facility;
As part of the national project "Comfortable School", KZT 13.3 billion were allocated from the republican budget for the construction of 10 educational facilities, construction and installation work has begun. Commissioning is planned for the end of this year.
List of facilities commissioned:
In the field of education;
Construction of a gym and a canteen for 20 people at primary school No. 255 in the village of Bilibay, Zhanakorgan district, Kyzylorda region.
Design and estimate documentation for construction projects
In 2025, through the regional department of construction, architecture and urban development (for a total of KZT 14.4 million), design and estimate documentation was developed for 4 transitional construction projects (hereinafter referred to as DED), positive expert opinions were received.
Including:
- Healthcare facility - 1 project (construction of a polyclinic for 250 visits in the city of Aral, Aral region);
- Sports - 2 projects (Construction of a physical education and health complex in the city of Baikonur and on the left bank of the city of Kyzylorda);
- Development of government facilities - 1 project (construction of the House of Friendship in the city of Kyzylorda);
In addition, at this time, DED for 5 transitional objects is being developed and submitted for expert review.
Of these: healthcare facilities - 2 projects (construction of polyclinics for 400 and 500 beds in Kyzylorda), sports - 2 projects (Construction of Kyzylorda Arena, strengthening the construction of the Nursat summer tennis court in Kyzylorda);
Public order protection - 1 project (construction of the Citizens' Reception Center of the Kyzylorda Region Police Department).
Architecture and urban development
On commissioning of residential buildings and public services:
In January-February 2025, 472 residential buildings with a total area of 110,974 square meters were commissioned in the region, which indicates an increase in commissioning by 139.9% compared to January-February 2024.
In order to fill the information system of the state urban development cadastre with relevant data in accordance with Articles 37-40 of the Law of the Republic of Kazakhstan "On architectural, urban planning and construction activities of the Republic of Kazakhstan", 749 architectural planning assignments and 668 agreed draft designs issued by structural divisions of local executive bodies performing functions in the field of architecture and urban development, as well as data on 110,974 square meters of housing commissioned are 100% entered into this system.
According to urban planning documentation:
In order to develop (make adjustments) to the master plans of settlements in the Kyzylorda region, in 2023 the Roadmap "Development (make adjustments) of master plans, development and construction schemes for settlements in the Kyzylorda region until 2025" (hereinafter referred to as the Roadmap) was developed and approved.
In order to make adjustments to the master plans, development and construction schemes of 53 settlements (including 6 district centers) in the region, as well as detailed planning projects for 4 new residential areas and the development of a new master plan for the city of Kyzylorda (due to the expiration of the master plan), the necessary funds for 2024-2025 have been allocated from the regional and city budgets in accordance with the specified roadmap.
Currently, in accordance with the plan for the developed projects, work is underway to obtain the necessary approvals from interested government agencies and institutions, and submit documents for environmental and state expertise. All work is planned to be completed by the end of this year.
Sketch designs:
In order to improve the architectural appearance of the planned construction sites, sketch designs have been developed to improve the external facades of the following sites:
Regional Infectious Diseases Hospital;
Building of the Kyzylorda Region Justice Department;
Music College Dormitory;
Schoolchildren's Palace;
Administrative Building;
A. Tazhibaev Regional Library;
Sports and Health Complex in the Shieli Village.
Housing and utility infrastructure construction
In 2025, within the framework of the Housing and Utilities Development Concept for 2023–2029, it is planned to commission 870,000 square meters of housing using all sources of financing. For these purposes, KZT 5.5 billion have been allocated from the budget for housing construction and the purchase of new apartments this year, including KZT 3.8 billion from the republican budget and KZT 1.7 billion from the regional budget.
From the regional budget, 15 residential buildings with 650 apartments are being built. Of these:
For rental housing without the right to purchase, the construction of five 50-apartment residential buildings in the city of Baikonur.
For credit housing, the construction of 5-story 40-apartment 10 residential buildings on the left bank of the Syrdarya river in the city of Kyzylorda.
Along with this, in order to provide housing to citizens on the waiting list for the purchase of 292 apartments for socially vulnerable groups of the population, KZT 3.8 billion were allocated from the republican budget.
For the purchase of 135 apartments for citizens of Kyzylorda, whose only housing is recognized as emergency, KZT 1.7 billion were allocated from the regional budget.
In January-March 2025, 156.0 thousand square meters of housing were commissioned from all sources of funding, which amounted to 101.4% of the corresponding period last year.
In 2025, KZT 4.9 billion were allocated from the state budget for the implementation of 14 projects for connecting utility networks to residential development areas (electricity - 10, heat - 1, gas - 1, general plan and telephone installation - 1, comprehensive information and communications - 1) (NFRK – KZT 1.6 billion, RB – KZT 1.8 billion, OB – KZT 1.4 billion).
Of these:
- in the city of Kyzylorda - 7 projects;
- in the Aralsk district - 4 projects;
- in the Shieli district - 1 project;
- in the Zhanakorgan district - 2 projects.
In 2024, design and estimate documentation (referred to as DED) for 53 construction projects is being developed by the regional department of construction, architecture, and urban development.
Of these, DED for 31 projects is funded by the local budget, while 22 projects are sponsored. This includes:
- Construction and reconstruction of preschool education and training facilities: 4 projects (4 kindergartens);
- Healthcare facilities: 3 projects;
- Construction of public order and safety facilities: 1 project;
- Sports facilities: 2 projects DED for which a positive expert opinion was received includes:
- Healthcare facilities: 31 projects (construction of 10 outpatient clinics, 2 paramedic-obstetric posts, 9 outpatient clinics, 2 external engineering structures for the construction of paramedic-obstetric posts, and construction of infectious auxiliary departments for 3-25 and 30 beds) ;
- Educational facilities: 7 projects (1 creative center, Bekarystan bi school for 250 students, Muratbaev school for 250 students, Zholek kindergarten for 90 students, and a music college) - Cultural facilities: 1 project (1 museum);
- Administrative buildings: 2 projects (2 administrative buildings) ;
- Construction of public order and security facilities: 2 projects.
According to the results of 9 months of 2024, KZT 79.9 billion were allocated from the state budget for the construction of social facilities. 61 social facilities are being built with these funds.
For reference:
Education - 7 facilities;
Healthcare - 22 facilities;
Culture - 9 facilities;
Sports rally - 2 facilities;
Government agencies - 1;
As part of the national project "Comfortable School", KZT 24.5 billion were allocated from the republican budget for the construction of 10 educational facilities, construction and installation work has begun. Commissioning is planned for the end of this year.
List of facilities commissioned:
In the field of education;
1. Construction of a school for 300 students in the Maybeket microdistrict, Zhanakorgan village, Zhanakorgan district.
2. Construction of an educational building for primary schools for 375 students on Seifullina Street No. 4, Shieli village, Shieli district.
3. Construction of an extension to the school with the demolition of the emergency sports hall and workshop of school No. 4 named after S. Seifullin, Kyzylorda (educational building and canteen for 100 people);
4. Construction of a sports hall to the building of boarding school-lyceum No. 284 in the village of Zhosaly, Karmakshy district;
5. Construction of an educational building of the primary school for 375 students on Makhanbet Kenebayev Street No. 34, Besaryk village, Zhanakorgan district. Linking;
6. Construction of a school for 150 students in the village of Baikenzhe, Zhanakorgan district, Kyzylorda region;
7. Palace of schoolchildren of Kyzylorda.
In the field of healthcare;
1. Construction of a medical post in the village of Koktem, Sapak rural district, Aral district, Kyzylorda region.
2. Construction of an outpatient clinic in the village of Baimurat, Kyzylorda city, Kyzylorda region.
In the field of culture:
1. Multifunctional complex in the city of Kyzylorda, Kyzylorda region.
In the field of public order:
1. Construction of a district police post in the Baiterek-1 microdistrict of the city of Kyzylorda.
In the field of sports:
1. Construction of a table tennis center on the left bank of the Syrdarya river, Kyzylorda city. Without external utility networks.
In utility networks:
1. Construction of school No. 94 for 300 students, Zhangozha batyr E. M, Kazaly district, Kyzylorda region. External utility networks and structures;
2. Construction of a school for 300 students in the Arai microdistrict of the city of Aral, Kyzylorda region. External engineering networks and structures;
3. Construction of a school for 300 students in the village of Saksaul, Aral district, Kyzylorda region. External engineering networks and structures;
4. Construction of a school for 600 students in the village of Zhanakorgan, Zhanakorgan district, Kyzylorda region. External engineering networks and structures;
5. Construction of a school for 1,500 students in the SPMK-70 microdistrict of the city of Kyzylorda, Kyzylorda region. External engineering systems and structures;
6. Construction of a school for 1,500 students in the Ara microdistrict of the city of Kyzylorda, Kyzylorda region. External engineering systems and structures;
7. Construction of a school for 300 students in the village of Zhanaaryk, Zhanakorgan district, Kyzylorda region. External engineering networks and structures;
8. Construction of a school for 900 students on the left bank of the city of Kyzylorda. External engineering systems and structures.
9. Construction of a school for 600 students in the Akmarzhan microdistrict (KBI) of Kyzylorda. External engineering systems and structures.
Design and estimate documentation for construction projects
For 9 months of 2024, the regional department of construction, architecture and urban development is developing design and estimate documentation (hereinafter referred to as DED) for 53 projects. Of these, 31 projects began design work in 2023, 22 projects - in 2024.
Of these, 31 objects are being implemented at the expense of the local budget, 22 objects - at the expense of sponsors.
Including:
- construction and reconstruction of preschool education facilities - 4 projects (4 kindergartens);
- healthcare facilities - 4 projects;
- public order and safety facilities - 3 projects;
- physical education and sports facilities - 2 projects.
Design and estimate documentation that received positive expert opinions:
- healthcare facilities - 30 projects (construction of 9 outpatient clinics, 2 feldsher-obstetric stations, construction of external engineering structures of 9 outpatient clinics, 2 feldsher-obstetric stations, construction of 3 infectious disease departments with 25 and 30 beds);
- education facilities - 7 projects (1 center for innovative creativity, 2 schools for 250 children in the villages of G. Muratbaev and Bekarystan bi, 1 project - a kindergarten for 90 children in the village of Zholek, 2 projects of a music college);
- cultural facilities - 1 project - a museum;
- administrative buildings - 2 projects (Aral district, Kazaly district).
Architecture and urban development
Public service:
The Department of Architecture, Urban Development and Monitoring received 1 request for the public service "Issuance of a decision on the construction of religious buildings (structures) and determination of their location" and "Issuance of a decision on the repurposing (change of functional purpose) of buildings (structures) into religious buildings (structures)", 1 was satisfied.
On the urban development cadastre:
In accordance with the instruction of the Deputy Prime Minister of the Republic of Kazakhstan Sklyar R.V., an inventory of underground and overground communications was carried out on 16986.44 hectares of built-up territory of the Kyzylorda region on 19140 hectares in accordance with the detailed roadmap for the formation and maintenance of the state urban development cadastre. This is 88.7% of the total work.
For the inventory of underground and above-ground communications of the villages of Zhalagash and Zhosaly, planned for 2024, KZT 82.4 million have been allocated from the regional budget; the inventory is currently being carried out.
In addition, for 9 months of 2024, 2,512 residential buildings with an area of 558,218 sq. m. in the region are entered into the automated information system of the state urban development cadastre.
In accordance with the action plan for the development of urban development projects for settlements in the Kyzylorda region, the development of keys to the transition, the red line and functional zoning in the city of Kyzylorda, the general plan of the city of Kyzylorda, linked to the WGS-84 coordinate system, and detailed planning projects developed in accordance with the general plan, as well as vector and raster diagrams of the corresponding formats, explanatory notes and resolutions on the approval of urban development documents have been entered into the database of the state urban development cadastre.
Sketch designs:
In order to improve the architectural appearance of the planned objects, sketch designs have been developed and recommendations have been given.
Namely:
School;
Rural club;
Physical culture and health complex;
Wedding palace;
Multi-profile complex;
Two-apartment houses;
A sketch design for the interior of the Rukhaniyat center has been developed and presented.
Construction of housing, engineering and communications infrastructure
In 2024, within the framework of the Concept for the Development of Housing and Public Utilities for 2023-2029, KZT 37.1 billion were allocated for housing construction, of which KZT 3.8 billion from the republican budget, KZT 4.1 billion from the regional budget, KZT 29.2 billion from the issue of securities (KZT 20.7 billion - Samuryk Kazyna, KZT 8.5 billion Kazakhstan Housing Company).
Budget funds are used to build 21 residential buildings with 1,154 apartments. Of these:
For rental housing without the right to buy, the construction of five 50-apartment residential buildings in the city of Baikonur.
For the construction of credit housing, the construction of 7-story 84-apartment 6 buildings, 5-story 40-apartment 10 buildings on the left bank of the Syrdarya River in the city of Kyzylorda.
Along with this, in order to provide housing to socially vulnerable groups of the population from among those on the waiting list for the purchase of 296 apartments, KZT 3.8 billion were allocated from the republican budget, 1,400 apartments will be purchased by issuing securities for KZT 20.7 billion.
To date, 351 apartments have been purchased, of which 89 are in Kyzylorda, 35 in the Aral district, 34 in the Kazaly district, 80 in the Karmakshy district, 61 in the Syrdarya district, and 52 in the Shieli district. The remaining apartments will be purchased by the end. KZT 1.7 billion was allocated from the regional budget for the purchase of 135 apartments for residents of dilapidated buildings.
In January-September 2024, 646.2 thousand square meters of housing were commissioned from all sources of financing, which is 104.6% of the corresponding period last year.
In 2024, a total of KZT 11.7 billion was allocated from the budget for the implementation of 52 projects of engineering and communications infrastructure networks in the territory of residential development (water and sewerage - 6, electricity - 31, heat - 2, gas - 7, road - 2, general plan and telephone installation - 3, gas + water - 1, water + gas + electricity - 1) (NF RK – KZT 8.6 billion, RB – KZT 0.4 billion, OB – KZT 2.6 billion).
Of these: Kyzylorda city - 19 projects; Aral district - 6 projects; Karmakshy district - 4 projects; Zhalagash district - 3 projects; Syrdarya district - 5 projects; Shieli district - 3 projects; Zhanakorgan district - 12 projects.
10 projects in the city of Kyzylorda, 2 projects in the Syrdarya district have been completed and 49 km of utility networks have been connected (water - 6.1 km, electricity - 15.8 km, gas - 0.2 km and 1 gas distribution station, telephone - 5.0 km, roads - 18.9 km).
For 6 months in 2024, design and estimate documentation for 34 projects was developed, and positive results of expertise were received. KZT 32.1 billion was the total cost of the projects.
Of these, 16 projects worth KZT 11.5 billion were implemented at the expense of the local budget, while 18 objects worth KZT 20.6 billion were implemented at the expense of sponsors.
Including:
Education facilities: 5 projects (2 schools, 1 center of innovation, 1 kindergarten, 1 extension). The total cost is KZT 15.887 billion.
Healthcare - 27 projects total costing KZT 10.811 billion.
Culture - 1 project worth KZT 1.785 billion.
Administration building - 2 projects worth KZT 3.621 billion.
As a result of 3 months of 2024, design and estimate documentation of 12 objects were developed. The positive results of complex non-departmental expertise were received.
For reference:
Education sector – 1 object;
Healthcare sector – 11 objects;
Design and estimate documentation of 12 objects are being developed.
For reference:
Education sector – 6 objects;
Healthcare sector – 15 objects;
Culture sector – 3 objects;
State bodies – 1.
Over the 12 months of 2023, the regional design and estimate documentation for 36 projects was created by department of construction, architecture and urban planning and received positive conclusion of the examination. The total cost of projects amounts to KZT 60 460 billion.
From them, 16 facilities worth KZT 34 077 billion were implemented at the expense of the local budget, 20 facilities – at the expense of sponsors worth KZT 26383 billion.
Including:
- Facilities of education - 21 projects (1 school, 9 external engineering networks, 2 Schoolchildren’s Palace, 9 extensions), total cost – KZT 13 470 billion.
- healthcare – 1 project, total cost – KZT 2659 billion.
- sports facilities – 3 projects, total cost – KZT 30 563 billion.
- outdoor engineering networks of multifunctional complex – KZT 110 661 million.
- the construction of bus station at the left bank – KZT 1015 billion.
- administrative buildings- repair of the railway station building and construction of the Rukhaniyat centers in Aral, Kazaly, Karmakshy, Syrdarya, Shieli, Zhalagash, Zhanakorgan districts – KZT 12 641 billion.
In addition, 19 construction projects (5 for education, 14 for healthcare) are being developed and evaluated.
Design and estimate documentation of construction projects
Over the 9 months of 2023, the regional department of construction, architecture and urban planning developed design and estimate documentation for 12 projects and received a positive expert opinion. The total cost of the projects is KZT 35.585 billion .
Including:
- educational facilities – 8 projects (7 schools, 1 schoolchildren’s palace), total cost is KZT 6.662 billion;
- sports facilities – 2 project, total cost is KZT 27.979 billion.
- external engineering networks of a multifunctional complex – KZT 110.661 million.
- construction of a bus station on the left bank - KZT 1.015 billion .
In addition, design and estimate documentation is being developed for 31 construction projects (education - 15, healthcare - 14, culture - 2). Of these, 13 projects are under examination, 6 are moving forward.
DEVELOPMENT OF DESIGN AND ESTIMATE DOCUMENTATION
For 12 months of 2022, design estimates for 53 construction projects were developed through the regional department of construction, architecture and urban planning, and a positive expert opinion was received. The total cost of the projects is KZT 71.9 billion.
Including:
- educational facilities - 6 projects (6 schools), total cost – KZT 11.0 billion;
- healthcare facilities - 24 projects (1 multidisciplinary hospital, 17 outpatient clinics, 6 medical stations), total cost – KZT 45.0 billion;
- sports facilities - 4 projects (4 sports complexes), total cost - 2.0 billion;
- cultural facilities - 3 projects (3 clubs, total cost – KZT 1.6 billion;
- objects of agriculture - 4 projects (4 veterinary points),
- total cost – KZT 264.7 million;
- objects of public order - 1 project (1 precinct police post),
total cost – KZT 120.4 million;
- objects of mobilization training - 3 projects,
total cost – KZT 78.5 million;
Also, with the support of sponsors at their own expense, KZT 189.2 million was allocated for the development of design and estimate documentation for 8 construction projects (5 schools, 1 art school, 1 object of the state body). The total estimated cost of 8 facilities is KZT 9.4 billion.
Namely:
URBAN PLANNING CADASTRE
Deputy Prime Minister of the Republic of Kazakhstan R.V. In accordance with the task of Sklyar, in accordance with the detailed roadmap for the formation and maintenance of the State Urban Cadastre, an inventory of underground and surface utilities was carried out on 13,321.44 hectares of a built-up area of 19,140 hectares in Kyzylorda region. This is 69.6% of the total work.
In 2022, in order to implement the national project, KZT 134.6 million was allocated from the regional budget, and the work was carried out in accordance with the plan.
In addition, 604,022 square meters of housing have been commissioned in the region, 2,309 residential buildings with an area of 584,387 square meters are included in the automated information system of the state urban cadastre.
This accounts for 96 percent of the jobs listed.
Sketch projects:
In order to improve the architectural appearance of the planned facilities, draft designs were developed and recommendations were given.
Namely:
5-12-storey residential building planned for construction on the left bank of the Syrdarya River, Kyzylorda city (option 3);
Passport of the entrance border of Kyzylorda region (Option 5);
School No. 207 for 250 students S. Baisyn, Shieli district, Kyzylorda region;
The building of a diversified complex;
Matrimonial Palace;
Central Stadium;
Shieli district, Shieli village, sports and recreation complex.
Urban planning documentation:
In accordance with the minutes of the meeting “On providing settlements with master plans”, held on November 22, 2022 under the chairmanship of the Vice Minister of Industry and Infrastructure Development of the Republic of Kazakhstan Y. Daulbaev, a roadmap was developed for the development (amendment) of master plans, development and development schemes settlements of Kyzylorda region until 2025.

| № | Announcement name | Customer | link |
| Department of Physical Education and Sport | |||
| 1 | Overhaul of football, volleyball and basketball courts of MSI "Educational specialized boarding school, College of Olympic Reserve named after Zh.Bakhadur of the Department of Physical Training and Sport of Kyzylorda region" | Department of Physical Education and Sports | https://goszakup.gov.kz/ru/announce/index/4248670?tab=documents |
| 2 | Current repair of the building of MSI "OSDYUSHOR No. 6" | Department of Physical Education and Sports | https://www.goszakup.gov.kz/ru/announce/index/4257658?tab=documents |
| 3 | Current renovation of the building of MSI "Regional Specialized Children and Youth School of Olympic Reserve No. 2 Department of Physical Culture and Sport of the Kyzylorda Region" | Department of Physical Education and Sports | https://www.goszakup.gov.kz/ru/announce/index/4257020?tab=documents |
| 4 | Current repair of buildings of KSU "Karmakshy district specialized children's and youth school of the Olympic reserve No. 15 of the Department of Physical Education and Sport of Kyzylorda region " |
Department of Physical Education and Sports | https://www.goszakup.gov.kz/ru/announce/index/4256907? tab=documents |
| 5 | Current repair of buildings MSI "Kazaly district specialized children's and youth school of the Olympic reserve No. 17 of the Department of Physical Education and Sport of Kyzylorda region" | Department of Physical Education and Sports | https://www.goszakup.gov.kz/ru/announce/index /4256558?tab=documents |
| 6 | Current renovation of the boiler house building Aral district DYUSHSOR No.19 | Department of Physical Education and Sports | https://www.goszakup.gov.kz/ru /announce/index/4254763? tab=documents |
| 7 | Current repair of the building of the MSI "Regional Specialized Children and Youth School of the Olympic Reserve No. 1 of the Department of Physical Training and Sport of Kyzylorda region" | Department of Physical Education and Sports | https://www.goszakup.gov.kz/ru/announce/index/4254682? tab=documents |
| Управление пассажирского транспорта и автомобильных дорог Кызылординской области | |||
| 8 | Реконструкция автомобильной дороги районного значения «Айтеке би - Казалы» Казалинского района | Управление пассажирского транспорта и автомобильных дорог Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3821712?tab=documents |
| 9 | "Капитальный ремонт аварийных мостов автомобильной дороги "Кызылорда-Жалагаш-Самара-Шымкент" км 26+850, км 76+300, км 90+150, Кызылординской области" | Управление пассажирского транспорта и автомобильных дорог Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4227607?tab=documents |
| 10 | "Капитальный ремонт разрушенных участков автомобильной дороги областного значения "Жалагаш-Жосалы" Кармакшинского района Кызылординской области" | Управление пассажирского транспорта и автомобильных дорог Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3903258?tab=documents |
| 11 | Капитальный ремонт моста на 8,7 км автомобильной дороги областного значения "Самара-Шымкент-Жанакорган- Тугускен -Келинтобе" в Жанакорганском районе Кызылординской области |
Управление пассажирского транспорта и автомобильных дорог Кызылординской области | https://www.goszakup.gov.kz/ru/announce/index/4243130? tab=documents |
| 12 | Средний ремонт автомобильной дороги областного значения "Самара-Шымкент- Тартогай" участок 7,4 км в Шиелинском районе Кызылординской области |
Управление пассажирского транспорта и автомобильных дорог Кызылординской области | https://www.goszakup.gov.kz/ ru/announce/index/4245057? tab=documents |
| Управление строительства, архитектуры и градостроительства Кызылординской области | |||
| 13 | Строительство школы на 600 мест в квартале №2 по ул.Жаппасбай батыра в г.Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/2351386?tab=documents |
| 14 | Строительство средней школы №34 на 140 мест аульного округа имени М.Шаменова, Жалагашского района, Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3143773?tab=documents |
| 15 | Строительство учебно-тренировочного полигона по военной и специализированной подготовке Кызылординского областного ДВД | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/1733202?tab=documents |
| 16 | Строительство железнодорожного тупика в городе Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://www.gov.kz/memleket/entities/kyzylorda-saulet/projects/details/1158?lang=kk |
| 17 | Строительство теннисного центра в городе Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/2878731?tab=documents |
| 18 | Строительства дома культуры на 600 мест в кенте Айтеке би Казалинского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/2689182?tab=documents |
| 19 | Строительство детского сада на 90 мест ауыльного округа Майлыбас, село Аксуат Казалинского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/2999475?tab=documents |
| 20 | Строительство административного здания на левом берегу Сырдарья в городе Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3861577?tab=documents |
| 21 | Строительство административного здания в кенте Айтеке би Казалинского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3823668?tab=documents |
| 22 | Реконструкция административного здания на устройство пристройки для комнат временного задержания Кармакшинского районного отдела внутренних дел Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4045079?tab=documents |
| 23 | Реконструкция административного здания на устройство пристройки для комнат временного задержания Шиелийского районного отдела внутренних дел Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4020734?tab=documents |
| 24 | Реконструкция административного здания на устройство пристройки для комнат временного задержания городского управления внутренних дел в городе Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3992901?tab=documents |
| 25 | Реконструкция и расширение здания поликлиники под детский сад в ауле Айдарлы Сырдарьинского района | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3888968?tab=documents |
| 26 | Строительство летне-зимнего лагеря для отдыха детей в Кармакшинского районе Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/1740104?tab=documents |
| 27 | Строительство центра дополнительного образования им. Ш.Есенова на 150 мест в г.Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3001145?tab=documents |
| 28 | Строительство больницы на 40 коек в поселке Саксаульск Аральского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/2999928?tab=documents |
| 29 | Строительство центральной районной больницы на 100 коек в поселке Жалагаш, Жалагашского района, Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3261570?tab=documents |
| 30 | Cтроительство здания дома школьников в г. Аральск, Қызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3143755?tab=documents |
| 31 | Строительство школы на 600 мест по улице Б. Байкенжеева в поселке Жанакорган, Жанакорганского района, Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3403737?tab=documents |
| 32 | Строительство поликлиники на 250 посещений в кенте Айтеке би Казалинского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3649231?tab=documents |
| 33 | Строительство школы на 300 мест в поселке Жанакорган Жанакорганского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3823103?tab=documents |
| 34 | Реконструкция здания медико-социального реабилитационного отделения расположенного по адресу: г.Кызылорда, сельского округа Акжарма, ул.Н.Тасымова, 60 | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4285692?tab=documents |
| 35 | Строительство дополнительного здания историко-краеведческого музея в п.Шиели Шиелийского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4286035?tab=documents |
| 36 | Строительство вспомогательных помещений к зданию филармонии по адресу город Кызылорда, улица Е. Ауельбекова №5 | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4286000?tab=documents |
| 37 | Строительство гребной базы байдарки и каноэ по адресу: город Кызылорда, ул.Гидроузел №21 | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4285966?tab=documents |
| 38 | Реконструкция футбольного поля, подчиненного областной специализированной детско-юношеской школе олимпийского резерва № 6 по адресу Сулейменова № 69 г.Кызылорда | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4029382?tab=documents |
| 39 | Строительство физкультурно - оздоровительного комплекса в поселке Жаксыкылыш Аральского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4394932?tab=documents |
| 40 | Строительство пристройки на 100 ученических мест к средней школе № 19 в поселке Жаксыкылыш Аральского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4397648?tab=documents |
| 41 | Строительство дома школьников на 200 и школы искусства на 50 мест в пос.Жалагаш, Жалагашского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4395546?tab=documents |
| 42 | Строительство сельского клуба на 150 мест в поселке Шалкия Жанакорганского района Кызылординской области | Управление строительства, архитектуры и градостроительства Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4312491?tab=documents |
| Управление по мобилизационной подготовке Кызылординской области | |||
| 43 | Очистка русла реки Сырдарьи в пределах города Кызылорды в целях предотвращения затопления | Управление по мобилизационной подготовке Кызылординской области | https://goszakup.gov.kz/ru/announce/index/3969553?tab=documents |
| 44 | Восстановление защитной дамбы на участке изгиб Жусипали возле населенного пункта Кызылжар Аральского района | Управление по мобилизационной подготовке Кызылординской области | https://goszakup.gov.kz/ru/announce/index/4398620?tab=documents |
| 45 | Работы по очистке русла канала населенного пункта "Кумбазар" аульного округа "Бекбаул" Аральского района |
Управление по мобилизационной подготовке |
https://www.goszakup.gov.kz/ru/announce/index/4489744 |
| Управления образования Кызылординской области | |||
| 46 | Капитальный ремонт здания учебного корпуса и мастерской КГКП "Аральский индустриально-технический колледж" Управления образования Кызылординской области | Управления образования Кызылординской области | |