Information on the work done on the development of the road network at the end of 2020
The length of the roads in the Kyzylorda region is 3397 km. Of these, 1,016 km are motor roads of republican significance, 557 km are of regional significance and 1,824 km are of regional significance (the length of roads of district significance is 2,381 km).
In 2020, 19,726.6 million tenge were allocated for the development of a network of local roads (RB - 11,854.0 million tenge, OB - 7,872.6 million tenge). Highways, streets and bridges with a length of 492 km were repaired, including:
1) Under the Nurly Zhol program - 5,246.3 million tenge (repair of 136 km of regional and district roads);
2) Under the program "Development of regions" - 1,530.5 million tenge;
3) Under the program "Auyl - el besigі" - 1,779.5 million tenge (average repair of 66 streets with a length of 72 km);
4) Under the Employment Roadmap program - 8 853.0 million tenge
5) 2 317.3 million tenge were allocated from the local budget to ensure the functioning of highways, repair of streets in settlements and bridge crossings. 30.4 km of streets and roads were repaired. (on 2 streets of the Left Bank highway-847.7 million tenge, overhaul of the Kelintobe-Kandoz road-1202.8 million tenge, PSD-38.9 million tenge, PPP) - 37.6 million tenge current repairs and maintenance - 192 , 7 million tenge).
As a result of 2020, 19 550.0 million tenge and 99% were spent.
Unused funds - 176.6 million tenge:
- In connection with the uncertainty of the technical supervision of the project for the construction of a transport interchange at the junction of the main street to the highway "Western Europe-Western China" on the left bank of the Syrdarya river in Kyzylorda - 100.0 million tenge;
- Savings under the Employment Roadmap program - 70.6 million tenge;
- Savings under the Nurly Zhol program - 6.0 million tenge.
In 2020, the indicator "the share of roads in good and satisfactory condition" will reach 70%.
According to the work done in 9 months of development of the road network in 2020
Reference
The total length of highways in the territory of Kyzylorda region is 3398 km. Of these, 1,016 km are roads of republican, 557 km of regional, and 1,825 km of district significance.
In 2020, 19,930. 6 million tenge was allocated for the development of a network of local roads in the region (RB-11,614. 8 million tenge), OB-8,315. 4 million tenge). With these funds, it is planned to repair roads, streets and bridge crossings with a length of 498 km. This year, funds are mainly allocated through 4 state programs.
In particular:
1) under the" Nurly Zhol " program - $ 5,434.6 million tenge was allocated. These funds are used to repair roads of regional and district significance with a length of 136 km.
2) under the program" Development of Regions " - 1 189.0 million tenge was allocated (construction of a street from S. Beybars Street to the Kyzylzharma Canal in Kyzylorda - 4.6 km).
3) under the program "Auyl-el besigi" - 1 887.3 million tenge. (72 km, 66 streets).
4) under the Employment Roadmap program, 9,602. 6 million tenge was allocated. RB-6 124.0 million tenge, OB-3 478.6 million tenge. (263 projects, major and medium repairs of 255 km of roads, streets and bridges. It is planned to create 2639 jobs).
5) maintenance of roads, repair of streets and bridges of settlements- $ 1,817. 1 million.30.4 km of streets and highways were allocated. (Construction of 2 streets of the left-bank highway-450 million tenge, capital repairs of the Kelintobe-Kandoz road - 500.0 million tenge).
According to the results of 9 months of this year, 13.5 billion tenge was allocated or 100% mastered.
By the end of 2020, the share of roads in good and satisfactory condition is planned to reach 69%.
This year, the National Quality Center conducted inspections of 107 facilities, identified 27 shortcomings. Of these, 19 have been reconstructed. 8 are being repaired.
In 2020, it is planned to put into operation 14 roads of regional significance and 3 bridge crossings.
The regional administration plans to complete the construction of 2 bridges by the end of the year.
They:
Bridge over the Syr Darya River on the Alseit section in Kazalinsky district.
The bridge on the Left Bank of Kyzylorda, built in line with Circelli.
On the work done in the first half of 2020 on the development of the road network
Reference
The length of highways in the territory of Kyzylorda region is 3397 km. Of these, 1,016 km are of national significance, 557 km are of regional significance, and 1,824 km are of district significance (regional aud. the length of roads is 2,381 km).
In 2020, $ 21,346 million will be allocated for the development of the road network. tenge will be allocated (RB 11,794,0 million tenge, CB 9,552. 0 million tenge) It is planned to repair 488 km of roads and streets and 11 bridge crossings . Currently, a public procurement competition is being held for funds allocated for projects. Therefore, the total amount of funds will change in the near future.
Within the framework of the state program of infrastructure development" Nurly Zhol " in 2020, 5,384,708 million US dollars were allocated from the republican and regional budgets for the implementation of 41 projects. tenge was allocated, roads of regional and district significance with a total length of 133.7 km were repaired.
As of July 1 of this year, KZT 6,099. 0 million, 100% disbursed.
By the end of 2020, the share of roads in good and satisfactory condition is planned to reach 69%.
On the work done for the first quarter of the development of the road network in 2020
Reference
The length of highways in the territory of Kyzylorda region is 3397 km. Of these, 1,016 km are of national significance, 557 km are of regional significance, and 1,824 km are of district significance (regional aud. the length of roads is 2,381 km).
In 2020, $ 15,315. 7 million will be allocated for the development of the road network. It is planned to allocate tenge and repair roads and streets with a length of 270 km
1) tenge was allocated from the republican budget - $ 6,419. 97 million.
- 23 projects at 50/50 parity-3,942.2 million tenge;
- Regional Development Program - 1 project-718.5 million tenge;
- "Auyl-el Besigi" program - 44 projects-1,759.3 million tenge (90/10)
Planned:" employment roadmap " - 9,602. 7 million. tg;
2) from the regional budget - 8,895. 79 million tenge.
- At 50/50 parity-1,919.4 million tenge;
- for highways and streets-2,015. 3 million tenge
- for current repairs and maintenance-2,085. 4 million tenge
-"Auyl-el Besigi" program-for 12 projects-70.26 million tenge (from the regional budget of 100 million it is necessary to allocate funds for 32 projects in tenge 10% )
- "Employment Roadmap" - 2,805. 43 million tenge;
In 2020, it is planned to increase the indicator of a good and satisfactory share of roads of regional and district significance to 69%.
This year, it is planned to put into operation 4 bridges.
In particular, the construction of a bridge across the channel of Circuli in Kyzylorda;
2 bridges in Kazalinsky district (construction of a bridge on the Alseit section, reconstruction of a reinforced concrete bridge for 25 km along the Kozhabakhy-Bekarys Bi highway»));
In Zhalagash district (reconstruction of the bridge of the highway"Samara-Shymkent-Madeniyet-Makpakol-Zhanatalap-Akkyr" through the Southern collector).