Information on the work done for the first quarter of 2021

ON WATER MANAGEMENT:
On irrigated land:
In the region, 158 thousand hectares of irrigated land are being restored and 29 thousand hectares of unused land are being put into circulation, with a total cost of 161 billion US dollars. there are 3 (three) projects worth KZT.
(As a reference:
- 15 thousand hectares. According to the PUID-2 project (млрд 9.3 billion). tenge);
- 143 thousand hectares. According to the PUID-3 project (млрд 138.3 billion). tenge);
- 29 thousand hectares. the project for the inclusion of irrigated land in circulation (млрд 13.4 billion).tenge).
The PUID - 2 project includes 15.1 thousand hectares of irrigated land in Akkum, Bukharbay batyr, Tan and Madeniyet rural districts of Zhalagash district. On November 31, 2018, a procurement competition was announced in accordance with international rules of the Ministry of Agriculture of the Republic of Kazakhstan, in April 2019, the consortium "Meliorator" LLP, "Kazakhdorstroy" LLP, "Aksu" LLP, and in April 2019, the consortium "Meliorator" LLP, "Kazakhdorstroy" LLP, and "Aksu" LLP were recognized as winners. The source of funding is the Republican budget - 70%, the World Bank-30%. The total cost of the project is 9.3 billion rubles. tenge.
According to the PUID-2 project, work has begun on the restoration of water systems, and in 2019, 879 million dollars were allocated for the project.in tenge
Of the 1,755 km of water systems, 241 km (13.7%) were cleared, and 481 out of 14,516 water structures (3.3%) were built.
In 2020, 2,226 billion will be allocated for the continuation of the project.tenge was allocated, 1113.3 km (63.4%) of water networks were cleaned, and 2074 units (14.3 %) of water structures were built.
In 2021, 3.4 billion rubles.it is planned to disburse KZT, including 251 million to date.KZT has been disbursed, 1,245.4 km (71%) of water networks have been cleaned, and 3,311 units (22.8 %) of water structures have been built.
The PUID - 3 project includes 143 thousand hectares of land. In 2018-2020, 796 million tenge was allocated from the regional budget to the districts and the city budget (except for the Aral district) for documentation work.the current transfer was allocated in the amount of KZT 148.4 million. documentation work has been completed in Kazalinsky, Karmaksha, Zhalagash, Syrdarya, Shieli, Zhanakorgan districts and the city of Kyzylorda.
However, the Republican state enterprise "Kazvushar" of the Committee on Water Resources of the Ministry of energy of the Republic of Kazakhstan does not give consent for the acceptance of the above-mentioned water bodies into ownership.
In 2017-2018, the regional budget allocated 4 425 million to document water management facilities included in the project for the introduction of 29 thousand hectares of irrigated land into circulation. tenge was allocated, documentation work was completed, and water bodies were transferred to the Republican property.
By order of the committee of Water Resources of the Ministry of Agriculture of the Republic of Kazakhstan, a feasibility study of the project "modernization (modernization) of irrigation systems for irrigated land" was developed. The issue of the project implementation remains unresolved.

Water supply of localities:
To date, 219(372 objects)water management facilities have been purchased in the regional municipal property. Cleaning and repair of water management facilities accepted for municipal ownership is carried out in stages.
This year, funds were allocated for water management works on 6 channels (437.2 million US dollars). tenge).
"In particular: "" Zhappar "" canal in Kyzylorda, "" Sholakaryk "" canal in Akirek rural district of Aral district, "" Pitegen aryk "" canal in Akkyr rural district of Zhalagash district, "" Karak "" and ""Konyrauly ""sections in Komekbayev rural district of Karmaksha district, ""M-2 ""in Kozhamberdy rural district of Zhanakorgan district and ""R-16-3 "" canal in Akkorgan rural district."
At the same time, for the purpose of providing water to settlements, 43 units of pumping equipment were purchased from the regional budget:
"In particular, in Kyzylozek, Karaultobe rural districts of Kyzylorda and "" Baykadam"", Zhappar""," "Yeshpan""," "Altynbay""," "Kyzylzharma" "in Kyzylzharma rural district,""Bozbay" "in Belkol village,""Akirek"", Bekbaul"", Zhanakurylys rural districts of Aral district," "Arandy"", ""Arykbalyk ""rural districts of Kazalinsky district, ""Akzhar "" of Karmaksha District.", Rural districts "komekbayev", rural districts "zhanatalap", "Shamenov", "akkm" of Zhalagash District, Rural districts "Kurymbek" of S. Seifullin Rural District of Syrdarya District», Channels "Kosaryk" in besaryk rural district, "Zhyngyldykol" and "Khozzentrr" in Zhetykol rural district, "Nartai" and "Kermeldy" in Kermeldy rural district of Shieli district, "Baltabay" in Tartogay rural district, "R-3-1"and "R-3-2" in Akmaya rural district, "Aryn" in Talapan rural district, "Levaya vetka" in Lowaryk rural district of Zhanakorgan district, Kozhamberdy "m-2" in Baikenzhinsky Rural District, "Donbay" in Baikenzhinsky Rural District, "July" in Suttykuduk rural district», Pumping units will be purchased for akbastau channels and nature enterprises in ekpindy rural district.

Дата публикации
08 апреля 2021
Дата обновления
08 апреля 2021
Тип
Information

Сейчас читают

Announcement
01 июня 2021
Working project "construction of engineering infrastructure (gravel road, electricity supply, water supply) for individual housing construction in N. Ilyasov rural district, Syrdarya district, Kyzylorda region"
Announcement
26 мая 2021
Project" modernization of the production base with the placement of a concrete mixing unit (BSU) and open warehouses of wetted mineral building materials (sand, crushed stone, sand stone)"
Announcement
25 мая 2021
Working Project "plant for the production of 3000 tons of glass fiber per year in Kyzylorda"

Социальные медиа

Фейзбук

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты