Completed works for the heating season for the III quarter of 2026
Heat supply:
In total, there are 80 social facilities in the district. Of these, there are 36 facilities in the field of education (13 – liquid fuel, 7 – solid fuel, 16 – gas), 17 facilities in the field of healthcare (1 – liquid fuel, 9 – solid fuel, 7 – gas), and 27 facilities in the field of culture and sports (12 – liquid fuel, 3 – solid fuel, 12 – gas).
As of today, by the order of the district akim No. 160 dated June 2, 2026, a district headquarters has been established to organize work in preparation for the 2026-2027 heating season, and relevant measures have been approved and implemented in accordance with the action plan.
These facilities have received certificates of readiness for heat‑generating entities to operate during the autumn‑winter period for 2026–2027.
Completed works for the heating season for the II quarter of 2026
Heat supply:
In total, there are 80 social facilities in the district. Of these, there are 36 facilities in the field of education (13 – liquid fuel, 7 – solid fuel, 16 – gas), 17 facilities in the field of healthcare (1 – liquid fuel, 9 – solid fuel, 7 – gas), and 27 facilities in the field of culture and sports (12 – liquid fuel, 3 – solid fuel, 12 – gas). As of today, by the order of the district akim No. 160 dated June 2, 2026, a district headquarters has been established to organize work in preparation for the 2026-2027 heating season, and relevant measures have been approved and implemented in accordance with the action plan.
Completed works for the heating season for the I quarter of 2026
Heat Supply There are 80 social facilities in the district, categorized as follows: Education: 36 facilities (16 – liquid fuel, 7 – solid fuel, 13 – gas). Healthcare: 17 facilities (1 – liquid fuel, 9 – solid fuel, 7 – gas).Culture and Sports: 27 facilities (13 – liquid fuel, 5 – solid fuel, 10 – gas)By Order No. 84-ө of the District Akim dated April 2, 2026, the heating season was officially declared closed.
Completed works for the heating season for the IV quarter of 2025
Heat Supply: In total, there are 80 social facilities in the district. Of these, in the field of Education – 36 facilities (16 – liquid fuel, 7 – Solid Fuel, 13 –gas), healthcare – 17 facilities (1-liquid fuel, 9-solid fuel, 7 - gas), culture and sports – 27 facilities (13 – liquid fuel, 5 – solid fuel, 10 - gas). By the order of the district Akim No. 257 of October 7, 2025, heating has been provided since October 15 of this year. All 80 social facilities that must receive a readiness passport for the heating season have received a readiness passport.
Completed works for the heating season for the III quarter of 2025
Heat supply: There are a total of 80 social facilities in the district. Of these, 36 are in the education sector (17 are liquid fuel, 7 are solid fuel, and 12 are gas), 17 are in the healthcare sector (1 is liquid fuel, 12 are solid fuel, and 4 are gas), and 27 are in the culture and sports sector (15 are liquid fuel, 5 are solid fuel, and 7 are gas).
In addition, in preparation for the 2025-2026 autumn-winter heating season, the relevant facilities have received their readiness certificates.
Completed works for the heating season for the II quarter of 2025
Heat supply: There are a total of 80 social facilities in the district. Of these, 36 are in the education sector (17 are liquid fuel, 7 are solid fuel, and 12 are gas), 17 are in the healthcare sector (1 is liquid fuel, 12 are solid fuel, and 4 are gas), and 27 are in the culture and sports sector (15 are liquid fuel, 5 are solid fuel, and 7 are gas).
Completed works for the heating season for the I quarter of 2025
terms of heat supply: there are 80 social facilities in the District. Of these, in the field of Education – 36 facilities (17 – liquid fuel, 7 – Solid Fuel, 12 –gas), healthcare – 17 facilities (1-liquid fuel, 12-solid fuel, 4 - gas), culture and sports – 27 facilities (15 – liquid fuel, 5 – solid fuel, 7 - gas).
Completed works for the heating season for the IV quarter of 2024
On heat supply: There are a total of 80 social facilities in the district. Of these, 36 facilities are in the field of education (17 with liquid fuels, 7 with solid fuels, and 12 with gas fuels). Of these, 17 facilities for healthcare facilities (1 for liquid fuel, 12 for solid fuel, 4 for gas), 27 facilities for cultural and sports facilities (15 for liquid fuel, 5 for solid fuel, 7 for gas).
By January 1, 2025, 244.4 million tenge was allocated for the purchase of liquid and solid fuels for social facilities. Of these, 224.3 million tenge was allocated for 796.8 tons of liquid fuel, 20.1 million tenge was allocated for 1,323 tons of solid fuel and contracts with fuel suppliers were concluded.
Completed works for the heating season for the III quarter of 2024
In terms of heat supply: there are a total of 80 social facilities in the district, including: 36 in the field of education (17 liquid fuel facilities, 7 solid fuel facilities, 12 natural gas facilities), 17 in the field of healthcare (1 liquid fuel, 12 solid fuel, 4 natural gas), there are 27 facilities in the field of culture and sports (15 – on liquid fuel, 5 on solid fuel, 7 facilities on natural gas). 244.4 million tenge has been allocated for the purchase of solid and liquid fuels for the current year for all social facilities. In particular, 224.3 million tenge was allocated for the purchase of 796.8 tons of liquid fuel, 20.1 million tenge was allocated for the purchase of 1,323 tons of solid fuel. Contracts with carriers have been concluded for all facilities.
Completed works for the heating season for the II quarter of 2024
In total, there are 80 social facilities in the Syrdarya district. Among them: in the field of Education– 37(20 –liquid fuel, 9-solid fuel, 8-gas), healthcare – 17 (1-liquid fuel, 13-solid fuel, 3 - gas), culture and Sports – 26 facilities (15 – liquid fuel, 4 – solid fuel, 7 - gas). Contracts were concluded with carriers for 2589 tons of solid fuel and 1790.7 tons of liquid fuel needed for social facilities. Transportation of solid fuel to social facilities is carried out in August-September. Also, liquid fuel was supplied depending on the capacity of the warehouse.
Completed works for the heating season for the I quarter of 2024
In terms of heat supply: There are 80 social facilities in the Syrdarya district in total.
Of these: in the field of education – 37 (20 –liquid fuel, 9-solid fuel, 8-gas), healthcare – 17 (1-liquid fuel, 13-solid fuel, 3 - gas), culture and sports – 26 facilities (15-liquid fuel, 4-solid fuel, 7-gas). Contracts have been concluded with carriers for 2,589 tons of solid fuel and 1,790.7 tons of liquid fuel needed for social facilities. Transportation of solid fuel to social facilities is carried out in August-September. Liquid fuel was also supplied depending on the storage capacity.
Memoranda for 15,000 tons of coal needed by the population during the heating season have been signed with the entrepreneurs "Uglesbyt" and "Nurdaulet" engaged in the transportation of coal in the area. In addition, for residents of the district located near the regional center (Aidarly, Zhetykol, Amankeldy, Besaryk, Kogalykol), Kazkom, an individual entrepreneur, signed a memorandum for the transportation of 7,500 tons of coal.
Completed works for the heating season for the IV quarter of 2023
For Heat Supply: in total, there are 80 social facilities in the Syrdarya district. Of these, in the field of Education– 37 (in 20 forms – 83 tons. liquid fuel–in 9 facilities-679 tons. solid fuel reserves, 8 –gas), healthcare - 17 (Object 1– 20 tons.liquid fuel, in 13 facilities - 350 tons. solid fuel reserves, 3 - gas), in the field of culture and Sports – 26 facilities (in 14th place– 247.5 tons. liquid fuel, in 5 forms – 262 tons, solid fuel reserves, 7 - gas).
In the warehouse of UGLESBYT LLP in the village of terenozek
1183 tons of "Shubarkol", 250 tons of" Ekibastuz "("Shubarkol "21 000 tenge) (Ekibastuz 1 ton 14 500 Tenge), the warehouse of the individual entrepreneur" Nurdaulet "has 270 tons of" Shubarkol " coal (1 ton 19 000-22 000 thousand) and the population of the settlement has reserves of 15500 tons of coal.
Social facilities in the district have reserves of 1,291 tons of solid fuel and 350 tons of liquid fuel.
In total, 17,000 tons of coal are needed in the district today
There are 15,500 tons, which is 90 percent.
In addition, the cost of the project for the reconstruction of the boiler room building of the Rehabilitation Department of the Central Hospital of the Syrdarya district is 66.7 million rubles.tenge was allocated, construction and installation works were carried out through the contractor company Gazstroy LLP, which was adopted by the acceptance certificate on December 27, 2023. The cost of the project for re - equipment of steam boilers with gas fuel of the botagoz kindergarten building-29.7 million tenge was allocated, construction and installation works were carried out through the contractor company Gazstroy LLP, and on October 15, 2023 the facility was connected to gas.
Completed works for the heating season for the III quarter of 2023
For Heat Supply: in total, there are 80 social facilities in the Syrdarya district. Including: in the field of Education– 37 (20-fuel, 9-solid fuel, 8-gas),
health care-17 (1-water fuel, 13-solid fuel, 3-gas),
culture and Sports-26 facilities (15 – fuel, 4 - solid fuel, 7-gas).
On January 15, 2024, conclude contracts with carriers for 2589 tons of solid fuel needed for social facilities. Social facilities have a fuel shell of 2330 tons (90%).
On January 15, 2024, contracts were signed for the purchase of 1,790.7 tons of fuel for social facilities. At the moment, social facilities will have a supply of 895.35 tons (50%)of water fuel shell depending on the shield parts.
Memorandum on the creation of 15,000 tons of coal for those who are in heat with entrepreneurs "Karkarbyt " and" Nurdaulet", which are engaged in the transportation of coal in the area.
So, a memorandum was signed for the transportation of 7,500 tons of coal by a private entrepreneur "Kazkom" from the regional center of Qatar district (Aidarlyk, Zhetykolsky, Amankeldy, Besaryk, Kogalykol).
"Ekibastuz "for 250 tons on the basis of" "karkarbyt "" LLP (Ekibastuz 1 ton 14 500 tenge)."
On the basis of the residential complex" nurdaulet"450 tons of coal (1 ton of coal" Shubarkol " -19,000 thousand) are sold for tenge.
In total, there are 700 tons of coal shells in the area of the dam to the sun.
So, the total cost of the project for the reconstruction of the boiler room building of the Rehabilitation Department of the Central Hospital of the Syrdarya District of Qatar is 66.7 million rubles."I don't know," he said, " but I don't know what to do with it, and I don't know what to do with it, but I don't know what to do with it, and I don't know what to do with it." The duration of construction is 2 months.
Completed works for the heating season for the II quarter of 2023
On heat supply: in total, there are 80 social facilities in the Syrdarya district. Of these: in the field of education-37 (20-liquid fuel, 9-solid fuel, 8-gas),
healthcare -17 (1-liquid fuel, 13-solid fuel, 3-gas), in the field of culture and sports – 26 facilities (15 – liquid fuel, 4 – solid fuel, 7 - gas).
Contracts have been concluded with carriers for 2,589 tons of solid fuel and 1,790.7 tons of liquid fuel needed for social facilities.Social facilities have a fuel reserve of 1147.6 tons of solid fuel by 44 percent and 475.5 tons of liquid fuel by 26 percent.
Transportation of solid fuel to social facilities is carried out in August-September. Also, liquid fuel is supplied depending on the capacity of the warehouse.
Memoranda for 15,000 tons of coal needed by the population during the heating season have been signed with the entrepreneurs "Uglesbyt" and "Nurdaulet" engaged in the transportation of coal in the district.
In addition, a memorandum was signed with the individual entrepreneur Kazkom for the transportation of 7,500 tons of coal for residents of the district located near the regional center (Aidarly, Zhetykol, Amankeldy, Besaryk, Kogalykol).
On the basis of Uglesbyt LLP, 200 TONS of Ekibastuz coal, 100 tons of Shubarkol coal. (Shubarkol 1 ton 16 500 tenge, Ekibastuz 1 ton 14 500 tenge). On the basis of IP"Nurdaulet" 100 tons are sold (coal "Shubarkol " 1 ton -19 000 thousand) tenge.
In total, there are 400 tons of coal reserves in the area today.
At the same time, the total cost of the reconstruction project of the boiler room building of the rehabilitation department of the central hospital of the Syrdarya district is $66.7 million.the total cost of the project to re-equip the steam boilers of the kindergarten building "Botagoz" with gas fuel is 29.7 million tenge, as a result of public procurement, Gazstroy Company LLP was determined, these works are planned to be connected to gas in a 2-month period.The issue of heat transfer is under strict control, and appropriate work will be carried out in the future.
Completed works for the heating season for the I quarter of 2023
in total, there are 80 social facilities in the Syrdarya district.
Including:
in the field of Education-37(20-liquid fuel, 9-solid fuel, 8-gas),
health care - 17 (1-liquid fuel, 13-solid fuel, 3-gas),
in the field of culture and Sports – 26 facilities (15 – liquid fuel, 5 – solid fuel, 6 - gas).
For 2022, 537.4 million tenge was allocated for the purchase of liquid and solid fuel for social facilities.
Of these, 481.7 million tenge for 2,047 tons of liquid fuel,
55.7 million tenge was allocated for 2661 tons of solid fuel, 2480 tons or 90% were delivered to warehouses. The remaining parts of the fuel reserve, or 181 tons, will be delivered in accordance with the schedule (schedule) approved by the supplier's contractors.
To date, all steam boilers are in trouble-free operation and are provided with sufficient fuel reserves.
In the district educational, cultural and health institutions, heating in the corridor +17 +19 OS and internal rooms +19 +21 OS is provided normally.
The need for solid fuel for the population in the district is 10.0 thousand tons. During this period, a total of 10,000 tons of coal or 100 percent of the need was supplied to the inhabitants of the settlements.
Completed works for the heating season for the IV quarter of 2022
In total, there are 80 social facilities in the Syrdarya district.
Including:
in the field of education - 37,
in the field of health - 17,
in the field of culture and sports – 26 objects.
In 2022, 537.4 million tenge was allocated for the purchase of liquid and solid fuels for social facilities.
Of these, 481.7 million tenge for 2,047 tons of liquid fuel,
55.7 million tenge has been allocated for 2,550 tons of solid fuel, contracts with carriers have been concluded.
Today in the warehouses of social facilities
1000 tons, i.e. 50 percent of liquid fuel,
There are 1,300 tons, i.e. 50 percent of solid fuel reserves.
The remaining parts will be delivered in agreement with the carriers according to the order.
To date, 10.0 tons of solid fuel have been delivered to residents of the settlements of the district.
Completed works for the heating season for the IІI quarter of 2022
There are 80 social facilities in the Syrdarya district. In the field of education - 37 objects, healthcare-17 objects, culture and sports - 26 objects. In the Syrdarya district, the order of the akim of the district dated October 7, 2021 No. 213 "on the beginning of the heating season 2021-2022" was adopted, heat has been supplied at all facilities in the district since October 10. 493.8 million tenge was allocated and disbursed from the regional and district budgets for the purchase of 2513.7 tons of liquid and 3387.6 tons of solid fuel for social facilities. Social facilities are fully provided with liquid and solid fuel. To date, all steam boilers are working in good condition. In the Syrdarya district, coal carriers signed memoranda with business entities "Uglesbyt", "Nurdaulet" for the supply of 10.0 thousand tons of coal needed for the population of the district at affordable prices. In rural settlements, agricultural producers "Akzharma-2", "Abai - Daulet" and other farms engaged in agriculture supplied coal to residents of settlements at favorable prices. In addition, in the district center, individual entrepreneurs "Nursultan", "Bulat", "Nurgul" supplied coal directly from producers. To date, 10.0 tons of solid fuel have been delivered to the residents of the settlement. To date, there are 130 tons (1tn-17 thousand tenge) of"Shubarkol" on the basis of the partnership"Uglesbyt".
Completed works for the heating season for the II quarter of 2022
There are 80 social facilities in the Syrdarya district. In the field of education - 37 objects, healthcare-17 objects, culture and sports - 26 objects. In the Syrdarya district, the order of the akim of the district dated October 7, 2021 No. 213 "on the beginning of the heating season 2021-2022" was adopted, heat has been supplied at all facilities in the district since October 10. 493.8 million tenge was allocated and disbursed from the regional and district budgets for the purchase of 2513.7 tons of liquid and 3387.6 tons of solid fuel for social facilities. Social facilities are fully provided with liquid and solid fuel. To date, all steam boilers are working in good condition. In the Syrdarya district, coal carriers signed memoranda with business entities "Uglesbyt", "Nurdaulet" for the supply of 10.0 thousand tons of coal needed for the population of the district at affordable prices. In rural settlements, agricultural producers "Akzharma-2", "Abai - Daulet" and other farms engaged in agriculture supplied coal to residents of settlements at favorable prices. In addition, in the district center, individual entrepreneurs "Nursultan", "Bulat", "Nurgul" supplied coal directly from producers. To date, 10.0 tons of solid fuel have been delivered to the residents of the settlement. To date, there are 130 tons (1tn-17 thousand tenge) of"Shubarkol" on the basis of the partnership"Uglesbyt".
Completed works for the heating season for the I quarter of 2022
There are 80 social facilities in the Syrdarya district. In the field of education - 37 objects, healthcare-17 objects, culture and sports - 26 objects. In the Syrdarya district, the order of the akim of the district dated October 7, 2021 No. 213 "on the beginning of the heating season 2021-2022" was adopted, heat has been supplied at all facilities in the district since October 10. 493.8 million tenge was allocated and disbursed from the regional and district budgets for the purchase of 2513.7 tons of liquid and 3387.6 tons of solid fuel for social facilities. Social facilities are fully provided with liquid and solid fuel. To date, all steam boilers are working in good condition. In the Syrdarya district, coal carriers signed memoranda with business entities "Uglesbyt", "Nurdaulet" for the supply of 10.0 thousand tons of coal needed for the population of the district at affordable prices. In rural settlements, agricultural producers "Akzharma-2", "Abai - Daulet" and other farms engaged in agriculture supplied coal to residents of settlements at favorable prices. In addition, in the district center, individual entrepreneurs "Nursultan", "Bulat", "Nurgul" supplied coal directly from producers. To date, 10.0 tons of solid fuel have been delivered to the residents of the settlement. To date, there are 130 tons (1tn-17 thousand tenge) of"Shubarkol" on the basis of the partnership"Uglesbyt".
Completed works for the heating season for the IV quarter of 2021
There are 80 social facilities in the Syrdarya district. Of these: in the field of education–20; kindergartens–17; healthcare–17; culture and sports–26 facilities. 37 facilities are heated with liquid fuel, 34 with solid fuel, 9 with natural gas. 493.8 million tenge was allocated and disbursed from the regional and district budgets for the purchase of 2513.7 tons of liquid and 3387.6 tons of solid fuel for social facilities. 980 tons (54%) of liquid fuel were delivered at social facilities according to the warehouse capacity (100%), 2,572 tons (100%) of solid fuel in full. In the Syrdarya district, coal carriers signed memoranda with business entities "Uglesbyt", "Nurdaulet" for the supply of 10.0 thousand tons of coal needed for the population of the district at affordable prices. In addition, in rural settlements, agricultural lands "Akzharma-2", "Abai - Daulet" and others at favorable prices (15 thousand tenge). In the district center, private enterprises "Nursultan", "Bulat", "Nurgul" supply and supply coal directly from the Karaganda region. Coal "Shubarkol" on the coal base is available for sale at 16.5 thousand tenge per 1 ton.
Completed works for the heating season for the III quarter of 2021
To date, there are 80 social facilities in the Syrdarya district. In the field of education-37; healthcare-17; culture and sports-26 objects. 39 facilities are heated with liquid fuel, 34 with solid fuel, 7 with natural gas. In the district, 444 million tenge was allocated from the regional and district budgets for the purchase of 1,812 tons of liquid and 2,572 tons of solid fuel for social facilities. Currently, 950 tons (52%) of liquid fuel have been unloaded to social facilities in accordance with the warehouse capacity, 1850 tons (71%) of solid fuel have been unloaded to warehouses. The rest of the fuel reserves will be unloaded in accordance with demand. Passports of readiness for the heating season have been received in full in all branches of education, culture, and healthcare. About the beginning of the heating season of 2021-2022 in the district, all institutions, regardless of ownership forms, are provided with heating on October 10, 2021.
Completed works for the heating season for the II quarter of 2021
There are a total of 80 social facilities in the Syrdarya district. Among them: in the field of education– 20; kindergartens-17; healthcare-17; culture and sports-26 objects. Of these, 46 objects are heated with liquid fuel, 34-with solid fuel.
373.6 million tenge was allocated for the purchase of liquid and solid fuel for 57 social facilities. Of these, 1887.5 tons for liquid fuel are 335.5 million tenge, 2550 tons for solid fuel are 38.1 million tenge.
The stocks of solid fuel of social facilities are supplied in full, and liquid fuel is supplied depending on the capacity of the warehouse.
Completed works for the heating season for the I quarter of 2021
There are a total of 80 social facilities in the Syrdarya district. Among them: in the field of education– 20; kindergartens-17; health-17; culture and sports – 26 objects. Of these, 46 facilities are heated with liquid fuel, 34 with solid fuel.
226 million tenge was allocated for the purchase of liquid and solid fuel for 57 social facilities. Of these, 792.4 tons for liquid fuel 180.8 million tenge, 2693 tons for solid fuel 45.2 million tenge.
Solid fuel stocks of social facilities are supplied in full, and liquid fuel is supplied depending on the storage capacity.
To date, all steam boilers are working properly and are provided with sufficient fuel reserves.
The constant supply of heat to all social and cultural objects is under the constant control of the akimat of the district, in the offices of the akims of settlements and rural districts during the heating season, duty is organized.
In the heating season of 2020-2021, no one had any emergencies. On April 15, 2012, the heating season will be completed and preparations for the 2021-2022 heating season will be organized.
Completed works for the heating season for the IV quarter of 2020
There are 80 social facilities in the Syrdarya district. Among them: in the field of education-20; kindergartens-17; health-17; culture and sports-26 objects.
46 objects are heated with liquid fuel, 34-with solid fuel.
226 million tenge was allocated for the purchase of liquid and solid fuel for 57 social facilities. Of these, 792.4 tons for liquid fuel 180.8 million tenge, 2693 tons for solid fuel 45.2 million tenge.
Solid fuel stocks of social facilities are supplied in full, and liquid fuel is supplied depending on the capacity of the warehouse.
To date, all steam boilers are working properly and provided with sufficient fuel reserves.
The constant supply of heat to all social and cultural objects is under the constant control of the district akimat, and the offices of the akims of settlements and rural districts are on duty during the heating season.
There are 80 social facilities in the Syrdarya region. Of these, 20 are in education, 17 are in kindergartens, 17 are in healthcare, and 26 Are in culture and sports.
For 1593 tons of liquid fuel 296 million 177 thousand tenge;
For 2603 tons of solid fuel-46 million 676 thousand tenge.
Today we are provided with fuel reserves.
Constant heat supply to all social facilities is under the control of the Department, special attention is paid to the akims of localities and rural districts.