Work done in the III quarter of 2026

On electricity supply:

1) "Electricity supply to the settlement of Kalzhan Akhun,Syrdaryadistrict,Kyzylordaregion" the projectcostis485.9milliontenge. The contractvalueis474.5milliontenge.Ofthese, the contractororganization-456.3milliontenge, the author's supervision-4.6milliontenge,technicalsupervision-13.5milliontenge.

In2024, within the frameworkoftheAuyl-ElBesigi program, 57.3milliontenge was allocatedfrom the republicanbudget for thestart of constructionwork, 279.9 million tenge wasallocatedfrom the republicanbudgetfor2025, and the remainingamountwasallocated137.3milliontengefor2026.

Constructionworkbegan on 04/15/2024.Accordingto the project, 23.8km of electricalnetworks,4pcs of KTPBand1pc of KRUN,532pcs of electricpolesand153pcs of streetlamps are fullyinstalledon the streets.Thefacility is currentlybeingaccepted.

(For reference: Contractor: JSC "KRAK", technical supervision - LLP "Aktaustroyexpert", author's supervision – LLP "Start-Project").

2) "Electricity supply to the settlement of S. Seifullina" the projectcostis617.9milliontenge. The contractvalueis598.6milliontenge.For2026, funds wereallocatedforconstructionwork at theexpense of loansfrominternalsources of the regionalbudget,according to the results of publicprocurement, the contractorNuraiAkzholLLP was identified as the winner.Constructionworkbegan on 07/31/2026. The constructionperiodis5months.

Theprojectprovides for 1032electricpoles.Currently, 780electricpolesand26traverses have been installed.Thatis, electricpoles are installedon9streets out of10streets.

(For reference: Contractor agency: «Nurai Akzhol» LLP, technical supervision – «Muztau» LLP, author's supervision – «Kyzylorda Water Gas Project» LLP).

For public services:

The department provides 5 public services. In January-September 2026, 302 services were provided. Including

31 services were provided through the public service center. 271 were shown through the e-government web portal.

As for the development of architectural and planning tasks: in January-September, 132 architectural and planning tasks were developed in the Department. Of these, 0 are state institutions, 26 are oil companies, 106 are individual entrepreneurs and legal entities.

According to the Information System" address register":

Through the web portal of" e-government "in January - September, 73 certificates" assignment/cancellation of the address of a real estate object " were issued.

On issuing permits for reconstruction works:

In January - September, the department issued a permit for reconstruction of 1 object. All from an individual entrepreneur.

On approval of the draft project:

In January - September, 66 sketch projects were approved.

On issuing permits for the installation of outdoor (visual) advertising objects:

In January-September, the Kyzylorda branch of the microfinance organization LLC "KMF" (KMF) along A. Aliakbarov Street, Terenozek village, was allowed to place an outdoor (visual) advertising object (banner) in the district.

For work on registration of the act of acceptance into operation:

In January - September, 31 acts on the commissioning of non-residential premises were registered.

For individual residential buildings commissioned in the district:          

To date, according to the results of January - September, there are 20618.2 square meters of individual housing commissioned. Compared to last year, it was fulfilled by 100.3%.


In the field of construction, architecture and urban planning
Work done in the II quarter of 2026

          The department provides 5 public services. For January- June 2026, 125 services were provided. Of these, 0 services were provided through the public service center. 115 were provided through the e-government web portal.

          On the development of an architectural and planning assignment:

For January- June, the department developed 84 architectural and planning assignments. Of these, there are 11 government agencies, 36 oil companies, and 37 individual entrepreneurs and legal entities.

According to the Address Register information system:

Through the e-government web portal, 10 certificates were issued in January- June for the assignment/annulment of a property address.

Regarding the issuance of permits for reconstruction work:

In January- June, a permit was issued for the reconstruction of 1 property. All of them were issued by an individual entrepreneur.

Regarding the approval of a preliminary design:

In January- June, 31 draft projects were approved.

Regarding the permission to install outdoor (visual) advertising objects:

In January- June, a permission to place an outdoor (visual) advertising object (banner) was issued in the Terenozek district, on A. Aliakbarov Street, in the Kyzylorda branch of the KMF microfinance organization (KMF) limited liability partnership.

Regarding the registration of the acceptance certificate:

         In January- June, 33 non-residential premises were put into operation.

According to the individual residential buildings put into operation in the district:

 As of today, the total area of individual residential buildings put into operation in January-March is 10529,8 square meters, which is 103.1% more than last year.


In the field of construction, architecture and urban planning
Work done in the I quarter of 2026

           Budget applications were submitted to the relevant departments for 6 projects.

           1) The project "Electricity supply to the settlement of S.Seifullina". The total estimated cost is 617 949.0 thousand tenge. An application was submitted to the regional Department of Construction, Architecture and Urban Planning by letter dated January 28, 2026  №06-2/204 for financing from the republican and regional budgets for 2026. The amount of necessary funds is 612 060.00 thousand tenge. Currently, 10.0 thousand tenge has been allocated from the local budget, and a competition has been held. The winners have already been determined.

          2) The project "Electricity supply to the settlement of A. Tokmaganbetov". The total estimated cost is 431 825.0 thousand tenge. An application was submitted to the regional Department of Construction, Architecture and Urban Planning by letter dated January 28, 2026 №06-2/204 for financing from the republican and regional budgets for 2026. The amount of necessary funds is 428 015.5 thousand tenge.

          3) The project "Power supply of engineering and communication infrastructure of the village of Terenozek". The total estimated cost is 3 726 882.0 thousand tenge. An application was submitted to the regional Department of Construction, Architecture and Urban Planning by letter dated January 28, 2026 №06-2/204 for financing from the republican and regional budgets for 2026. The amount of necessary funds is 3 721 262.9 thousand tenge.

          4) The project of Infrastructure (gas supply) of a new microdistrict in the village of Terenozek (100 ha). The total estimated cost is 578 007,503 thousand tenge. An application was submitted to the regional Department of Construction, Architecture and Urban Planning by letter dated January 28, 2026 №06-2/204 for financing from the republican and regional budgets for 2026. The amount of necessary funds is 565 098, 490 thousand tenge.

          5) The project "Reconstruction of electric networks in the village of Nagi Ilyasov, Syrdarya region, Kyzylorda region". The total estimated cost is 606 411,612 thousand tenge. An application was submitted to the regional Department of Construction, Architecture and Urban Planning by letter dated January 28, 2026 №06-2/204 for financing from the republican and regional budgets for 2026. The amount of necessary funds is 602 987.485 thousand tenge.

          6) The project "Construction of an incoming gas pipeline and intra-block gas distribution networks to the village of Besaryk". The total estimated cost is 1 017 854.0 thousand tenge. An application was submitted to the regional Department of Construction, Architecture and Urban Planning by letter dated January 28, 2026 №06-2/204 for financing from the republican and regional budgets for 2026. The amount of necessary funds is 972 356.0 thousand tenge.

On the public service:

   The department provides 5 public services. For January-March 2026, 69 services were provided. Of these, 0 services were provided through the public service center. 59 were provided through the e-government web portal.

 On the development of an architectural and planning assignment:

For January-March, the department developed 27 architectural and planning assignments. Of these, there are 0 government agencies, 7 oil companies, and  20 individual entrepreneurs and legal entities.

According to the Address Register information system:

Through the e-government web portal, 10 certificates were issued in January-March for the assignment/annulment of a property address.

Regarding the issuance of permits for reconstruction work:

In January-March, a permit was issued for the reconstruction of 1 property. All of them were issued by an individual entrepreneur.

Regarding the approval of a preliminary design:

In January-March, 19 draft projects were approved.

Regarding the permission to install outdoor (visual) advertising objects:

In January-March, a permission to place an outdoor (visual) advertising object (banner) was issued in the Terenozek district, on A. Aliakbarov Street, in the Kyzylorda branch of the KMF microfinance organization (KMF) limited liability partnership.

Regarding the registration of the acceptance certificate:

         In January-March, 29 non-residential premises were put into operation.

According to the individual residential buildings put into operation in the district:

 As of today, the total area of individual residential buildings put into operation in January-March is 4,967.1 square meters, which is 103.5% more than last year.


In the field of construction, architecture and urban planning
Work done in the IV quarter of 2025

For 2 projects with a total cost of 672.4 million tenge, 424.1 million tenge has been allocated from all budget sources for 2025 and appropriate work has been carried out.

        Exactly:

        1) Under the project "Electricity supply to the settlement of Kalzhan Akhun in the Syrdarya region of the Kyzylorda region" worth 485.9 million tenge.

Within the framework of the Auyl-El Besigi program, 57.3 million tenge was allocated and disbursed from the National Fund for the performance of work in 2024, and 279.9 million tenge was allocated and fully disbursed from the National Fund for the continuation of construction work in 2025. As part of the allocated financial resources, 372 electric poles, 10.4 km of electrical networks and 3 KTPS were installed in accordance with the project.

        Construction and installation work is carried out by the contractor JSC "Kyzylorda Electric Distribution Company", technical supervision - LLP "Aktaustroyexpert", author's supervision - LLP "Start Project".

        Construction works are scheduled for 2026.

        2) According to the project "construction of engineering infrastructure for residential housing in the village of

  1. Ilyasov, Syrdarya district, Kyzylorda region. Electricity supply, water supply" at a cost of 186.5 million tenge. -144.2 million tenge has been allocated and disbursed from the regional budget for the start of construction work in 2025.

        As part of the funds allocated in accordance with the project: for the construction of the electric grid: 91 pcs. electric poles, 3 pcs. KTPN were installed. Through the drinking water line: a water supply of Ø110 - 1819 meters, Ø63-495 meters was carried out, 18 water intake wells were installed.

         Construction and installation work is carried out by the contractor "Bak-Bereke 2023" LLP, technical supervision - "Expertise" LLP, author's supervision - PT "Meken and Company". Construction works are scheduled for 2026.

According to the public service provided through the department in 2025:

In January - december 2025, 532 services were provided. Of these, 0 services were provided through the public service center. 532 were shown through the e-government web portal.

Work on the development of an architectural and planning task:

In January- december, 202 architectural and planning tasks were developed for the Department. Of these, 15 are from state institutions, 90 are from oil companies, 97 are from individual entrepreneurs and legal entities.

According to the Information System" address register":

Through the public service center in January - december, a certificate was issued to clarify the address 12.

On issuing permits for reconstruction works:

According to the Department, 21 objects were allowed to be reconstructed. All from an individual entrepreneur.

On approval of the draft project:

In January - december, 138 sketch projects were approved.

On issuing permits for the installation of outdoor (visual) advertising objects:

In January- June, the Kyzylorda branch of the microfinance organization "KMF" (KMF) on Terenozek village, Aliakbarov Street in the district, Seif-Lombard LLP No. 47 on Terenozek village, Imanov Street was allowed to place an external (visual) advertising object (banner).

For work on registration of the act of acceptance into operation:

In January - June, 159 acts on the commissioning of non-residential premises were registered.

For individual residential buildings commissioned in the district:

To date, according to the results of January - May of this year, 27 698,2 4 square meters of individual housing have been commissioned. Compared to the corresponding period of the previous year, 101.4% were executed.

For illegally built business facilities in the district:

On the part of the Department, monitoring work was carried out with specialists of the department to identify illegal business buildings in the district. As a result of the monitoring, 13 illegal business objects were identified in the villages of Terenozek, Aidarlyk, Amankeldy, Besaryk, Kogalykol, Shcheyli.

In particular: Terenozek Village, store building on K. Bodeev Street, Terenozek Village, store building on D. Kunaev street, Kogalykol Village, car wash building on Y. Altynsarin street, store building on Kulymbetov Street in Shkineili village, Besaryk Village, car wash building on T. Belgibayev Street, Amankeldi Village, car wash building on T. Tyshkanbayev street, antenna mast construction for 5 mobile communication networks in the village of Terenozek.


In the field of construction, architecture and urban planning
Work done in the III quarter of 2025

In the field of construction, architecture and urban planning, Work carried out in the third quarter of 2025 On the working project "electricity supply to the settlement of Kalzhan Akhun in the Syrdarya region of the Kyzylorda region"

 In 2025, 279,999.0 thousand tenge was allocated from the national budget from the National Fund of the Republic of Kazakhstan for the project "Electricity supply to the settlement of Kalzhan Akhun, Syrdarya district, Kyzylorda region". As part of the allocated funds, 142 pcs of single-column electric poles and 32 pcs of single-column electric poles with one support, 1 pc of single-column electric poles with two supports were installed. The ground has been leveled and 3 pieces of concrete blocks have been laid.

According to the results of the 3rd quarter of 2025, for public services rendered through the Department:

In July-September 2025, 159 services were provided. Of these, 145 services were provided through the public service center. 14 were shown through the e-government web portal.

Work on the development of an architectural and planning task:

In July-September, 67 architectural and planning tasks were developed for the Department. Of these, 21 are state institutions, 13 are oil companies, 11 are individual entrepreneurs and legal entities.

According to the Information System" address register":

Through the public service center in July-September, a certificate was issued to clarify the address 1.

On issuing permits for reconstruction works:

According to the Department, 13 objects were allowed to be reconstructed. All from an individual entrepreneur.

On approval of the draft project:

In July-September, consent was given to 47 sketch projects.

On issuing permits for the installation of outdoor (visual) advertising objects:

In July-September in the district along the village of Terenozek, A. Aliakbarov Street to the Kyzylorda branch of the microfinance organization limited liability company "KMF" (KMF), in the village of Terenozek, A. Imanov Street No. 47 "Seif-Lombard" LLP, "Lombard money population" LLP, doner IP "Ahmad", the store "all for 500 Tenge", the wooden market "Aisha", the store "Bereke, the Food Store" damesh Apa "was allowed to place an external (visual) advertising object (banner).

For work on registration of the act of acceptance into operation:

In July-September, 31 acts on the commissioning of non-residential premises were registered.

For individual residential buildings commissioned in the district:

To date, according to the results of July-September of this year, 20,537.3 square meters of individual housing have been commissioned. Compared to the corresponding period of the previous year, 101.2% were executed.

For illegally built business facilities in the district:

On the part of the Department, monitoring work was carried out with specialists of the department to identify illegal business buildings in the district. As a result of the monitoring, 13 illegal business objects were identified in the village of Terenozek, Aidarlyk, Amankeldy, Besaryk, Kogalykol, Shirkeili.

In particular: Terenozek Village, store building on K. Bodeev Street, Terenozek Village, store building on D. Kunaev street, Kogalykol Village, car wash building on Y. Altynsarin street, store building on Kulymbetov Street in Shirkeili village, Besaryk Village, car wash building on T. Belgibayev street, Amankeldi Village, car wash building on T. Tyshkanbayev street, antenna mast construction for 5 mobile communication networks in the village of Terenozek.


In the field of construction, architecture and urban planning
Work done in the II quarter of 2025

According to the results of the 2nd quarter of 2025, for public services rendered through the Department:

In January - June 2025, 187 services were provided. Of these, 116 services were provided through the public service center. 71 were shown through the e-government web portal.

Work on the development of an architectural and planning task:

In January-May, 112 architectural and planning tasks were developed for the Department. Of these, 11 are from state institutions, 80 are from oil companies, 9 are from individual entrepreneurs and legal entities.

According to the Information System" address register":

Through the public service center in January - May, a certificate was issued to clarify the address 7.

On issuing permits for reconstruction works:

According to the Department, 8 objects were allowed to be reconstructed. All from an individual entrepreneur.

On approval of the draft project:

In January - June, 73 sketch projects were approved.

On issuing permits for the installation of outdoor (visual) advertising objects:

In January- June, the Kyzylorda branch of the microfinance organization "KMF" (KMF) on Terenozek village, Aliakbarov Street in the district, Seif-Lombard LLP No. 47 on Terenozek village, Imanov Street was allowed to place an external (visual) advertising object (banner).

For work on registration of the act of acceptance into operation:

In January - June, 24 acts on the commissioning of non-residential premises were registered.

For individual residential buildings commissioned in the district:

To date, according to the results of January - May of this year, 10,224.4 square meters of individual housing have been commissioned. Compared to the corresponding period of the previous year, 107.2% were executed.

For illegally built business facilities in the district:

On the part of the Department, monitoring work was carried out with specialists of the department to identify illegal business buildings in the district. As a result of the monitoring, 13 illegal business objects were identified in the villages of Terenozek, Aidarlyk, Amankeldy, Besaryk, Kogalykol, Shcheyli.

In particular: Terenozek Village, store building on K. Bodeev Street, Terenozek Village, store building on D. Kunaev street, Kogalykol Village, car wash building on Y. Altynsarin street, store building on Kulymbetov Street in Shkineili village, Besaryk Village, car wash building on T. Belgibayev Street, Amankeldi Village, car wash building on T. Tyshkanbayev street, antenna mast construction for 5 mobile communication networks in the village of Terenozek.


In the field of construction, architecture and urban planning
Work done in the I quarter of 2025

According to the working project" power supply of Kalzhan Akhun settlement of Syrdarya District of Kyzylorda region". Total cost 490.5 million. for the implementation of the working project "power supply of Kalzhan Akhun settlement of Syrdarya District of Kyzylorda region" in the amount of KZT 57.3 million from the Republican budget in 2024. tenge was allocated, 119 units of single-column electric poles and 26 units of single–column with one support, 4 units of single-column with two supports and 2.3 km of power lines VL-10/0,4 KV were installed. 280.0 million from the Republican budget for 2025. tenge was allocated, 142 units of single-column power poles and 32 units of single-column with one support, 1 unit of single-column with two supports were installed. The ground was leveled and 3 pieces of KTPN with concrete blocks were laid. Power supply of engineering and communication infrastructure of the village of terenozek The cost of projects is 3.7 billion rubles.an application was submitted to the Regional Department of construction, architecture and urban planning for the financing of construction works for 2025 of the working project "power supply of engineering and communication infrastructure of Terenozek village of Syrdarya District of Kyzylorda region" in the amount of tenge. Power supply of S. Seifullin settlement Through the municipal state institution" Department of public procurement of Kyzylorda region", the project cost 617.9 million rubles.as a result of the protocol results of public procurement work on "electricity supply to the settlement of S. Seifullin, Syrdarya district" in the amount of tenge, contracts were concluded with the winning institutions. A budget application was submitted to the Regional Department of construction, architecture and urban planning to finance construction work for 2025. Power supply of A. Tokmaganbetov settlement The project cost 431.8 million.as a result of the protocol results of public procurement work on the project "electricity supply to the settlement of A. Tokmaganbetov, Syrdarya district" in the amount of tenge, contracts were concluded with the winning institutions. A budget application for financing construction works for 2025 was submitted to the Regional Department of construction, architecture and Urban Planning from the Republican and regional budgets. Construction of engineering and communication infrastructure for individual residential buildings in N. Ilyasov rural district The project cost млн 186.5 million.as a result of the protocol results of public procurement work on the project "construction of engineering and communication infrastructure for private residential buildings (electricity supply, water system) in N. Ilyasov rural district, Syrdarya district, in the amount of tenge, contracts were concluded with the winning institutions. A budget application for financing construction works for 2025 was submitted to the Regional Department of construction, architecture and Urban Planning from the Republican and regional budgets. The project of infrastructure (gas supply) (100 hectares) of a new microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region. The total estimated cost is 578,007,503 thousand.tenge. An application for financing from the Republican and regional budgets for 2025 was submitted to the Regional Department of construction, architecture and urban planning by letter No. 06-2/278 dated 31.01.2025. The required amount of funds is 565,098,490 thousand tenge. The project" purchase of 50 housing units of the communal housing fund for socially vulnerable segments of the population and (or) low-income large families of the Syrdarya District of Kyzylorda region". An application for financing from the Republican budget for 2025 in the amount of 1,500,000.0 thousand tenge for the work "purchase of 50 2-apartment residential buildings of the communal housing fund for socially vulnerable segments of the population and (or) low-income large families of the Syrdarya District of Kyzylorda region" was submitted to the Regional Department of construction, architecture and urban planning No. 06-2/245 dated 29.01.2025. For public services: The department provides 5 public services. In January-March 2025, 120 services were provided. Of these, 117 services were provided through the public service center. 3 services were provided through the e-government web portal. Work on the development of an architectural and planning task: In January-March, 46 architectural and planning tasks were developed for the Department. Of these, 11 are state institutions, 9 are oil companies, 7 are individual entrepreneurs and legal entities. According to the Information System" address register": Through the Public Service Center, a certificate was issued to clarify 3 addresses in January-March. On issuing permits for reconstruction works: In January-March, the department issued permits for reconstruction of 8 objects. On approval of the draft project: In January - March, 32 sketch projects were approved. On issuing permits for the installation of outdoor (visual) advertising objects: In January-March, permission was granted to place an external (visual) advertising object (banner) in the district along Terenozek village, Aliakbarov Street, Kyzylorda branch of the microfinance organization "KMF" (KMF), Terenozek village, Imanov street №94a, Syrdarya District branch of Technodom Operator, TERENOZEK village, Imanov Street №47 "Seif-Lombard" LLP. For work on registration of the act of acceptance into operation: In January - March, 31 acts on the commissioning of non-residential premises were registered. For individual residential buildings commissioned in the district: To date, according to the results of January - March, there are 4792.0 square meters of individual housing commissioned. Compared to last year, 109.2 percent were executed.


In the field of construction, architecture and urban planning
Work done in the IV quarter of 2024

The District Department of Construction, Architecture and Urban Planning reports the following on the work done in the fourth quarter of 2024.

For the development of mass sports:

The cost of the project is 389.2 million tenge. The cost of the contract for the construction of a sports complex in the village of Bessaryk in tenge is 362.5 million tenge. Due to the transfer from the regional budget, in accordance with the acts of completed works for 2022-2023, 285.0 million tenge has already been allocated. 77.3 million dollars have been allocated for the completion of construction works in 2024. As of October 1 of this year, 63.1 million tenge has been allocated. To date, construction work has been completed, and work is underway on the acceptance of the facility. It is planned to be put into operation this year for the benefit of the country.

To provide clean drinking water:

Within the framework of the program "Strong regions - a driver of the country's development", the cost of which is 307.8 million tenge, 2 projects are underway, i.e. "Construction of drinking water pipes and observation wells along 10 streets of the village of Terenozek" amounts to 283.7 million tenge. In 2023, 177.6 million tenge was allocated, and the relevant construction work was carried out by the Zhanart LLP contractor. The contracting institution of Zhanart LLP has installed 4.8 km of drinking water pipes, 61 pieces of water intake wells. 108.4 million tenge has been allocated from the republican and regional budgets for the completion of construction works in 2024 and fully utilized. Construction work was completed in August 2024 and put into operation.

"Construction of a water pipeline and observation wells along the streets of Muratbayev, A.Imanov and A.Imanov lane in the village of Shagan, Syrdarya district, Kyzylorda region"

The estimated cost of the project is 178 993,829 thousand tenge. 124,562.0 thousand tenge has been allocated from the regional budget and the National Fund for 2023. The construction period of the facility is 2023-2024. Start of construction works on 08/03/2023. The contractor that carried out the construction and installation work was Altyn Aidarly LLP. The funds allocated for 2023 have been fully disbursed. In 2024, the allocated funds of the Republic of Belarus for the completion of construction works amounted to 50.0 million tenge, and were fully utilized. 54 water supply inspection wells were installed. There is a hydrant of 20 pcs. Water pipes Ø200 - 3648 meters, Ø160 - 183 meters, Ø63 - 90 meters, Ø40 - 495 meters, Ø25 - 2100 meters were installed.To date, the construction work has been fully completed and put into operation on 17.07.2024.

"Power supply of Kalzhan Akhun settlement, Syrdarya district, Kyzylorda region"

The project cost is 485.9 million tenge. The contract value of the project "Electricity supply to the settlement of Kalzhan Akhun, Syrdarya district, Kyzylorda region" is 474.5 million tenge. Within the framework of the Auyl-El Besigi program, 57.3 million tenge was allocated from the republican budget for the start of construction work in 2024. As of September 2024, it has been mastered by 100%. The rest - 417.2 million tenge is expected. (Completed works: 0.4 kV – 182 support, 10 kV – 15 support, 0.4 kV -3.0 km cable lines) Currently, the construction work within the framework of the allocated funds by the contractor JSC "KRAK" has been fully completed.

"Construction of a water pipeline and observation wells along the streets of Zh.Kulymbetov, A.Agaidarov, A.Zhankina in the village of Amangeldi, Syrdarya district, Kyzylorda region"

The project cost is 80.5 million tenge. The cost of the construction contract is -73.2 million tenge. 59.5 million tenge was allocated from the republican budget for the start of construction work in 2024, 7331.0 thousand tenge was allocated from the district budget. In accordance with the plan, the allocated funds have been fully utilized, and a 1,971-meter water pipe has been built.

The cost of the project is 3.7 billion tenge. An application has been submitted to the regional department of Energy and Housing and Communal Services for financing construction work for 2025 on the working project "Electricity supply to the engineering and communication infrastructure of the village of Terenozek in the Syrdarya district of the Kyzylorda region."

The cost of the projects, which amount to -1.1 billion tenge, has been applied to the relevant departments for financing construction work for 2025 on the working projects "Electricity supply to the settlement of Saken Seifullin in the Syrdarya district of the Kyzylorda region" and "Electricity supply to the settlement of Askar Tokmagambetov in the Syrdarya district of the Kyzylorda region". In addition, public procurement of construction and installation works of these projects was carried out, as a result of which an agreement was concluded with the winning contractors.

The cost of the project is 186.5 million tenge. As a result of the protocol results of public procurement work, an agreement was concluded with the winning institutions for the project "Construction of engineering infrastructure for residential housing in the village of N.Ilyasov in the Syrdarya district of the Kyzylorda region (Electricity, water supply)".

 For 2025, a budget application has been submitted to the relevant departments for construction work for financing from the republican and regional budgets.

 

For the construction of a solid waste landfill:

Construction of a landfillin the village of Terenozek, Syrdaryadistrict, the totalcost of the projectis495.2milliontenge. The cost of theconstructioncontractis464.9milliontenge.

475.5 million tenge has been allocated from the regional budget for 2024, and the allocated funds have been fully utilized. To date, the contractor "Tehosnastka-Remservice" LLP has fully completed construction work and was commissioned on 11/20/2024.


In the field of construction, architecture and urban planning
Work done in the III quarter of 2024

The District Department of construction, architecture and urban planning informs the following about the work done in the III quarter of 2024. On the development of mass sports: The project cost is млн 389.2 million. the cost of the contract for the construction of a sports complex in Besaryk settlement in the amount of KZT 362.5 million.tenge. According to the acts of work carried out in 2022-2023 at the expense of the transfer of the regional budget, 285.0 million tenge was allocated. the tenge was disbursed. 77.3 million to complete construction works by 2024.KZT 63.1 million was allocated on October 1 of this year.the tenge has been disbursed. "I don't know," he said. It is planned to be completed by the end of the year and put into operation for the benefit of the country.

On providing clean drinking water:

 1) the cost of projects within the framework of the program" strong regions - drivers of the country's development " amounted to 307.8 million rubles.the cost of contracts for 2 projects in the amount of tenge, namely "construction of drinking water pipes and viewing wells along 10 streets of the village of Terenozek" - 283.7 million tenge.tenge.

177.6 million in 2023.the funds were allocated in tenge, and the corresponding construction work was carried out with the contractor "Zhanatau" LLP. A total of 4.8 km of drinking water pipes, 61 units of water viewing wells were installed by the contractor "Zhanatau" LLP.

For 2024, 108.4 million tenge was allocated from the Republican and regional budgets for the completion of construction work.the tenge was allocated and fully disbursed. On August 23 of this year, construction work was completed and work is underway to accept the facility.

The estimated cost of the project" construction of water supply and viewing wells along G. Muratbayev, A. Imanov and A. Imanov lane streets in Chagan village of Syrdarya District of Kyzylorda region " is 178,993.829 thousand tenge. For 2023, 124,562.0 thousand tenge was allocated from the regional budget and the National Fund. The commissioning period of the facility is transitional to 2024. Construction work has been carried out since 03.08.2023. The contractor carrying out construction and installation works is Altyn Aidarli LLP. The work planned for 2023 will be completed on 1.12.2023. The funds allocated for 2023 have been fully disbursed. 54 pieces of water supply viewing wells were installed. 20 pieces of hydrants are located. Water pipes Ø200 - 3648 meters, Ø160 - 183 meters, Ø63 - 90 meters, Ø40 - 495 meters, Ø25 - 2100 meters were placed. RB-50.0 million for the completion of construction work by 2024. the funds were allocated in the amount of KZT 41.8 million as of July 1 of this year.the tenge has been disbursed. To date, the construction work has been fully completed and commissioned on July 17 of this year.

The cost of the project" construction of power supply to Kalzhan Akhun settlement of Syrdarya District of Kyzylorda region " is 485.9 million rubles.the cost of the contract for the project "electricity supply of Kalzhan Akhun settlement, Syrdarya district, Kyzylorda region" in the amount of KZT 474.5 million.tenge. For 2024, within the framework of the Auyl-El besigi program, 57.3 million tenge was allocated from the Republican budget for the start of construction work.KZT 57.3 million was allocated for September 1 of this year.the tenge was fully disbursed by 100%. The remaining-417.2 million."I'm sorry," I said. A notification was received from the regional control department on 15.04.2024 to start construction work. (Completed works: 0.4 KV - 182 columns, 10kV - 15 columns, 0.4 KV cable lines -3.0 km) currently, construction work has been fully mastered within the framework of the funding allocated by the contractor JSC "Krak". (For reference: contractor: JSC "Kyzylorda electric distribution network company", Technical Assistant - LLP "Aktaustroyexpert", author's supervisor - LLP "Start Project").

The cost of the project" construction of water supply and viewing platforms along zh.Kulymbetov, A. Azhagdarov, A. Zhankina streets in the village of Amangeldy, Syrdarya district, Kyzylorda region " - 80.5 million rubles.the cost of the contract for the construction of drinking water pipes and viewing wells along zh.Kulymbetov, A. Akaydarov, A. Zhankin streets in the settlement of Amankeldy in the amount of KZT -73.2 million.tenge. 59.5 million from the Republican budget for the start of construction work in 2024.the funds were allocated in the amount of KZT 36.1 million as of July 1 of this year.the tenge has been disbursed. The remaining funds are 13.7 million."I'm sorry," I said. The length of the drinking water pipeline is 1971 meters. To date, construction work is underway with the contractor "SK Orda-Kurylys" LLP. (For reference: contractor: SK Orda-Kurylys LLP, Technical Assistant - Stroysiti LTD LLP, author's supervisor - PSK Qabylet LLP).

The cost of projects is 3.7 billion rubles.an application was submitted to the Regional Department of energy and housing and communal services for financing construction works for 2025 of the working project "power supply of engineering and communication infrastructure of Terenozek village of Syrdarya District of Kyzylorda region" in the amount of tenge. The cost of projects is млрд 1.1 billion.applications were submitted to the relevant departments for financing construction works for 2025 of the working projects "electricity supply to the settlement of Saken Seifullin of the Syrdarya District of the Kyzylorda region" and "electricity supply to the settlement of Askar Tokmagambetov of the Syrdarya District of the Kyzylorda region" in the amount of tenge. In addition, public procurement was carried out for the construction and installation works of these projects, as a result of which contracts were concluded with the winning contractors. (For reference: for the settlement of S. Seifullin: project cost - 617.9 million.tenge, contractor: "Nuray-Akzhol RG" LLP, technical supervisor:" Muztau "LLP; author's supervisor:" Kyzylordavodgazproekt " LLP. For the settlement of A. Tokmaganbetov: the cost of the project is 431.8 million rubles.tenge, contractor: IP "Koshekov", technical supervisor:" Expertizochka "LLP; author's supervisor:" Start Project " LLP.)

The project cost 186.5 million.as a result of the protocol results of public procurement work on the construction of engineering and communication infrastructure (electricity supply, water system) at the heating station in N. Ilyasov rural district, Syrdarya district, in the amount of tenge, contracts were concluded with the winning institutions. A budget application for financing construction works from the Republican and regional budgets for 2025 was submitted to the relevant departments. (For reference: contractor: "Bakhyt-Bereke 2030" LLP, Technical Assistant- "Expertizochka" LLP, author's supervision - Economic Partnership "Meken and company" full partnership.) Construction of a solid waste landfill: The total cost of the project is млн 495.2 million."construction of a solid waste landfill in the village of Terenozek, Syrdarya district. The cost of the contract for the construction of" Correction " - 464.9 million.tenge. At the expense of the regional budget for 2024 - 475.5 million rubles. 133.9 million tenge was allocated and a 30% prepayment was made.the tenge was transferred. To date, the contractor "Tekhosnastka-Remservis" LLP is working on land correction, map digging, concrete filling of the sorting complex. Construction work is planned to be completed and put into operation in September. (For reference: contractor: TEHOSNASTKA-REMSERVIS LLP, Technical Supervisor - Qazaqstan Expert LLP, author's supervisor - Nurzholproekt LLP).

Construction of a solid waste landfill: The total cost of the project is млн 495.2 million."construction of a solid waste landfill in the village of Terenozek, Syrdarya district. The cost of the contract for the construction of" Correction " - 464.9 million.tenge. At the expense of the regional budget for 2024 - 475.5 million rubles. 133.9 million tenge was allocated and a 30% prepayment was made.the tenge was transferred. To date, the contractor "Tekhosnastka-Remservis" LLP is working on land correction, map digging, concrete filling of the sorting complex. Construction work is planned to be completed and put into operation in September. (For reference: contractor: TEHOSNASTKA-REMSERVIS LLP, Technical Supervisor - Qazaqstan Expert LLP, author's supervisor - Nurzholproekt LLP). For public services: The department provides 5 public services. In January-August 2024, 516 services were provided. Of these, 168 services were provided through the public service center. 348 were shown through the e-government web portal. Work on the development of an architectural and planning task: In January-August, 202 architectural and planning tasks were developed for the Department. Of these, 10 are state institutions, 58 are oil companies, 134 are individual entrepreneurs and legal entities. According to the Information System" address register": Through the public service center in January-August, a certificate was issued to clarify the address 168.

On issuing permits for reconstruction works: In January-August, the department issued permits for reconstruction of 5 objects. All from an individual entrepreneur. On approval of the draft project: In January-August, 146 sketch projects were approved. On issuing permits for the installation of outdoor (visual) advertising objects: In January-August, the Kyzylorda branch of the microfinance organization LLC "KMF" (KMF) along A. Aliakbarov Street, Terenozek village, was allowed to place an outdoor (visual) advertising object (banner) in the district. For work on registration of the act of acceptance into operation: In January-August, 194 acts of commissioning of non-residential premises were registered. For individual residential buildings commissioned in the district: To date, according to the results of January-August, there are 17232.0 square meters of individual housing commissioned. Compared to last year, 102.9 percent were executed.


In the field of construction, architecture and urban planning
Work done in the II quarter of 2024

           For public services: The department provides 5 public services. In January - June 2024, 323 services were provided. Of these, 89 services were provided through the public service center. 234 were shown through the e-government web portal. Work on the development of an architectural and planning task: In January-June, 144 architectural and planning tasks were developed for the Department. Of these, 7 are state institutions, 51 are oil companies, 86 are individual entrepreneurs and legal entities.

According to the Information System" address register":

          Through the public service center in January-June, a certificate was issued to clarify 89 addresses.

          On issuing permits for reconstruction works:

In January - June, 5 objects were allowed to be reconstructed in the Department. All from an individual entrepreneur.

On approval of the draft project:

           In January - June, 90 sketch projects were approved.

On issuing permits for the installation of outdoor (visual) advertising objects:

In January - June, the Kyzylorda branch of the microfinance organization LLC "KMF" (KMF) along A. Aliakbarov Street, Terenozek village, was allowed to place an outdoor (visual) advertising object (banner) in the district.

For work on registration of the act of acceptance into operation:

         In January-June, 183 acts on the commissioning of non-residential premises were registered.

          For individual residential buildings commissioned in the district:

           To date, according to the results of January - June, there are 9531.6 square meters of commissioned private housing. Compared to last year, 108.4 percent were executed.


In the field of construction, architecture and urban planning
Work done in the I quarter of 2024

For public services:

 The department provides 5 public services. In January-March 2024, 132 services were provided. Of these, 28 services were provided through the public service center. 104 were shown through the e-government web portal.

 Work on the development of an architectural and planning task:

In January-March, 50 architectural and planning tasks were developed for the Department. Of these, 6 are state institutions, 3 are oil companies, 41 are individual entrepreneurs and legal entities.

 According to the Information System" address register":

 Through the public service center in January-March, a certificate was issued to clarify 28 addresses.

On approval of the draft project:

In January - March, 44 sketch projects were approved.

On issuing permits for the installation of outdoor (visual) advertising objects:

In January-March, a microfinance organization "KMF" (KMF) was organized in the district along A. Aliakbarov Street, Terenozek village


In the field of construction, architecture and urban planning
Work done in the IV quarter of 2023

The Department of construction, architecture and urban planning of Syrdarya district informs the following about the work done in 2023.

On electricity supply:

1.6 billion (1614) tenge was allocated from the Republican and regional budgets for 4 projects within the framework of the programs" power supply of amankeldy, Aidarly, Zhetykolsky, Kogalykol settlements of Syrdarya District"," strong regions – the driver of the country's development"," Auyl-El besigi", the construction of 4 facilities (Aidarlyk, Zhetykolsky, Amankeldy, Kogalykol) was completed and the facilities were put into operation.

By drinking water:

The project cost 5 56.7 million.for the construction of water supply and viewing wells along A. Kunanbayev, R. Orazgalieva streets in the village of Chagan, the amount of tenge was 51.7 million rubles. "I don't know," he said. In particular, water supply was carried out for 1113 meters. 17 water supply viewing wells were installed. The amount of funds disbursed amounted to 51.4 million.tenge.

Also, the project cost млн 178.9 million.OB and NF - 124.6 million tenge for the construction of water supply and viewing wells along G. Muratbayev, A. Imanov and A. Imanov lane streets in the village of Chagan.tenge was allocated. Construction and installation works are being carried out with Altyn Aidarli LLP. The work planned for 2023 will be completed on 01.12.2023. To date, 3073 meters of water supply have been laid. 40 water supply viewing wells were installed. The facility is transitioning to 2024. The amount of funds disbursed for 01.01.2024 amounted to млн 123.6 million.tenge.

The project cost млн 101.6 million.OB and NC-95.2 million tenge for the construction of water supply and viewing wells along M. Esmakhov, A. Tleulieva streets in Kogalykol village. "I don't know," he said. According to the project, 4089 meters of water supply were laid. 32 water supply viewing wells were installed. The amount of funds disbursed amounted to 94.7 million tenge.tenge.

The project cost млн 204.4 million.in 2023, RB – 101.6 million tenge was allocated for the construction of water supply networks in the village of Terenozek along G. Muratbayev Street, Sh.Kundyzbayev Street, O. Abdulpattayev Street, Toganas batyr Street, Kazakh Street, I. Toktybayev street. "I don't know," he said. The facility is transitioning to 2024. The amount of funds disbursed amounted to 101.6 million tenge.tenge.

The project cost млн 103.4 million.for 2023, RB -76.0 million was allocated for the construction of a water supply network in the village of Terenozek along A. Kunanbayev Street, Zhambyl Street, 50th anniversary of victory Street, A. Aliakbarov street. "I don't know," he said. The facility is transitioning to 2024. The amount of funds disbursed for 01.01.2024 amounted to 76.0 million.tenge.

 

By sports facility:

At the expense of the regional budget, a total of млн 362.4 million was allocated for the transitional construction of a sports complex in the Besaryk settlement, the construction of which began in 2022. tenge is considered. 218.2 million from the regional budget for the completion of construction work for 2023. tenge was allocated and the amount of funds disbursed for 01.01.2024 amounted to млн 140.8 million.tenge. The facility is transitioning to 2024.

On housing provision:

30.4 million from the district budget for the construction of two three-room housing in zhetykolsky settlements.the tenge was allocated, construction and installation works were completed and put into operation for the benefit of the country.

In addition, 796.8 million tenge was allocated from the Republican and regional budgets for the purchase of adjacent housing for socially vulnerable segments of the population in the village of Terenozek.tenge, from the budget-6.7 million.tenge was allocated.

To date, 38 adjacent residential buildings (76 apartments) have been purchased and commissioned for the purchase of housing with the announcement of Public Procurement.

Development and arrangement of engineering and communication infrastructure of construction areas:

The project cost is 877.6 million.the infrastructure of the new microdistrict in the village of Terenozek (100 hectares) for the start of the construction of a gravel road in the amount of KZT 200.0 million from the regional budget for 2023.the funds were allocated in tenge, and construction work is underway with the contractor "AK pond" LLP. Construction work will be carried out from 2023 to 2025. The length of the gravel road is 15.1 km. The facility is transitioning to 2024. The amount of funds disbursed for 01.01.2024 is млн 199.4 million.tenge.

(For reference: contractor: AK Togan LLP, technical contractor - Astanadorarkitex LLP).

The cost of the project is 257.6 million rubles. for 2023, 147.9 million tenge was allocated from the regional budget for the start of the construction of a gravel road infrastructure (35 hectares) of a new microdistrict in the village of Terenozek, which is worth tenge, and construction work is underway with the contractor "AK pond" LLP.

Construction work will be carried out from 2023 to 2025. The facility is transitioning to 2024. The amount of funds disbursed for 01.01.2024 is млн 147.9 million.tenge.

In addition, the cost of the project in 2023 is 1 116.7 million.construction of gas distribution networks (35 hectares) infrastructure of a new microdistrict in the village of Terenozek, Syrdarya district, in the amount of tenge. The total estimated cost of the project is млн 126.3 million.tenge. OB for 2023 -11.6 million. the money was allocated in tenge. The contractor carrying out construction and installation works is "Astana Construction Group" LLP. Technical supervisor Stroy city LLP. To date, a gas pipeline with a diameter of Ø 63 mm - 872 meters, Ø 75 mm - 473 meters, Ø 110 mm - 625.5 meters, Ø 90 mm - 525 meters has been laid. The facility is transitioning to 2024. The amount of funds disbursed for 01.01.2024 is млн 11.6 million.tenge.


In the field of construction, architecture and urban planning
Work done in the III quarter of 2023

About the work done in the district Department of Construction, Architecture and Urban Planning for January - September 2023.

On power supply:

1.6 billion (1614) tenge was allocated from the republican and regional budgets for the work "electricity supply of settlements of Amankeldy, Aidarly, Zhetikol, Kogalykol of Syrdarya district" within the framework of the programs "powerful regions – the driver of the country's development", "Auyl-El besigi".

To date, construction work has been completed on 4 projects (Aidarly, Zhetykol, Amankeldy, Kogalykol), objects have been accepted.

To date, a land management project is being developed by the Syrdarya District Department for Registration and Land Cadastre of the Government for Citizens branch of the Kyzylorda Region to transfer the above objects to the balance sheet of JSC "KRЕK".

For the construction of a drinking water supply network:

the project "construction of drinking water supply and observation wells along 7 streets of the settlements of Chagan, Kogalykol of Syrdarya district" with a total length of 7.5 km (7532), developed through sponsorship, for 2023 within the framework of the program "Auyl - El besigi", TENGE was allocated from the republican and regional budgets -278.7 million dollars.

Contracts have been signed with "Real Stroy Invest" LLP, "Altyn Aidarly" LLP, construction works are underway today.

By sports facility:

At the expense of the regional budget funds for the transitional construction of a sports complex in the settlement of Besaryk, the construction of which began in 2022, a total of 362.4 million tenge was considered. In 2022, 144.2 million tenge was disbursed. For the completion of construction for 2023, $ 218.2 million has been allocated from the regional budget. tenge has been allocated, construction work is being carried out by the contracting institution SCS Engineering LLP.

On housing provision:

For the construction of two three-room residential houses in the settlements of Zhetykol of the Syrdarya district from the district budget (30.4 million tenge), construction and installation works have been completed, the Department for regional Control took into account the act of acceptance into operation No. 05-03 / 3750 on 25.08.2023.

For further transfer of housing to the balance of the akim of Zhetykol rural district, the Syrdarya district Department for Registration and Land Cadastre of the branch of JSC GKP "Government for Citizens" in the Kyzylorda region is developing a technical passport for the registered real estate object.

On development and arrangement of engineering and communication infrastructure of construction areas:

The cost of the project is 877.6 million tenge for 2023 from the regional budget - 200.0 million tenge for the start of construction of a crushed stone infrastructure road (100 hectares) of a new microdistrict in the village of Terenozek.tenge has been allocated, construction works are being carried out by the contracting institution "Ak Togan" LLP. Construction work will be carried out from 2023 to 2025. The length of the gravel road is 15.1 km .

(For reference: Contracting agency: Ak Togan LLP, technical specialist - Astanadorarkitex LLP).

The cost of the project is 257.6 million tenge for 2023 from the regional budget - 147.9 million tenge was allocated for the start of construction of a crushed stone road infrastructure of a new microdistrict (35 hectares) in the village of Terenozek, contractor "Ak Togan" LLP.

Construction work will be carried out from 2023 to 2025.

In addition, in 2023, the project cost is $116.7 million.for the construction of gas distribution networks of the infrastructure of a new microdistrict (35 hectares) in the village of Terenozek of the Syrdarya district, an application was submitted for financing from the republican and regional


In the field of construction, architecture and urban planning
Work done in the II quarter of 2023

On power supply:

In Syrdarya district, through the District Department of construction, architecture and urban planning in 2023, 1.6 billion (1614) tenge was allocated from the Republican and regional budgets for 4 projects within the framework of the programs «powerful regions – the driver of the country's development», «Auyl-El besigi» for the power supply of 4 settlements.

In particular:

According to the project in the village of Aidarly, ktpn-10/0, 4 KV-160 KVA - 8 pieces, vlz-10 kV-3.9 km, VLI-0.4 KV-15.4 km of power lines were carried out.

According to the project in Zhetykolsky settlement,ktpn-10/0, 4 KV-160 KVA - 7 pieces, vlz-10 kV-3.9 km, VLI-0.4 KV-15.6 km of power lines were carried out.

To date, the construction of 2 projects (power supply to Aidarli and Zhetykols settlements) has been completed and the facility is being accepted.

Construction of 2 projects (power supply to Kogalykol and Amankeldy settlements) will be completed in August and put into operation.

Construction of a drinking water supply network:

For the projects "construction of drinking water pipes and viewing wells along 7 streets of Chagan, Kogalykol settlements of Syrdarya district" with a total length of 7.5 km (7532), developed at the expense of sponsorship, within the framework of the "Auyl - El besigi" program, 245.8 million tenge was allocated from the Republican budget for 2023.

On engineering and municipal infrastructure:

The total cost of infrastructure (construction of a gravel road) (100 hectares) of a new microdistrict in the village of Terenozek is 877.6 million tons.200.0 million tenge from the regional budget for the project for 2023.as a result of public procurement, the contractor was identified – «AK Togan» LLP, the technical supervisor – «AstanaDorArkitex» LLP. The length of the gravel road is 15.1 km.

The regional department for control on 08.06.2023 received a permit for the start of construction work, and today construction work is underway. The object is transient.

At the same time, the total cost of the infrastructure (construction of a gravel road) (35 hectares) of the New microdistrict in the village of Terenozek is 263.5 million tenge for 2023, 147.9 million tenge was allocated from the regional budget for the project, as a result of Public Procurement, a contractor was identified– «AK Togan» LLP, a technical supervisor- «UKC» LLP. The length of the gravel road is 4.2 km.

The regional department for control on 08.06.2023 received a permit for the start of construction work, and today construction work is underway. The object is transient.

By sports facilities:

The project cost is млн 381.8 million. tenge in 2022, at the expense of the transfer of the regional budget to the project «construction of a sports complex in Besaryk settlement» in the amount of KZT 144.2 million. tenge has been disbursed.

218.2 million tenge for construction and construction works for 2023 has been allocated, and construction work is underway with the contractor «SCS Engineering» LLP. Execution of construction works - 50 percent. In September of this year, it is planned to complete construction work and put into operation.

On housing provision:

The total cost of the project for the construction of two three – room residential buildings in Zhetikol settlements of the Syrdarya district is 30.9 million rubles. tenge.

To date, construction work is underway with the contractor «Orion LTD» LLP. The duration of construction is 2.5 months.

According to the work done on June 1 of this year, 5.0 million tenge was allocated.

487 services were provided through the District Department of construction, architecture and urban planning for January-June 2023.

Of these, 71 services were provided through the public service center. 416 services were provided through the e-government web portal.

In particular:

Work on the development of an architectural and planning task:

By Department for January-June 2023 "www.elicense.kz" 173 architectural and planning tasks have been developed through the portal. Of these, 23 are oil companies, 150 are individual entrepreneurs and legal entities.

According to the Information System «address register»:

Through the public service center and the e-government web portal for January-June 2023, A certificate was issued for determining the address of 71 (84 on the e-government web portal).

On issuing permits for reconstruction works:

For January-June 2023, the department did not receive an application in connection with the reconstruction.

 On approval of the draft project:

For January-June 2023  124 draft projects were approved through the portal «www.elicense.kz» Including: 13 business facilities. 111-housing construction.

35 applications were received for the issuance of permits for a set of works on the subsequent disposal of objects (demolition of structures).

The application for permission to distribute the money of the shareholder has not been received.

For work on accounting for the act of acceptance into operation:

For January-June 2023, 18 acts on the commissioning of non-residential premises were taken into account.

For January-June 2023, acts on commissioning of 60 residential buildings were taken into account.

For individual residential buildings commissioned in the district:

To date, according to the results of January-June 2023, there are 8786.1 square meters of commissioned private housing. Compared to last year, 126.8 percent were executed.


In the field of construction, architecture and urban planning
Work done in the I quarter of 2023

The Syrdarya District Department of Construction, Architecture and Urban Planning reports on the work done in January-March 2023.

On power supply:

Through the Syrdarya district Department of Construction, Architecture and Urban Planning, the necessary funds were allocated from the sources of the republican and regional budgets for the construction work «electricity supply to the settlements of Aidarly, Amankeldy, Zhetykol, Kogalykol of the Kyzylorda region, Syrdarya district», worth 1.6 billion tenge for 2023.

Exactly:

1) The total estimated cost for the working project «electricity supply of the Aidarly settlement of the Syrdarya district» is 327,735,876 thousand tenge. The cost of the contract is 306,014.5 thousand tenge. Contracting organization «Universalstroyservice» LLP; technical supervision of «Akbozat LTD» LLP; author's supervision of «PSK Qabylet» LLP.

A notification was received from the Control Department of the Kyzylorda region on the start of construction work on 02/27/2023. The duration of construction is 3 months. To date, the contracting institution "Universalstroyservice" LLP has installed 0.4 kV - 544 pcs., 10 kW – 133 pcs., A total of 677 pcs. of reinforced concrete supports. 7 people and 3 pieces of equipment are temporarily employed at the construction site. As of April 1, 2023, 119 669.9 thousand tenge has been disbursed.

2) The total estimated cost for the working project «electricity supply of the settlement of Zhetykol of the Syrdarya district» is 304 573,156 thousand tenge. The cost of the contract is 285,305.1 thousand tenge. Contracting organization «Universalstroyservice» LLP; technical supervision of «Nuralem-Kurylys» LLP; author supervision of «PSK Qabylet» LLP.

A notification was received from the Control Department of the Kyzylorda region on the start of construction work on 02/27/2023. The duration of construction is 3 months. The contracting institution «Universalstroyservice» LLP installed reinforced concrete columns of 0.4 kV - 612 pieces, 10 kV – 115 pieces, a total of 727 pieces.reinforced concrete columns are installed. 5 people and 2 pieces of equipment are temporarily employed at the construction site. As of April 1, 2023, 112 203.0 thousand tenge has been disbursed.

3) The total estimated cost for the working project «electricity supply of the Kogalykol settlement of the Syrdarya district» is 460,931.9 thousand tenge. The cost of the contract is 438 571.9 thousand tenge. Contracting organization «Universalstroyservice» LLP; technical supervision of «Aretmida snab» LLP; author supervision of «CB Munaygazengineering» LLP.

A notification was received from the Control Department of the Kyzylorda region on the start of construction work on 02/27/2023. The duration of construction is 5 months. The contracting institution «Universalstroyservice» LLP installed reinforced concrete columns of 0.4 kV - 484 pcs., 10 kV – 271 pcs., a total of 755 pcs. of reinforced concrete supports. 11 people and 3 pieces of equipment are temporarily employed at the construction site. As of April 1, 2023, 162,461.7 thousand tenge has been disbursed.

4) The total estimated cost for the working project «power supply of the settlement of Amankeldy of the Syrdarya district» is 554,252.3 thousand tenge. The cost of the contract is 518,461. 215 thousand tenge. Contracting organization of «Universalstroyservice» LLP; technical supervision of «Asem-Kurylys-Kyzylorda» LLP; supervision of the Design Bureau of «Munaygazengineering» LLP;

A notification was received from the Control Department of the Kyzylorda region on the start of construction work on 03/28/2023. The duration of construction is 5 months. Construction works are being carried out by the contracting institution "Universalstroyservice" LLP. As of April 1, 2023, 134 254.0 thousand tenge has been disbursed. 30% advance payment.

On the construction of a drinking water supply network:

1) At the expense of sponsorship from «PSK Qabylet» LLP in the village of Chagan of the Syrdarya district, streets of A. Kunanbayev, R. Orazgalieva, G. Muratbayev, A. Imanov and streets of M. Esmakhov, A. Tleulieva in the village of Kogalykol, the settlement of Amankeldy Zh. Kulymbetov, A. Akaydarov, a. For the construction of drinking water pipelines and inspection wells on Zhankina St., a PSD has been prepared and positive expert opinions have been received. By letter No. 04-1/3448 dated December 26, 2022, an application for financing from the republican and regional budgets for 2023 within the framework of the Auyl-El Besigi program was submitted to the regional Department of Energy and Housing and Communal Services. Currently, it is planned to allocate funds from the republican and regional budgets for construction work.

By ICI:

1) In 2021, the design institution of Dimash-Service LLP developed working projects «infrastructure of a new microdistrict in the village of Terenozek (construction of a gravel road) (100 ha) and (35 ha)», received positive expert opinions. The total estimated cost of projects (100 hectares) is 889,626.0 thousand tenge, (35 hectares) - 263,492.0 thousand tenge.

At the expense of the regional budget for 2023, «infrastructure of a new microdistrict in the village of Terenozek (for the construction of a gravel road) (100 hectares)» - 200.0 million tenge, «infrastructure of a new microdistrict in the village of Terenozek (for the construction of a gravel road) (35ha)» - 147.9 million tenge were allocated. In the period from 2023 to 2025, funds will be allocated in stages for construction and installation work.

Currently, work is underway on public procurement through the regional public procurement department for construction and installation work.

2) For the infrastructure of a new microdistrict in the village of Terenozek of the Syrdarya district (construction of gas networks) (35 ha), «Kaz Nur Design and Construction Institute» LLP has developed design and estimate documentation and received a positive expert opinion dated 17.02.2023 No. 19-0072/23 RSE «Gosexpertiza». A budget application for financing 2023 was submitted to the Regional Department of Construction, Architecture and Urban Planning dated 02/28/2023 by letter No. 04-1/528

3) Design and estimate documentation has been developed for the infrastructure (construction of gas networks) of a new microdistrict in the village of Terenozek of the Syrdarya district (100 ha) of Kaz Nur Design and Construction Institute LLP, December 28, 2022 from the Department of Ecology for the Kyzylorda Region of the Committee for Environmental Regulation and Control of the Ministry of Ecology, Geology and Natural Resources of the Republic of Kazakhstan; Received conclusion on the definition of the areas of coverage of the impact assessment. Currently, the documents for obtaining a positive expert opinion are submitted to the RSE «Gosexpertiza».

By housing:

1) Based on the decision of the Syrdarya district maslikhat of the Kyzylorda region dated August 14, 2020 No. 420 for construction and installation work on the working project « construction of two 3 - room residential buildings in the Zhetykol settlement of the Syrdarya district of the Kyzylorda region» from the local budget -500.0 thousand tenge. Contract No. 54 dated November 02, 2020 was signed with the winning contractor Orion LTD LLP, the allocated funds have been disbursed.

27,313.0 thousand tenge was allocated for the completion of construction works by the Syrdarya District Department of Economics and Budget Planning in accordance with the decision of the Syrdarya district Maslikhat dated December 20, 2022 No. 175 "On the district budget for 2023-2025" for construction and installation works for 2023.

Currently, through the regional Department of public Procurement, work is underway on public procurement and the conclusion of contracts for the completion of construction works.

 

The state service was provided in January-March 2023.

In January-March 2023, 287 services were provided. Of these, 46 services were provided through the public service center. 241 was demonstrated through the e-government web portal.

On the development of the architectural and planning task:

For January-March 2023 according to the section "www.elicense .kz through the portal" 103 architectural and planning tasks have been developed. Of these, 13 are from oil companies, 90 are from individual entrepreneurs and legal entities.

According to the Address Register information system :

Through the public service center and the e-government web portal for January-March 2023, a certificate was issued to determine 31 addresses (51 on the e-government web portal).

For the issuance of permits for reconstruction work:

In January-March 2023, no appeals were received by the department in connection with the reconstruction.

By agreement of the preliminary design:

For January-March 2023 "www.elicense .kz through the portal" consent was received for 71 draft designs. Of these: 6 are business objects. 65-housing construction.

For the issuance of a permit to carry out a complex of works on the subsequent disposal of objects (demolition of structures), 16 applications were received.

There were no applications for the issuance of a permit for the liquidation of the shareholder's money.

According to the accounting of the act of acceptance into operation:

In January-March 2023, acts on the commissioning of 11 non-residential premises were taken into account.

In January-March 2023, the acceptance certificates for 25 residential buildings were taken into account.

By commissioned individual residential buildings by district:

To date, 1730.2 sq. m. of individual residential buildings commissioned in January-March 2023 has been completed by 107% compared to last year.


In the field of construction, architecture and urban planning
Work done in the IV quarter of 2022

         221.8 million tenge was allocated from all budget sources for construction and installation work on the department in 2022. Work was carried out on 2 projects.

Including:

SPORTS FACILITIES:

1) At the expense of the regional budget funds, 33.6 million tenge was allocated for the construction of the training and streetball grounds of the KSU Specialized Children's and Youth School of the Olympic Reserve No. 11 of the Syrdarya district on the area of building No. 3 A along Amangeldy Street, construction and installation works were carried out by the contractor institution PULSE LLP, commissioned in July this year. The allocated funds have been fully disbursed. The saved funds amounted to 1.7 million tenge. returned to the budget. Author's supervision -Shynar Project and Company LLP; technical supervision – Asem-Kurylys-Kyzylorda LLP;

2) The project cost is 389.2 million tenge. 190.9 million tenge has been allocated for the construction of a sports complex in the settlement of Besaryk in the Syrdarya district at the expense of the regional budget, construction and installation works are being carried out by the contractor institution "SCS Engineering" LLP. Author's supervision - "Krez-Service" LLP; technical supervision - "Aimereke" LLP; Earthworks, drinking and sewage networks, foundation works of the sports complex, construction of fencing, installation of electricity poles, excavation, laying of crushed stone sand foundation for foundations, development of a toilet place, soil tray under the coating (paving stones, asphalt), concreting of the boiler house foundation, start of pipelines of heating networks for concreting boiler pits, completed work on laying the foundation of the sports complex between the axes 1/5-A/G. As of December 1, 2022, 144,102 million tenge has been disbursed. Construction work will move to 2023.

         BY ICI:

1) For the infrastructure of a new microdistrict in the village of Terenozek, Syrdarya district (construction of gas networks) (100 ha) and (35 ha) Kaz Nur Design and Construction Institute LLP, design and estimate documents have been developed and documents submitted to the RSE Gosexpertiza for obtaining a positive expert opinion on design and estimate documentation.

2) in 2021, design and estimate documents "infrastructure of a new microdistrict in the village of Terenozek (construction of a gravel road) (100 ha) and (35 ha)" were developed, on March 19, 2021, an expert opinion was received and a budget application for financing of the regional department of construction, architecture and urban planning was submitted.

However, today it is not supported without funding.

In accordance with the minutes of the meeting of the budget commission dated April 19, 2022 No. 7 on the volume of spending limits of administrators of regional budget programs for 2023-2025, a budget application for funds of 2023 No. 04-2/1040 was sent to the regional Department of Construction, Architecture and Urban Planning on May 17, 2022. Also, at the expense of the regional budget for 2023, funds were allocated for the "infrastructure of a new microdistrict in the village of Terenozek (for the construction of a gravel road) (100ha)" - 200 000,0 thousand. tenge, "infrastructure of a new microdistrict in the village of Terenozek (for the construction of a gravel road) (35ha)" - 147 982.0 thousand tenge. Currently, public procurement of construction and installation and technical supervision works is underway.

In the case of construction work on the above project, 693 land plots of 1000 square meters will be opened, which will provide the population with a land plot for housing construction.

        BY POWER LINE:

Electric poles and networks of the settlements of Aidarly, Amankeldy, Zhetykol, Kogalykol of the Syrdarya district were placed when they were created in 1974 and work has not been carried out to replace them with new ones, due to the wear of electric current distribution transformers in the autumn and spring periods from precipitation, during periods of snowmelt, accident conditions often occur.

In accordance with this, design and estimate documents have been developed for the above-mentioned settlements and a budget application for republican and regional funds has been submitted to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan for 2023 through the Regional Department of Construction, Architecture and Urban Planning.

Also, in accordance with the resolution of the Syrdarya district Maslikhat No. 269 dated September 19, 2022, 400.0 thousand tenge was allocated from the district budget for each project for 100.0 thousand tenge for the start of construction works for 2022.

Syrdarya District Department of Economics and Budget Planning in accordance with the decision of the Syrdarya district Maslikhat dated December 20, 2022 No. 175 "On the district budget for 2023-2025" for construction and installation works for 2023 in the locality of Aidarly in the amount of 320,670.0 thousand tenge, in the locality of Zhetykol in the amount of 303,191.0 thousand tenge, in The settlement of Kogalykol in the amount of 499,308.0 thousand tenge, 491,700.0 thousand tenge was allocated in the settlement of Amangeldy at the expense of a targeted transfer from the National Fund under the program "Auyl-El besigi".

        ON THE DRINKING WATER LINE:

In 2022, the project "Construction of a water supply network on G. Muratbayev St., Sh. Kundyzbayev St., O. Abdulpattayev St., Toganas Batyr St., Kazakhskaya St., I. Toktybayev St., Terenozek Syrdarya district of Kyzylorda region" and "Construction of a water supply network on Zhambyl St., 50 St. will be implemented due to sponsorship through PSC Qabylet LLP. let Pobedy, A. Aliakbarov str. in the village. Terenozek of Syrdarya district of Kyzylorda region" working projects have been developed, a positive expert opinion has been received.

A budget application for funds for 2023 was submitted to the Department of Economics and Housing of the Regional Department of Construction, Architecture and Urban Planning for work on these projects. Through the Regional Department of Construction, Architecture and Urban Planning, a budget application was sent to the Committee for Construction and Housing and Communal Services of the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan.

In accordance with the resolution of the Syrdarya district Maslikhat No. 269 dated September 19, 2022, 100.0 thousand tenge was allocated from the district budget for each project in the total amount of 200.0 thousand tenge for the start of construction works for 2022. Currently, through the regional public procurement department and district public procurement departments, public procurement is carried out through an open tender for construction work.

In addition, due to the sponsorship of the designing institution through "PSK Qabylet" LLP, working projects were developed "Construction of water pipes and inspection wells on G. Muratbayev St., A. Imanov St. and A. Imanov dead end on A. Kunanbayev St., R. Orazgaliev St. of the settlement Shagan of the Syrdarya district of the Kyzylorda region", "Construction of water pipes and inspection wells on streets of Zh. Kulymbetov, A. Akaydarov, A. Zhankin of the settlement of Amankeldy of the Syrdarya district of the Kyzylorda region", "Construction of drinking water pipes and observation wells along the streets of A. Tleulieva, M. Esmakhov in Kogalykol settlement of Syrdarya district of Kyzylorda region". By letter No. 04-1/3448 dated December 26, 2022, an application for financing from the republican and regional budgets for 2023 within the framework of the Auyl-El Besigi program was submitted to the regional Department of Energy and Housing and Communal Services.

 

           The state service was provided in January-December 2022.

In January-December 2022, 1177 services were provided. Of these, 572 services were provided through the public service center. 605 provided through the e-government web portal.

          On the development of architectural and planning tasks:

For January-December 2022 according to the section "www.elicense .kz " 213 architectural and planning tasks have been developed through the portal. Of these, 25 are from oil companies, 166 are from individual entrepreneurs and legal entities.

         According to the Address Register information system :

          Through the public service center and the e-government web portal for January-December 2022, a certificate was issued to determine 335 (200 according to the e-government web portal) addresses.

          On issuing permits for reconstruction work:

In January-December 2022, no appeals were received by the department in connection with the reconstruction.

        By agreement of the draft project:

For January-December 2022 "www.elicense .kz through the portal " consent was received for 152 draft projects. Of these: 5 are business objects. 126-housing construction. 1-oil company, 1-mosque building

On the issuance of a permit to carry out a complex of works on the subsequent disposal of objects (demolition of structures), 9 applications were received. 

There were no applications for the issuance of a permit for the liquidation of the shareholder's money.

         According to the accounting of the act of acceptance into operation:

         In January-December 2022, acts on the commissioning of 42 objects of non-residential premises were taken into account.

         In January-December 2022, the acceptance certificates for 145 residential buildings were taken into account.

          By commissioned individual residential buildings by district:

           To date, according to the results of January-December 2022, 23795.4 sq. m. have been commissioned for individual residential buildings by 152.2% compared to last year.


In the field of construction, architecture and urban planning
Work done in the III quarter of 2022

"For the construction of the territory of the border post" Tushchykuduk" in the Syrdarya District of Kyzylorda region with reinforced concrete fences, design estimates were developed through "KB" Munaygazinzhiniring "LLP, and a positive opinion of the expert examination №as-0075/22 was obtained through" AIM company " LLP on February 24, 2022. On March 30, 2022, a budget application was submitted to the Regional Department of construction, architecture and urban planning for 2023 with a letter No. 06-2/237. Through the Regional Department of construction, architecture and urban planning, a budget application was submitted to the Regional Department of economy and budget planning on April 04, 2022 with a letter No. 04-88/617.

Construction work is underway with the contractor" pulse "LLP on the construction of a training and streetball court for the construction of a specialized children's and youth School of the Olympic Reserve No. 11 of the Syrdarya district on the site of the building No. 3A on Amankeldy Street. The estimated cost of the project is млн 32.5 million. tenge.
The amount of the contract is 29.6 million. tenge. Author's supervisor-Shynar project and Company LLP; Technical Supervisor-Asem-Kurylys-Kyzylorda LLP;
Construction work was completed and commissioned in July. The allocated funds were fully disbursed.

The project cost 389.2 million. construction works are being carried out by the contractor "SCS Engineering" LLP for the construction of a sports complex in Besaryk settlement of Syrdarya district in the amount of tenge. By the decision of the district maslikhat No. 107 "on the district budget for 2022-2024" dated December 28, 2021, 190.9 million rubles were allocated for the start of construction for 2022. the tenge was allocated. The contract amount is 347.6 million. tenge. Author's supervisor - "Croz-Service" LLP; Technical Supervisor - "Aymereke" LLP;
Currently, work is underway to install a foundation from the soil to cover the territory, metal columns and beams of the Sports Complex are being developed, work is underway to install roofing of the roof of the heating boiler house. As of October 1, 2022, 144.1 million. tenge has been disbursed. Construction work is transitional to 2023.

In 2021, within the framework of the Nurly zher state program" for 13 ( thirteen) residential buildings (26 adjacent apartments) purchased for socially vulnerable segments of the population and low-income large families on N. Berdikulov Street in Terenozek, Syrdarya district, Kyzylorda region (object transition to 2022) by the decision of the Syrdarya district maslikhat No. 145 dated July 25, 2022, the remaining 13.0 million tenge was allocated.the tenge was allocated and fully disbursed. By order of the district financial department No. 44 dated September 05, 2022 and Order No. 56 dated September 28, 2022, it was transferred from the balance of the department to the balance of the Office of the Akim of the village of Terenozek.

Project and estimate documentation for the infrastructure (construction of gas distribution networks) (100 hectares) and (35 hectares) of the new microdistrict in Terenozek village of Syrdarya District of Kyzylorda region was developed by Kaz Nur design and Construction Institute LLP.
To date, documents have been submitted to RSE "Gosexpertiza" for a positive expert opinion of design and estimate documents.

Also, in 2021, the infrastructure of the new microdistrict (construction of a gravel road) (100 hectares) and (35 hectares) in the village of Terenozek, Syrdarya district, Kyzylorda region, through Dimash-Service LLP, the design and estimate documentation was developed, through Frost KZ LLP No. Frost-0049/21 on March 19, 2021 and No. Frost-0049/21 on March 15, 2021 0047/21 positive conclusions of the examination were obtained.
On September 20, 2021, a budget application was submitted to the Regional Department of construction, architecture and urban planning, and in accordance with protocol No. 7 of the meeting of the Budget Commission dated April 19, 2022 on the volume of spending limits for administrators of the regional budget program for 2023-2025, funds will be allocated and construction work will be carried out between 2023-2025.
The cost of the project is (construction of a gravel road) (100 hectares) – 877,575.8 thousand tenge and (construction of a gravel road) (35 hectares) - 257,616. 1 thousand tenge.

A budget application was submitted to the Regional Department of construction, architecture and urban planning for the construction work" power supply of the settlements of Aidarli, Amankeldy, Zhetykolsky, Kogalykol " of Kyzylorda region, Syrdarya district, and a budget application was submitted to the Ministry of Industry and infrastructure development of the Republic of Kazakhstan for 2023 through the Regional Department of construction, architecture and urban planning. The total cost of the projects is млрд 1.6 billion. "I don't know," he said.
Also, in accordance with the resolution of the Syrdarya district maslikhat of September 19, 2022 No. 269, for the start of construction work for 2022, funds were allocated from the district budget for each project in the amount of 100.0 thousand tenge for a total of 400.0 thousand tenge. Currently, through the Regional Department of Public Procurement, public procurement is carried out by an open competition for construction works.

The project cost 307.8 million. construction of a water supply network along G. Muratbayev Street, Sh. Kundyzbayev Street, O. Abdulpattayev Street, Toganas batyr Street, Kazakh Street, I. Toktybayev Street and" construction of a water supply network along A. Kunanbayev Street, Zhambyl Street, 50th anniversary of victory Street, A. Aliakbarov street " of Terenozek village of Syrdarya District of Kyzylorda region in 2023, the Department of architecture and urban planning sent a budget application to the Committee for construction and housing and communal services of the Ministry of Industry and infrastructure development of the Republic of Kazakhstan.
Also, in accordance with the resolution of the Syrdarya district maslikhat of September 19, 2022 No. 269, for the start of construction work for 2022, funds were allocated from the district budget for each project in the amount of 100.0 thousand tenge for a total of 200.0 thousand tenge. Currently, through the Regional Department of Public Procurement and the district departments of Public Procurement, public procurement is carried out by an open competition for construction works.


In the field of construction, architecture and urban planning

Work done for the II quarter of 2022

For the construction of reinforced concrete fences on the territory of the Tushchykuduk PO of the Syrdarya district of the Kyzylorda region, design and estimate documentation was developed through the CB «MunayGas Engineering» LLP Design Bureau and a positive expert opinion № AS-0075/22 of February 24, 2022 was obtained through the «AIM company» LLP. By letter №06-2/237 dated March 30, 2022, a budget application was submitted to the Regional Department of Construction, Architecture and Urban Planning for the funds of 2023.

Through the Regional Department of Construction, Architecture and Urban Planning, a budget application was submitted to the Regional Department of Economics and Budget Planning.

For the construction of a 130 kW solar power plant for the Tushchykuduk border department of the Syrdarya district of the Kyzylorda region, CB «MunayGas Engineering» LLP has developed a PSD and received a positive expert opinion №EPRO-0009/22 dated April 20, 2022 through «Expert PRO» LLP.

A budget application for 2023 has been submitted to the Regional Department of Energy and Utilities.

Through the regional Department of Energy and Utilities, a budget application was submitted to the Department of Economy and Budget Planning of the Kyzylorda region.

Due to the sponsorship of the «construction of a school for 250 places in the village of Terenozek of the Syrdarya district» through CB «MunayGas Engineering» LLP in 2021, design and estimate documentation was developed, a positive expert opinion No. EI-0005/22 of March 24, 2022 was received by «Expertise Engineering» LLP. The estimated cost of the project is 1,454,521.3 thousand tenge. By letter No. 06-2/236 dated March 30, 2022, a budget application was submitted to the Department of Education for the Syrdarya district of the Department of Education of the Kyzylorda region for the funds of 2022.

The contractor organization «PULSE» LLP is carrying out construction work on «the construction of a gym and streetball grounds in the Syrdarya district specialized children's and youth school of the Olympic Reserve №11 on A.Imanov Street № 3». The estimated cost of the project is 32,575.0 thousand tenge. The contract amount is 29,653.03 thousand tenge. Author's supervision – «Shynar Project and Company» LLP; Technical supervision- «Asem-Kurylys-Kyzylorda» LLP;

90% of construction and installation works have been completed. Currently, work is underway on street lighting. As of June 1, 2022, 9,260,684 thousand tenge has been disbursed.

In July of this year, construction work has been fully completed and commissioning is planned.

According to the "construction of a sports complex in the village of Besaryk of the Syrdarya district", construction works are being carried out by the contractor organization «SCS Engineering» LLP

by the decision of the district maslikhat №107 dated December 28, 2021 «On the district budget for 2022-2024» 190,929.0 thousand tenge was allocated for the start of construction for 2022.

The estimated cost of the project is 389,185.0 thousand tenge. The contract amount is 347,610.0 thousand tenge. Author's supervision – «Krez-Service» LLP; technical supervision-«Aimereke» LLP;

Earthworks, water supply and sewerage networks, foundation works of the complex have been carried out. Currently, fencing is being built, power grid supports are being installed. As of June 01, 2022, 11 738,401 thousand tenge has been disbursed.

15 774.0 thousand tenge was allocated for the development of design and estimate documentation (construction of gas distribution networks) (100 ha) and (35 ha) infrastructure of a new microdistrict in the village of Terenozek of the Syrdarya district of the Kyzylorda region, public procurement works were announced through the public procurement department through an open tender, the winner of which is the establishment of «Kaz Design and Construction Institute Nur» LLP is currently developing design and estimate documentation.

Also in 2021, design and estimate documentation was developed through «Dimash-Service» LLP "Infrastructure of a new microdistrict in the village of Terenozek in the Syrdarya district of the Kyzylorda region (construction of a gravel road) (100 ha) and (35 ha), through Frost KZ LLP on December 19, 2021, positive expert opinions were received № Frost-0049/21 in March and №Frost-0047/21 on March 15, 2021.

On September 20, 2021, a budget application was submitted to the regional Department of Construction, Architecture and Urban Planning, according to protocol No. 7 of the meeting of the budget commission dated April 19, 2022 on the amount of spending limits for administrators of regional budget programs for 2023-2025, funds will be allocated and construction work will be carried out between 2023 and 2025.

The cost of the project is - (construction of a gravel road) (100 hectares) – 877 575,8 thousand tenge and (construction of a gravel road) (35 hectares) – 257 616,1 thousand tenge.

According to the project "power supply of the settlements of Aidarly, Amankeldy, Zhetikol, Kogalykol of the Syrdarya district of the Kyzylorda region", a budget application for 2023-2025 has been submitted to the Regional Department of Construction, Architecture and Urban Planning to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan through the regional Department of Construction, Architecture and Urban Planning.


Completed works in the field of construction, architecture and urban planning for the I quarter of 2022

Through the Department of construction, architecture and urban planning of the Syrdarya district, the following reports on the work carried out in January-March 2022.

  1. Design and estimate documentation was developed for the construction of reinforced concrete fences on the territory of the border post "Tushchykuduk" of Syrdarya District of Kyzylorda region, through the NGO" Munaygazinzhiniring "LLP, and a positive conclusion of the expert examination № As-0075/22 was obtained through AIM company LLP on February 24 year 2022. On March 30 year 2022, a budget application was submitted to the Regional Department of construction, architecture and urban planning for 2022 by letter №06-2/237.
  2. At the expense of sponsorship" for the construction of a school for 250 places in the village of Terenozek, Syrdarya district", design and estimate documentation was developed in 2021 through the NGO" Munaygas Engineering "LLP, and a positive conclusion of the expert examination № EI-0005/22 was obtained by expertise engineering LLP on March 24 year 2022. The estimated cost of the project is 1,454,521.3 thousand tenge. On March 30 year 2022, a budget application was submitted to the Department of Education of the Syrdarya District of the Department of Education of the Kyzylorda region for 2022 year by letter № 06-2 / 236.
  3. On January 28 year 2022, public procurement was announced through the District Department of public procurement by means of an open competition" for the construction of a training and streetball field on the site of Building No. 3A Amankeldy street of the KSU specialized children's and youth School of the Olympic reserve of Syrdarya District No. 11", and on March 17 year 2022, a contract was signed with the winning contractor" pulse " LLP №13. Currently, contract work is underway with the technical supervision institution.

         4."For the construction of a sports complex in Besaryk settlement of Syrdarya district" on January 24 year 2022, public procurement works were announced through the District Department of public procurement by means of an open tender, and on March 09 year 2022, a contract №12 was signed with the winning contractor organization" SCS Engineering " LLP.

On November 26 year 2021, 15,774.0 thousand tenge was allocated for the development of design and estimate documentation for the infrastructure (construction of gas distribution networks) (100 hectares) and (35 hectares) of a new microdistrict in the village of Terenozek, Syrdarya District of Kyzylorda region, public procurement was announced through the Department of public procurement by means of an open tender, and a contract was signed with the winning Institution "Project-Building Institute Kaz Nur" LLP. Currently, design and estimate documentation is being developed.

Also, in 2021 year, design and estimate documentation was developed for the infrastructure of the new microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region (construction of a gravel road) (100 ha) and (35 ha) through Dimash-Service LLP, through frost KZ LLP on March 19 year 2021 N Frost-0049/21 and on March 15 year 2021 № Frost-0047/21 positive conclusions were obtained.

The cost of the project is (construction of a gravel road) (100 ha) – 877,575.8 thousand tenge and (construction of a gravel road) (35 ha) - 257,616. 1 thousand tenge.

On September 20 year 2021, a budget application was sent to the Regional Department of construction, architecture and urban planning for 2022 years.

Public service provided in January-March 2022. In January-March 2022, 141 services were provided. Of these, 42 services were provided through the public service center. 99 were provided through the e-government web portal. On the development of an architectural and planning task: By Department for January-March 2022 "www.elicense.kz" 30 architectural and planning tasks have been developed through the portal. Of these, 31 are from state institutions, 1 is from oil companies, 29 are from individual entrepreneurs and legal entities. Address Register Information System: Through the public service center and the e-government web portal, certificates were issued for determining 42 addresses for January-march 2022 (39 for the e-government web portal). On issuing a permit for reconstruction works: For January - March 2022, the department received an application for reconstruction


Completed works in the field of construction, architecture and urban planning for the IV quarter of 2021

Construction within the framework of the «Nurly zher» state program:

  1. «Сonstruction of 3 three-room residential buildings in the settlements of Aidarli, Amankeldy, Besaryk, Akzharma A. Tokmaganbetov, Kalzhan-Akhun, Kogalykol, N. Ilyasov, Chagan, Shyrkeyli, S. Seifullin» with a total cost of 475181.0 thousand tenge. The contract amount is 409,470.5 thousand tenge for 2020, 1,000. 0 thousand tenge was allocated from the district budget and fully disbursed. As of September 01, 2021, 311,388.0 thousand.tenge has been disbursed.

In accordance with the decision of the Syrdarya district maslikhat No. 98 dated December 10, 2021, the remaining 97,179.0 thousand tenge of construction and installation works was allocated at the expense of the regional budget, which was fully disbursed in December.

The construction work was completed on December 28, 2021 and put into operation. Contractor: Namys-Kurylys LLP, Akmeshit-Meliorator LLP; designer: Syrstroyproektservice LLP, Technical Supervisor: Aybar-SH LLP.

  1. "Socially vulnerable segments of the population of Syrdarya district and (or) low-income families" Gaz kurylys Montazh Kazakhstan Company" LLP on September 29 of this year, 10 municipal housing units were purchased from the Republican budget – 84,000. 0 thousand tenge, from the regional budget – 8,400 thousand tenge and were provided to citizens of the category of large families in need of housing from the state housing fund on a priority basis. In accordance with the order of the district finance department No. 45 dated October 13, 2021, it was transferred to the balance sheet of the municipal institution" Office of the Akim of the village of Terenozek".
  2. «The amount of funds provided for the purchase of 40 municipal housing for socially vulnerable segments of the population and (or) low - income families of Syrdarya district»: from the Republican budget – 336,000. 0 thousand tenge, from the regional budget-32,000. 0 thousand tenge. In December 2021, 247,000.0 thousand tenge was disbursed, 26 housing units were purchased and put into operation.

Currently, a proposal is sent to the District Department of finance to transfer it to the balance sheet of the Akim's Office of the village of Terenozek.

  1. «Design and estimate documentation was developed for the 18-apartment residential building No. 7 and the 18-apartment residential building No». 8 in the residential quarter of Terenozek village of Syrdarya district through the LLP "Prikaspiyskoe management construction-Shymkent", and positive expert opinions were obtained through the LLP "Tech Group KZ" on August 11, 2021 No. TGKZ-0013/21 and No. tgkz-0014/2. On September 20, 2021, a budget application was submitted to the Regional Department of construction, architecture and urban planning for 2022.
  2. 15,712.7 thousand tenge was allocated for the design and estimate documentation of the infrastructure (construction of a gravel road) (100 ha) and (35 ha) of the New microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region. Design and estimate documentation was developed through Dimash-Service LLP, and positive expert opinions were obtained through Frost KZ LLP on March 19, 2021 No. Frost-0049/21 and on March 15, 2021 No. Frost-0047/21. On September 20, 2021, a budget application was sent to the Regional Department of construction, architecture and urban planning for 2022.
  3. Public procurement was carried out for the construction of a 130 kW solar power plant for the construction of a reinforced concrete fence on the territory of the border post "Tushchykuduk" of Syrdarya District of Kyzylorda region" and the border section "Tushchykuduk "of Syrdarya District of Kyzylorda region, design and estimate documentation was developed through the winner of the state enterprise" Munaygazinzhiniring "LLP.

On September 17, 2021, through the District Department of public procurement for conducting a comprehensive non-departmental examination of the project for the development of design and estimate documentation, public procurement works by means of an open tender were announced, and on November 25, 2021, the winning institutions were identified as "expertise PRO" LLP and "AIM Company" LLP. On November 30, 2021, a contract was signed with the winning institutions, and currently documents for a comprehensive non-departmental examination have been submitted.

  1. On July 30, 2021, the Regional Department of construction, architecture and urban planning submitted a budget application to the Regional Department of construction, architecture and urban planning for the amount of 2022" for the construction of 2 three-room residential buildings in Zhetykol settlement of Syrdarya District of Kyzylorda region".
  2. On September 20, 2021, a budget application was sent to the Regional Department of construction, architecture and urban planning for the Working Project" Preparation of 18-apartment residential building No. 5 and 18-apartment residential building No. 6 in the residential quarter of Terenozek village of Syrdarya District of Kyzylorda region".
  3. On December 03, 2021, the Regional Department of construction, architecture and urban planning sent working projects "construction of a sports complex in the village of Besaryk, Syrdarya district" and "construction of a training and streetball field for the construction of a specialized children's and youth School of the Olympic reserve of Syrdarya District No. 11 on amangeldy Street No. 3 a".
  4. «Infrastructure (construction of gas distribution networks) (100 hectares) and (35 hectares) of a new microdistrict in the village of Terenozek, Syrdarya District of Kyzylorda region» on November 26 of this year, public procurement was announced through an open tender through the Department of public procurement for the development of design and estimate documentation. Currently, a contract is concluded with the winning Institution "Project-Building Institute Kaz Nur" LLP. After the development of the contract, design and estimate documentation will be developed.

Completed works in the field of construction, architecture and urban planning for the III quarter of 2021

Work carried out through the Syrdarya District Department of construction, architecture and Urban Planning from January to September 2021

1.construction of 3 three-room residential buildings in the settlements of Aidarli, Amankeldy, Besaryk, Akzharma A. Tokmaganbetov, Kalzhan-Akhun, Kogalykol, N. Ilyasov, Chagan, Shyrsheyli, S. Seifullin with a total cost of 475181.0 thousand tenge. The contract amount is 409,470.5 thousand tenge for 2020, 1,000. 0 thousand tenge was allocated from the district budget and fully disbursed. For 2021, 311,388.0 thousand tenge were allocated under the Nurly zher program.the tenge was fully disbursed by September 01.

Contractor: Namys-Kurylys LLP, Akmeshit-Meliorator LLP;

Design institution: Syrstroyproektservice LLP,

Technical supervisor: Aybar-SH LLP.

2.design and estimate documentation was developed for the 18-apartment residential building No. 7 and the 18-apartment residential building No. 8 in the residential quarter of Terenozek village of Syrdarya district through the LLP "Prikaspiyskoe management construction-Shymkent", and positive expert opinions were obtained through the LLP "Tech Group KZ" on August 11, 2021 No. TGKZ-0013/21 and No. tgkz-0014/2. On September 20, 2021, a budget application was submitted to the Regional Department of construction, architecture and urban planning for 2022.

3.15,712. 7 thousand tenge was allocated for the design and estimate documentation of the infrastructure (construction of a gravel road) (100 ha) and (35 ha) of the New microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region. Design and estimate documentation was developed through Dimash-Service LLP, and positive expert opinions were obtained through Frost KZ LLP on March 19, 2021 No. Frost-0049/21 and on March 15, 2021 No. Frost-0047/21. On September 20, 2021, a budget application was submitted to the Regional Department of construction, architecture and urban planning for 2022.

4.public procurement was carried out for the construction of a 130 kW solar power plant for the construction of a reinforced concrete fence on the territory of the border post "Tushchykuduk" of Syrdarya District of Kyzylorda region" and the border section "Tushchykuduk "of Syrdarya District of Kyzylorda region, design and estimate documentation was developed through the winner of the state enterprise" Munaygazinzhiniring "LLP.

On September 17, 2021, public procurement works by means of an open tender were announced through the District Department of Public Procurement.

5.on July 30, 2021, a budget application was sent to the Regional Department of construction, architecture and urban planning" for the construction of 2 three-room residential buildings in Zhetykol settlement of Syrdarya District of Kyzylorda region".

6.on September 20, 2021, a budget application was sent to the Regional Department of construction, architecture and urban planning for the Working Project" Preparation of 18-apartment residential building No. 5 and 18-apartment residential building No. 6 in the residential quarter of Terenozek village of Syrdarya District of Kyzylorda region".

7.on September 07, 2021, an application was sent to the akimat of Terenozek village for the transfer of the right of temporary gratuitous land use for the construction of a 300-seat School on B. Momyshuly Street in Terenozek village, Syrdarya district.

"Currently, the registration of the land plot has been sent to Terenozek production unit of "" Aral "" branch of RSE "" Kazvushar"", Syrdarya ZHTU, Kyzylorda power distribution networks company for the development of technical specifications and approval of the Department of land relations and Syrdarya District Branch for registration and land cadastre of the branch of the state corporation ""government for citizens "" in Kyzylorda region."

8.documents for 10 houses have been developed and a letter has been sent to the district finance department for submission to the balance sheet on the form" attached residential buildings purchased for low-income families in the village of Terenozek, Syrdarya district".

9.design and survey works and technical specifications are required for financial requests for infrastructure (construction of gas distribution networks) (100 ha) and design and estimate documentation (35 ha) of a new microdistrict in Terenozek village, Syrdarya district, Kyzylorda region.

To date, technical specifications and design surveys have been developed for the land plot (35 hectares).

On September 24, 2021, the relevant documents for the development of a technical contract were sent to the State Utility Enterprise on the right of economic management "Kyzylorda Gas Distribution System" (100 hectares).

After the documents are fully developed, a budget application for the development of design and estimate documentation will be sent to the District Department of economy and planning.


Completed works in the field of construction, architecture and urban planning for the II quarter of 2021

  1. The total cost of construction of 3 three-room residential buildings in the settlements of Aidarli, Amankeldy, Besaryk, Tokmaganbetov A., Kalzhan Akhun, Kogalykol, Ilyasov N., Chagan, Shyrsheyli, Seifullin S. is 425.2 thousand tenge. For 2020, 1,000.0 thousand tenge was allocated from the district budget and fully disbursed. For 2021, 311 388 thousand tenge were allocated under the Nurly zher program.tenge. As of July 1, 2021, 108,440 thousand. tenge has been disbursed.

Contractor organization: Namys-Kurylys LLP, Akmeshit-Meliorator LLP

Design institution: Syrstroyproektservice LLP,

Technical supervisor: Aybar-SH LLP.

  1. Design and estimate documentation is being developed for 18-apartment residential building No. 7 and 18-apartment residential building No. 8 in the residential quarter of Terenozek village of Syrdarya district through the LLP "Caspian Management of construction-Shymkent". After the design and estimate documentation is developed, a positive opinion will be sent for examination.
  2. 3. 15,712. 7 thousand tenge was allocated for the design and estimate documentation of the infrastructure (construction of a gravel road) (100 ha) and (35 ha) of the New microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region. Design and estimate documentation was developed through Dimash-Service LLP, and positive expert opinions were obtained through Frost KZ LLP on March 19, 2021 No. Frost-0049/21 and on March 15, 2021 No. Frost-0047/21. Currently, a budget application has been sent to the Regional Department of construction, architecture and urban planning.
  3. 4. Public procurement has been announced for the works "development of design and estimate documentation for the construction of reinforced concrete fences on the territory of the border post" Tushchykuduk" of Syrdarya District of Kyzylorda region "and "development of design and estimate documentation for the construction of a solar power plant with a capacity of 130 kW for the border Department" Tushchykuduk" of Syrdarya District of Kyzylorda region".

Completed works in the field of construction, architecture and urban planning for the I quarter of 2021

«Construction of an 18-apartment residential building №1 and an 18-apartment residential building № 2 with a 6-apartment insert in the residential quarter of the village. Terenozek of Syrdarya district of Kyzylorda region»

For 2020, the project for the construction of 18 – apartment residential building No. 1 and 18-apartment residential building No. 2 in the residential quarter of Terenozek village of Syrdarya District of OB-466195.0 thousand."I don't know," he said. The total area of the house is 2593.61 square meters. The contractor is Nurtalap and K LLP. The designer is" Kyzylorda project construction " LLP. Technical supervisor of Kyzylorda Nurstroy Engineering LLP. A total of 116 people were employed under the project, including 58 people under the employment roadmap program through the employment center. The facility was put into operation in December 2020.

"Reconstruction and expansion of the water supply system with the construction of a supply line for residential buildings in the locality of Zhetikol, Syrdarya district, Kyzylorda region»

In the village of zhetykol, within the framework of the employment roadmap program for 2020, the supply of drinking water to the OB – 144524.0 thousand tons."I don't know," he said. The contractor is Alem-Kurylys Corporation LLP. Designer-Tabys-project LLP. Technical supervisor-Kyzylorda Nurstroy Engineering LLP. In total, 36 people were employed under the project, including 50% of the total number of employees through the employment department, i.e.  18 people. The facility was put into operation in December 2020.

«Reconstruction of the ground floor for the gym of Secondary school № 135 in Tokmagambetov village under the Syrdarya District Department of Education of the Kyzylorda region»

In A. Tokmaganbetov rural district, the project for the reconstruction of the basement of Secondary School No. 135 with the transformation of a gym for 2020 within the framework of the employment roadmap program is planned to carry out reconstruction of OB – 41054.0 thousand."I don't know," he said. The contractor is Kymbat and K LLP. The designer is Shynar project LLP. Technical supervisor-Kyzylorda Nurstroy Engineering LLP. A total of 16 people were employed under the project, including 8 people under the program through the employment center. At the moment, the inter-room walls are braided and water and sewer pipes are carried out. The facility was put into operation in September 2020.

Infrastructure (construction of water supply) of a new microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region (100 ha)

For 2020, funds were allocated from the Republican (RB-309636.0) and regional (OB - 39960.0) budgets for the construction of engineering infrastructure (drinking water) on an area of 100.0 hectares. Estimated cost of the project:  399595,51 thousand. tenge. The contractor is "Diker" LLP. The designer is Dimash Service LLP. Technical supervisor-Kyzylorda Nurstroy Engineering LLP. Construction and installation work began in July 2020. To date, 208 sight wells have been installed and 16.0 km of water supply has been laid. According to the plan, the construction works were supposed to be completed and put into operation on December 24, but due to improper performance of their duties by the contractor, the works were not completed. As of January 1, 2021, 257288.5 thousand. tenge has been disbursed.

Infrastructure (construction of water supply) of a new microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region (35 ha)

For 2020, funds were allocated from the Republican (RB-112722.0) and regional (OB - 12525.0) budgets for the construction of engineering infrastructure (drinking water) on an area of 35.0 hectares. Estimated cost of the project: 125247,31 thousand. tenge. The contractor is "Diker" LLP. The designer is Dimash Service LLP. Technical supervisor-Danstroyproekt LLP. Construction and installation work began in June 2020. Construction work was completed in December and put into operation. The funds allocated for 2020 have been fully disbursed.


Completed works in the field of construction, architecture and urban development for the IV quarter of 2020

"Construction of 18-apartment residential building № 1 and 18-apartment residential building № 2 with a 6-apartment insert in the residential quarter of Terenozek village, Syrdarya district, Kyzylorda region». 

For the construction of 18 – apartment residential building № 1 and 18-apartment residential building № 2 in the residential quarter of Terenozek village of Syrdarya district for 2020 from the regional budget - 466195.0 thousand. The total area of the house is 2593.61 square meters. Contractor organization LLP «Nurtalap and K». Designer of LLP "Kyzylorda project construction". Technical supervisor of LLP «Kyzylorda Nurstroy Engineering». A total of 116 people were employed under the project, including 58 people under the employment roadmap program through the employment center. The facility was put into operation in December 2020.

Construction of drinking water in Zhetykol settlement. 

Within the framework of the employment roadmap program, 144524.0 thousand tenge was allocated for drinking water supply in zhetykol settlement for 2020. The contractor is LLP «Alem-Kurylys Corporation». Designer - LLP «Tabys-project». Technical supervisor - LLP «Kyzylorda Nurstroy Engineering». In total, 36 people were employed under the project, including 50% of the total number of employees through the employment department, that is, 18 people were employed. The facility was put into operation in November 2020.

Reconstruction of the basement of Secondary School № 135, turning it into a gym. 

For the reconstruction of the basement of Secondary School No. 135 in Tokmaganbet rural district for 2020 within the framework of the employment roadmap program – 41054.0 thousand tenge from the regional budget. The contractor is LLP «Kymbat and K». The designer is LLP «Shynar project». Technical supervisor - LLP «Kyzylorda Nurstroy Engineering». A total of 16 people were employed under the project, including 8 people under the program through the employment center. The facility was put into operation in September 2020.

According to the Working Project" Infrastructure (drinking water) networks of a new microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region " (35 hectares). 

For  2020, 112722.0 thousand tenge was allocated from the Republican budget and 12525.0 thousand tenge from the regional budget for the construction of engineering infrastructure (drinking water) on an area of 35.0 hectares. Estimated cost of the project: 125247,31 thousand. tenge. The contractor is «Daneker» LLP. The designer is «Dimash Service» LLP. Technical supervisor-«Danstroyproekt» LLP. Construction and installation work began in June 2020. Construction work was completed in December and put into operation. The funds allocated for 2020 have been fully disbursed.

According to the Working Project" Infrastructure (drinking water) networks of a new microdistrict in the village of Terenozek, Syrdarya district, Kyzylorda region " (100 hectares). 

For 2020, funds were allocated from the Republican budget in the amount of 309636.0 thousand tenge and the regional budget in the amount of 39960.0 thousand tenge for the construction of engineering infrastructure (drinking water) on an area of 100.0 hectares. Estimated cost of the project - 399595,51 thousand. tenge. The contractor is «Daneker» LLP. The designer is «Dimash Service» LLP. Technical supervisor «Kyzylorda Nurstroy Engineering» LLP. Construction and installation work began in July 2020. To date, 208 sight wells have been installed and 16.0 km of water supply has been laid. According to the plan, the construction works were supposed to be completed and put into operation on December 24, but due to improper performance of their duties by the contractor, the works were not completed. As of January 1, 2021, 257288.5 thousand. tenge has been disbursed.


Completed works in the field of construction, architecture and urban development for the THIRD quarter of 2020

For public services:

The Department provides 5 public services. In the third quarter of this year, 298 services were rendered. Of these, 129 services were provided through the citizens ' service Center. 169 submitted via the e-government web portal.

Work on the development of an architectural and planning task:

In January-September, the Department developed 52 architectural and planning tasks. Of these, 9 are from state institutions, 31 are from oil companies,and 12 are from individual entrepreneurs and legal entities.

According to the Address register information system» :

In January - September of this year, 237 certificates of address clarification were issued through public service Centers.

Upon approval of the draft design:

In January-September, 13 preliminary designs were approved.

Delivery of permission to installation of objects of outdoor (visual) advertising:

In January-September, the district issued a permit to place an object of outdoor (visual) advertising (banner) in the village of Terenozek, along Aliakbarov street in the village of Terenozek. to the Kyzylorda branch of the limited liability company " KMF "(KMF) and in the village of Terenozek on K. Kazantayev street to the outdoor (visual) advertising of "Orda-Lux"LLP. (banner).

By registration of the act of acceptance into operation:

In January-September of this year, 60 acts of acceptance for operation of non-residential facilities were registered.

For commissioned individual residential buildings in the district:

To date, the number of individual residential buildings commissioned in January - September (for the third quarter) is 11359.4 square meters. Compared to the previous year, it was completed by 100.1%.

Infrastructure (water supply) of a new microdistrict in the village of Terenozek in the Syrdarya district of the Kyzylorda region" (100 ha).

For 2020, funds were allocated from the Republican (RB-309636.0) and regional (OB - 39960.0) budgets for summing up the engineering infrastructure of the territory on 100.0 hectares (water supply). Estimated cost of the project: 399595.51 thousand tenge. Contractor LLP "Daneker". The designer is Dimash Service LLP. Technical supervision-LLP "Kyzylorda Morstroy engineering".Construction and installation work began in July 2020. Currently, 10 people and two technicians work on the construction site. Work is underway to install 15.0 km of water supply and observation wells. According to the plan, construction work will be completed in December. As of October 1 of this year, 103945.0 thousand tenge was disbursed.

Infrastructure (water supply) of a new microdistrict in the village of Terenozek in the Syrdarya district of the Kyzylorda region" (35 ha).

For 2020, funds were allocated from the Republican (RB-112722.0) and regional (OB - 12525.0) budgets for the construction of engineering infrastructure (drinking water) on 35.0 hectares of territory. Estimated cost of the project: 125247.31 thousand tenge. Contractor LLP "Daneker". The designer is Dimash Service LLP. Technical supervision-LLP "Dorstroiproekt". Construction and installation work started in June 2020. Currently, 5.2 km of land has been excavated and water pipelines have been laid. Water supply inspection wells are installed. Construction work will be completed in October. As of October 1, 2020, 76852.1 thousand. tenge fully mastered.


Completed works in the field of construction, architecture and urban development for the SECOND quarter of 2020

Construction of 18-apartment residential building No. 1 and 18-apartment residential building No. 2 in the residential quarter of the village of Terenozek, Syrdarya district. By 2020, OB – 466195.0 thousand tenge for the project of construction of 18-apartment residential building No. 1 and 18-apartment residential building No. 2 in the residential quarter of the village of Terenozek, Syrdarya district.tenge. The total area is 2461.44 square meters. Contractor LLP "Murtlap To". The designer of LLP "Kyzylorda Robastnoe". Technical supervision of LLP "Kyzylorda Morstroy engineering". As part of the employment Roadmap program, 58 people will be employed through the employment center. Currently, work is underway to lay the Foundation of the house. The number of employees for the project is 116 people. According to the program, it is planned to employ 58 people by 50% through the employment Department. Currently, 20 people work through the employment Department. In the future, brickwork will gradually accept employees. The construction period is 7 months. It will be put into operation on December 15 this year.

Construction of potable water in the locality of Reticoli.In the village of zhetikol, 144524.0 thousand tenge was allocated for drinking water under the" employment Roadmap 2020 " program.tenge. Contractor Alem-Kurylys Corporation LLP. Designer-too "Tabys-it's". Technical supervision-LLP "Kyzylorda Morstroy engineering". To date, the employment Department has employed 50% of the total number of employees-18 people. In total, there are 13 streets in the locality, of which 10 streets have been worked on to date. In accordance with the approved work schedule, the relevant work is being carried out. According to the plan, construction work will be completed and put into operation in November.

Exercises in the basement of secondary school No. 135 reconstruction with transformation into a hall.
For the reconstruction of the basement of secondary school No. 135 in Tokmaganbetova Village within the framework of the "employment Roadmap 2020" program-41054.0 thousand tenge.tenge. Contractor "Kymbat & K" LLP. The designer is Shynar Project LLP. Technical supervision-LLP "Kyzylorda Morstroy engineering". As part of the program, 8 people were employed through the employment center. Currently, the basement floors are filled with concrete. Water and sewer pipes are laid in the necessary interior walls. The deadline for completion of construction works is 3.09.2020.

 

Документы
Новости
Полезные материалы
Completed works in the field of construction, architecture and urban development
Медиагалерея
События
Реализуемые проекты
Услуги
Организации
Часто задаваемые вопросы

Социальные медиа

Сырдарией Ауданының Әкімдігі

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты