Лого

Меню

Страницы

Статья

INFORMATION about the progress of execution State Program " Industrial and innovative development of the Republic of Kazakhstan»

INFORMATION about the progress of execution

State Program " Industrial and innovative development of the Republic of Kazakhstan»

To date 12 projects on the industrialization map in the amount of 68,1  billion tenge are being implemented in the city of Kyzylorda.

«Construction of a plant for the production and processing of flat glass with a capacity of 197.1 thousand tons per year» by LLP «Orda Glass LTD». Since December last year, the commissioning of the plant has started (the project cost is 42 billion tenge, 226 jobs will be opened).

«Organization of production of technical conversion of molybdenum dioxide powder into trioxide, with a capacity of 500 tons per year» LLP «Trimo». Pilot tests of the technology were carried out. According to the results of the last test, it was decided to refine the technology, as well as to change some stages of the technological scheme. In this regard, the initiator of the project postponed the launch of the plant (the project cost is 1 billion tenge, 58 jobs will be opened).

«Production and storage of meat and meat products» LLP «Syr-Marzhany». The construction work of the project continues. It is planned to build an administrative building and an observation post. The PSD of external engineering networks (water, gas, electric grid) has passed the state examination. Within the framework of the Business Roadmap 2020 program, 49.5 million tenge was allocated from the budget in 2019-2020, construction works were completed (contractor –«Asanasdar» LLP). In addition, 13.8 million tenge will be allocated for laying power grids in 2021. The plant's PSD underwent a repeated state examination and received a positive conclusion on February 24. The project is being implemented jointly with JSC "SEC Baikonur". The share of LLP "Cheese Marzhany -51%, JSC "SEC Baikonur" - 49%. As a result, on September 23, 2020, the Meat Processing Complex "Syr Marzhany" LLP was created. To date, construction work has been completed by 50%.In October, it is planned to supply equipment and installation work (the project cost is 1.2 billion tenge, 70 new jobs will be opened).

«Production of motor fuels of ecological class K4, K5» LLP «Kyzylorda Refinery». In February 2019, 333 hectares of land were allocated in the city of Kyzylorda as state support. Technical conditions for electricity consumption, gas supply, telecommunication networks have been obtained. In accordance with the agreement between PSF Kazneftetrans LLP a feasibility study has been developed with the company "Shanghai HOTO Engineering Inc" LLP "Kyzylorda Refinery" and a contract has been signed for passing the state examination (No. 01-03/02390 dated 26.03.2019). To date, in order to carry out the external engineering infrastructure of the project, the feasibility study is being developed at the expense of the project initiator's own funds (the project cost is 17.6 billion tenge, 220 new jobs will be opened).

 «Construction of a small rebar plant "KOMAZ" in the city of Kyzylorda» LLP «Poom Trade KZ». In November last year, 2 hectares of land were allocated from ONDIRIS as state support. To date, the work on the fencing of the land has been completed. An administrative and security checkpoint is under construction. A POI is being developed for the engineering infrastructure necessary for the project. To date, documents for the supply of water supply and sewerage networks within the framework of the "DKB-2025" program have been sent to the regional Department of entrepreneurship and tourism (the project cost is 250 million tenge. 30 new jobs will be opened).

«Production of dry building mixes» LLP «VEGA-PROM». A land plot of 2.9 hectares has been allocated in the village of Belkol. Currently, work is underway to level the land. In addition, design and estimate documentation is being developed for summing up the engineering infrastructure (the project cost is 103 million tenge. 31 new jobs will be created).

«Hippotherapy for special children opening of an equestrian health club and construction of a workshop for processing mare's milk» LLP «Aigasar». As a measure of state support for the project, a land plot of 10 hectares was provided. To date, 90% of the land leveling, fencing and construction of the stable have been completed. The construction of the arena begins. 8 people work(the project cost is 30 million tenge. 15 new jobs will be opened).

«Shop for processing camel wool and production of matte blankets» LLP «Orda Techs». Currently, the initiator of the project is working on the registration of a land plot in the Ondiris project (the project cost is 100 million tenge. 18 new jobs will be opened).

«Plant for the production of fiberglass and composite materials» LLP «Kyzylorda composittik materialdar zauyty». As a measure of state support, a land plot of 15 hectares in the industrial zone "Ondiris" was provided. To date, the design and estimate documentation for the supply of engineering infrastructure has been developed and submitted for state examination (the project cost is 1.8 billion tenge. 100 new jobs will be created).

«Mirror production plant» LLP «Dana Quartz». As a measure of state support for the project, it was decided to provide a land plot of 5 hectares in the industrial zone "Ondiris". Currently, work is underway on the registration of land. It is planned to develop a PSD project. (the project cost is 4,5 billion tenge, the place of work of 135 people).

«Construction of the poultry farm» KH «Kausar». At the moment, the initiator of the project is working on the registration of an additional land plot(the project cost is 100 million tenge, the place of work of 6 people).

"Construction of an asphalt concrete plant in Kyzylorda" Nur Orda Zholy LLP. It was decided to provide a land plot with an area of 4 hectares as a measure of state support on the territory of the "Southern" industrial zone and the village of Belkol. Currently, work is underway on the registration of land. (the cost of the project is 87 million tenge, the place of work of 135 people).

Дата публикации
11 октября 2021
Дата обновления
07 июля 2022
Тип
Information

Сейчас читают

UAPF
04 февраля 2026
ЕНПФ информирует о планируемом расторжении договора о доверительном управлении пенсионными активами с АО «Halyk Global Markets»
15 января 2026
Report on Cultural Activities in 2025
14 января 2026
On the Work Carried Out in the Field of Youth Policy in 2025

Социальные медиа

Акимат города Кызылорда
Акимат города Кызылорда
Акимат города Кызылорда
Акимат города Кызылорда
Акимат города Кызылорда

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты