
Within the framework of the housing construction program, 7,253.8 million tenge was allocated.The planwas considered in the amount of 1,393. 4 million tenge and started in 2023 in the Left Bank of the Syrdarya River in microdistrict No. 3on the 7th floorConstruction of 6 residential buildings with 84 apartments will be completed.In microdistrict No. 2, 2,762.5 million tenge was allocated for the start of construction of 10 residential buildings with 40 apartments of 5 floors.Within the framework of the program" development of engineering infrastructure"6,425.3 million tenge was considered, the plan was 3,650. 2 million tenge disbursed.Kyzylorda, Arai microdistrictEngineeringinfrastructureof the private housing sector on maueli Street27.9 million tenge 0.623 km will be allocated for the construction of a drinking water network.186.0 million tenge was allocated from the National Fund for the construction of gas supply and water supply networks for residential buildings in the Baiterek microdistrict.The cost of the project on the basis of the contract is 427.5 million tenge.With the allocation of 247.3 million tenge from RB to complete the project, 18.5 km of drinking water and gas systems will be completed by 9.995 km.41.4 million tenge was allocated for the construction of power supply to Zhas Alash and Terekty, Sarysu streets, and 1,764 km of power lines were laid.1.3 km of drinking water was allocated for the supply of drinking water to sarysu street.4.4 km of electric networks worth 76.0 million tenge were carried out for the electric networks of Zheruyik, Saryarka, Birlik streets in the village of belkol.At the expense of the National Fund, it is planned to allocate 1,152.4 million tenge for the completion of the project for the construction of a Highway (35 streets) in the area of 1,2,3 on the territory of kyzylzharma and lay 38.25 km of stone.Construction of engineering infrastructure of residential quarter No. 5 on the Left Bank of the Syrdarya River.Master plan andtelephonelinesfrom the Ob for 704.7 million tenge, construction of a 7-storey 84-apartment residential building on the Left Bank of the Syrdarya River.269.0 million tenge for the master plan and telephone system from the OB, 300.4 million tenge for the construction of the master plan and telephone network of 10 residential buildings of 5 floors located in the microdistrict No. 2 on the Left Bank of the Syrdarya river, work on the improvement of the territory of the airport "Korkyt Ata" (structures for rainwater treatment.ExternalSewerageand lighting networks). 1,354.9 million tenge was allocated for the correctional project, 634.1 million tenge was allocated for the improvement of the adjacent territory of the airport, 41.9 million tenge was allocated for the improvement.Construction of 66 12-storey residential buildings (4 houses) with commercial premises in the Left Bank part of the Syrdarya River.114.3 million tenge was allocated for the construction of power supply.329.9 million tenge was allocated from the city budget.1,380.3 million tenge was allocated for the reconstruction of dilapidated drinking and sewage networks in the city.(NC892.4 million tenge, OB – 163.3 million tenge, from the city budget-324.7 million tenge).Within the framework of the program" development of the gas transportation system", 500.0 thousand tenge was allocated for the start of work on the development of the project estimate documentation for the construction of a gas pipeline and intra-quarter gas distribution networks in 3 settlements of Kyzylozek rural district, 2.5 million tenge for the examination of the project for laying a gas system in the sabalak settlement and the start of construction work.Within the framework of the" auyl-El besigi " program, 261.2 million tenge was allocated from the Republican budget for the start of power distribution works in the villages of Aksuat, Dosan settlement in Kosshynyrau rural district, Kyzylzharma, Karaozek village in Kyzylozek rural district, karaozek station, Ainakol.12,848.0 million tenge was allocated for the purchase of 1,019 apartments for citizens with many children and vulnerable groups on the waiting list, 1,672. 7 million tenge was allocated from the central bank for the purchase of 135 apartments for citizens living in emergency housing, and 10.5 million tenge was allocated from the city budget for the purchase of an apartment for Olympic bronze medalist Konkabay.To date, 79 apartments have been purchased for the vulnerable group.