On the work carried out by the Communal State Institution “Kyzylorda City Department of Housing and Communal Services, Passenger Transport and Automobile Roads” of the Akimat of the city of Kyzylorda for 2025

1) 20.3 billion tenge has been allocated to the road transport infrastructure, 18.6 billion tenge has been disbursed. In particular, the construction of roads on 27 streets has been underway since the beginning of the year, and work is planned on the construction of 3 bridges. Currently, the construction of 27 streets and 3 bridges has been completed. In addition, the contractor for the maintenance of the streets of the city is Alem Trans Zhol LLP. Work has been carried out on the full-fledged asphalting of 35 streets and the restoration of the destroyed asphalt layers of the streets of the city.

1.1) 547.3 million tenge has been fully spent on work to ensure road safety.

1.2) Maintenance and reimbursement of lighting costs — 1.1 billion rubles. At the end of the year, it was fully mastered.

2) 33.7 billion tenge was spent on landscaping, 20.9 billion tenge was spent.
23.4 billion tenge has been allocated from the regional and city budgets for the reconstruction of the Park of the First President in the city of Kyzylorda. Work has been carried out through Alem Qurylys AQ LLP, and 22.6 billion tenge has been disbursed to date.
6.5 billion tenge has been allocated from the regional and city budgets for the reconstruction of the amusement park in Kyzylorda, and work has been carried out through Alem Qurylys AQ LLP, which has now amounted to 6.3 billion tenge. The facility is fully completed.
1.1 billion tenge has been allocated from the regional and city budgets for the improvement of the Korkyt Ata Park in the city of Kyzylorda. Work has been carried out through Astana-Service LLP; to date, the funds have been fully disbursed, and the facility has been handed over for reception.

720.7 million tenge was allocated from the regional and city budgets in 2024 for the improvement of multi-storey buildings in the city of Kyzylorda; 315.3 million tenge was considered in 2025. The work was carried out and fully completed through Azamat Kurylys LLP. The saved funds amount to 96.1 million tenge.

1.3 billion tenge has been allocated from the city budget for the overhaul of courtyards of multi-storey residential buildings in the city of Kyzylorda. Work has been carried out through the RSE “Enbek”, and 1.2 billion tenge has been disbursed to date. The necessary funds amounted to 73.2 million tenge (18 playgrounds).

702.4 million tenge was allocated from the city budget for the maintenance and servicing of communal facilities in the city of Kyzylorda. 657.8 million tenge was disbursed, and annual work with the contractor Real Stroy Snab LLP was fully completed.

3) Within the framework of the “Budget with the participation of the population” project, 344.3 million tenge was considered and 15 projects were implemented. 2.5 million tenge was saved.

4) In order to decorate the city of Kyzylorda, 101.8 million tenge was considered for the installation of LED lamps and LED screens. Work with Real Stroy Snab LLP was fully completed.

5) 119.7 million tenge was allocated for the installation of containers for solid household waste in the amount of 75 units in the city of Kyzylorda. The work of Zelenstroy LLP was fully completed.

6) Funds in the amount of 100.0 million tenge were considered for work on fencing lawns and graves under the bridge at the airport in Kyzylorda. The work has been fully completed.

7) For lining work with linear panels:
In 2025, 1.3 billion tenge was allocated for paneling 20 residential buildings
(Contractor: RSE “Enbek”, technical supervision: Kyzylorda Technical Supervision LLP, designer: KZO Project LLP).

To date, the facades of 17 residential buildings have been lined, and construction and installation work has been completed. Due to the return of funds to the budget for the remaining 3 residential buildings, construction work will be completed this year.

For information:

  1. Abai Avenue No. 32

  2. Abai Avenue No. 30

  3. Abai Avenue No. 34a

8) For hot water management: 10.2 billion tenge for 176 houses of the current year. Contractors have been identified (Customer: Department of Housing and Communal Services, Passenger Transport and Highways; contractors: Asanas-Dar LLP, Bak-Bereke 2030 LLP). Contracts have been concluded with contractors.

The amount of contracts is 9,776.0 million tenge (9,775,989 thousand tenge). To date, only 2,781.3 million tenge (2,781,271.3 thousand tenge) of advance payment has been allocated to contractors. In addition, 95% of the funds in the amount of 9,287.2 million tenge have been disbursed.

In connection with the equipment considered in the project, Danfoss signed agreements with Asanas-Dar LLP on October 28 and with Bak-Bereke 2030 LLP on November 10, and an advance payment was made. According to the contracts, a set of 243 ITP units and pumping units was ordered and accepted upon readiness.

For information:

  1. Asanas-Dar LLP — under contract No. 190140008898/250195/00. There are 116 residential buildings in Lot No. 7:
    – 53516747 Lot — 17 residential buildings
    – 53516748 Lot — 14 residential buildings
    – 53516749 Lot — 15 residential buildings
    – 53516750 Lot — 14 residential buildings
    – 53516751 Lot — 16 residential buildings
    – 53516752 Lot — 16 residential buildings
    – 53516753 Lot — 24 residential buildings

  2. Bak-Bereke 2030 LLP — under contract No. 190140008898/250196/00 for Lot No. 5 — 60 residential buildings:
    – 53516815 Lot — 10 residential buildings
    – 53516816 Lot — 13 residential buildings
    – 53516817 Lot — 4 residential buildings
    – 53516818 Lot — 12 residential buildings
    – 53516819 Lot — 21 residential buildings

9) On playgrounds and sports grounds:
This year, 1.3 billion tenge was allocated for the construction of modern children’s playgrounds and sports grounds in 18 courtyards of the city. 1.2 billion tenge was disbursed. The necessary funds amounted to 73.2 million tenge.

Construction work is currently underway at 5 locations.
(Contractor: RSE “Enbek”, technical supervision: Premium Tech Control LLP, designer: PSK Qabylet LLP).

For information:

  1. Tauelsizdik 1 — completed

  2. Tchaikovsky 6 — completed

  3. Beybarys 7a — completed

  4. Kazybek bi 12 — completed

  5. Kazybek bi 43, 45 — completed

  6. Shugila 2 — completed

  7. Shugila 32 — completed

  8. Shugila 22 — completed

  9. Aitbayeva 33 — finished

  10. Imanova 102 — lawn laying

  11. Akmeshit 20 — completed

  12. Arai 104, 106 — completed

  13. Yessimkhan (6 yards in total) — completed

  14. Zhappasbaibatyr (5 yards in total) — completed

  15. Zhappasbaibatyr 70 m — tartan laying works

  16. Beybarys 93a — grazing works, completed

  17. Bozygулov 2, 3, 8, 13 — inventory installation work

  18. Begimana 13 — construction and installation work

10) 4.7 billion tenge has been allocated for subsidizing public transport, and the funds have been fully disbursed.

On August 7, 2024, Kyzylorda Bus Park LLP was transferred to the trust management of KZO Qala Trans LLP for a period of 1 year without the right of subsequent purchase of state property. In 2025, on September 23, the contract was terminated.

In addition, a tender was announced for the transfer of state property to trust management without the right of subsequent redemption for a period of 5 years, and on October 31, 2025, an agreement was signed with BAZA CONSTRUCTION LLP.

At the same time, work will be carried out on the transfer of Kyzylorda Bus Park LLP to BAZA CONSTRUCTION LLP.

11) 2.4 billion tenge is provided for sanitary work; 1.9 billion tenge has been disbursed.
2.3 billion tenge has been allocated to ensure the sanitary cleanliness of the city of Kyzylorda, and 1.8 billion tenge has been disbursed to date.
87.4 million tenge has been considered for the neutralization of solid household waste in the city of Kyzylorda. To date, With You E&C Kyzylorda LLP has disbursed 37.5 million tenge.

12) 1.3 billion tenge has been allocated for the overhaul of roofs and facades of residential buildings; 650.0 million tenge has been disbursed.

Kyzylorda city: Tauelsizdik Avenue No. 1, Tokmaganbetov Street No. 27, Kunaev Street No. 26, Aiteke bi Street No. 20, Tole bi Street No. 47a, Abuova Street No. 8, Bukharbai Batyr Street No. 58, Bukharbai Batyr Street No. 54, Auelbekov Street No. 36, No. 39, No. 41 — 708.5 million tenge was allocated for facade overhaul. Work with RSE “Enbek” has been fully completed. Saved funds amounted to 148.9 million tenge.

For major repairs of facades on Abai Avenue No. 33, 32, 30, 34a, 28, Nazarbayev Avenue No. 1–4, 296.0 million tenge was allocated. Work has been fully completed. Saved funds amounted to 70.0 million tenge.

Current roof repairs of residential buildings in multiple locations were completed. A total of 252.5 million tenge was allocated from the city budget.

In addition, to begin work on restoring roofs at microdistricts No. 19, 20, 21, 30 in the Syrdarya district of Kyzylorda, 87.4 million tenge is required. 1.0 thousand tenge was allocated to start the work. To date, construction work has been fully completed.

13) For the project “Landscaping and Beautification of the Territory of the City of Kyzylorda” for a period of 5 years, the required amount is 18.6 billion tenge.

Within the framework of a public-private partnership, a contract was concluded with KazStroyCapital LLP. The project aims at systematic greening, increasing green spaces, and improving infrastructure.

The company employs 250 people and operates 50 units of modern equipment. To date, 46,100 willow saplings, 800,000 annual flowers, and 13,500 perennial flowers have been planted. Lawn coverage exceeds 10,000 square meters.

An automatic irrigation system based on Hunter technology has been introduced. More than 45 km of pipelines, 5,000 sprinklers, and 25 wells and pumping stations have been installed.

Additionally, 87,397.0 thousand tenge was allocated for solid waste disposal. 58,104.0 thousand tenge has been disbursed. Environmental permit No. KZ52VCZ14038556 was obtained. 45% of waste is reused. 35 people work at the landfill.

14) Progress of preparation for the 2025–2026 heating season.
Total heating networks — 217 km.
1,645 facilities are connected.

In 2025, 6 projects (8.7 km) are being implemented. As a result, wear has decreased from 42.3% to 40%.

15) 37,598.0 thousand tenge was allocated for current repairs of water supply networks. All works were completed by Zelenstroy LLP and Aliproekt Consulting LLC.

Дата публикации
13 января 2026
Дата обновления
13 января 2026
Тип

Сейчас читают

UAPF
04 февраля 2026
ЕНПФ информирует о планируемом расторжении договора о доверительном управлении пенсионными активами с АО «Halyk Global Markets»
15 января 2026
Report on Cultural Activities in 2025
14 января 2026
On the Work Carried Out in the Field of Youth Policy in 2025

Социальные медиа

Акимат города Кызылорда
Акимат города Кызылорда
Акимат города Кызылорда
Акимат города Кызылорда
Акимат города Кызылорда

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты