To date, 13 projects are being implemented in the city of Kyzylorda on the industrialization map in the amount of 68.4 billion tenge. With the full implementation of these projects, about 835 new jobs are expected to be created.
«Construction of a plant for the production and processing of flat glass with a capacity of 197.1 thousand tons per year» by LLP «Orda Glass LTD».Start-up and adjustment works of the plant started in December last year.
"Construction of an asphalt concrete plant in Kyzylorda" Nur Orda Zholy LLP. A decision was made to provide a land plot of 4 hectares as a measure of state support in the territory of the "Southern" industrial zone and the village of Belkol. The construction work of the project has been completed and the concrete plant was put into operation in June this year.
«Production of dry building mixes» LLP «VEGA-PROM». In the village of Belkol, a land plot of 2.9 hectares has been allocated. To date, 80 percent of the construction work has been completed, and the new workshop is operating.
«Organization of production of technical conversion of molybdenum dioxide powder into trioxide, with a capacity of 500 tons per year» LLP «Trimo». Due to the discrepancy between the equipment introduced into production and the technological process of the project, it is necessary to purchase other equipment with increased thermal and chemical resistance. Specialists from Russia are invited to design, manufacture, install and test this equipment.The project is under implementation.
«Production and storage of meat and meat products» The construction work of the project is ongoing. It is planned to build an administrative building and an observation post. Design and estimate documentation for external engineering networks (water, gas, electricity) has passed the state examination. As part of the "Business Roadmap - 2020" program in 2019-2020, 49.5 million tenge was allocated from the OB, construction work was completed. In addition, 13.8 million tenge will be allocated for the construction of electrical networks. Currently, construction work on the meat processing plant has been suspended due to financial problems.
«Production of motor fuels of ecological class K4, K5»LLP «Kyzylorda Refinery». c received technical specifications for permanent electricity and gas supply, laying of communication lines and a road connecting the highway "Western Europe - Western China". To date, in order to carry out the external engineering infrastructure of the project, the feasibility study is being developed at the expense of the project initiator's own funds
«Construction of a small rebar plant "KOMAZ" in the city of Kyzylorda» LLP «Poom Trade KZ».To date, the fencing of the project area has been completed. The construction work of the administrative and checkpoints has already begun. However, construction work on the project stopped due to financial problems.
«Shop for processing camel wool and production of matte blankets» LLP «Orda Techs».a decision was made to transfer 2.2 hectares of land from the Ondiris industrial zone to the project. At present, land preparation work has been completed. Due to the financial situation, the project initiator needs an investor.
«Plant for the production of fiberglass and composite materials» LLP «Kyzylorda composittik materialdar zauyty». As a measure of state support, a land plot of 15 hectares in the industrial zone "Ondiris" was provided. To date, design estimates for the supply of engineering infrastructure have been developed and submitted for state examination.
«Hippotherapy for special children opening of an equestrian health club and construction of a workshop for processing mare's milk» LLP «Aigasar».As a measure of state support, the project was provided with a land plot of 10 hectares. To date, land leveling, fencing and construction of stables have been completed. Currently, an order is being made for metal structures from the city of Aktobe for the construction of an arena (hangar). 8 people are working on the construction.
«Mirror production plant» LLP «Dana Quartz». As a measure of state support for the project, a decision was made to provide a land plot of 5 hectares in the Ondiris industrial zone. Land clearance work is currently underway. It is planned to develop a design and estimate documentation for the project.
«Construction of the poultry farm» KH «Kausar». A land plot of 1.3 hectares in the city of Kyzylorda has been prepared for the project. Financial issues are resolved.
The project of the individual entrepreneur B. Uzakov "production of wall and sidewalk materials", launched in 2015, was acquired by the individual entrepreneur Estaev Yerbolat Zholdasbekovich "Akseleu" in August last year (a mini-factory for the production of burnt ceramics). The cost of the project is 70 million tenge, the place of work is 7, the land plot is 5 hectares. Currently, the project is working on an ongoing basis.