Transport and roads

Reference for the first quarter of 2025

Road construction

 

As a result of the works carried out in 2024, the share of regional highways in good and satisfactory condition is 91 percent. The total length is 375 km, asphalt - 267.5 km, gravel - 73 km, soil - 34.5 km.

Major repair of the 3-kilometer regional road "Entrance to Zhankozha Batyr settlement".

"Kazaly-Kolarik-Bekaisan bi-Zhanakurylis" major repair of 6.5 kilometers of regional highway.

Major repairs of 4 streets, medium repairs of 11 streets in the village of Aiteke bi, Kazalinsky district

 

 


he share of regional highways is 88.2%.

Bozkol-Tasaryk, Bekayusan bi-Shemishkol 20 kilometers of regional highways are being renovated by Kazaly Zholshi LLP.

Aiteke bi village, Zhankozha Batyr and Aiteke bi streets are being renovated by "StroyModulAstana" LLP.

Aiteke bi village, Abilkayrkhan street is being seriously renovated by the contractor "Kazaly Zholshi".

The 10th street of Kazaly is being renovated by Bolashak LLP, the contractor under the mono-city development program.


Reference (for the II quarter of 2024)

Transport Infrastructure Development Program
1. Overhaul of the highway of regional significance km 45-76 "Kazaly-Kozhabaki-Bozkol-Kaukey" of the Kazalinsky district.
61.6 million tenge has been allocated for 2023. The length is 26 km . Contractor organization "Kyran" LLP. The repair of the road continues.
2. Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" 30-45 km of the Kazalinsky district.
411.9 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
3. Average repair of the highway of regional significance "Kozhabakhy-Bekarystan bi" 0-25 km of the Kazalinsky district.
635.2 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. A layer of asphalt has been laid on 10 km. The repair of the road continues.
4. Average repair of the highway of regional significance "Entrance to the village of Muratbayev" 0-5 km of the Kazalinsky district.
131.3 million tenge has been allocated for 2023. The length is 5 km . Contractor organization "Stroymodul Astana" LLP. Road repair works have been fully completed and put into operation.
5. Reconstruction of the highway of regional significance "Bozkol-Tasaryk" PK22+00-PK35+00 of the Kazalinsky district.
2.0 million tenge has been allocated for 2023. The length is 13 km . Contractor organization "Kazaly Zholshy" LLP.

The program "Auyl el besigi"
1. Average repair of Kazybek bi street in Kent Aitek bi Kazalinsky district.
32.2 million tenge has been allocated for 2023. The length is 1.5 km . Contractor organization "Daulet" LLP. A layer of gravel sand mixture (GPS) has been completely laid. The repair of the road continues.
2. Average repair of M.Auezov street in Kent Aitek bi Kazalinsky district.
23.3 million tenge has been allocated for 2023. Length 0.9 km. Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
3. Average repair of Altynsarin Street in Kent Aitek bi Kazalinsky district.
27.5 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Nuras and K" LLP. Road repair works have been fully completed and put into operation.
4. Average repair of V.Schastnov Street in Kent Aitek bi Kazalinsky district.
55.9 million tenge has been allocated for 2023. The length is 1.6 km . Contractor organization "Stroymodul Astana" LLP. Road repair works have been fully completed and put into operation.
5. Average repair of Asan kaigi street in Kent Aitek bi Kazalinsky district.
15.7 million tenge has been allocated for 2023. Length 0.5 km. Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
6. Average repair of Al-Farabi street in Kent Aitek bi Kazalinsky district.
14.6 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
7. Average repair of T.Aubakirov street in Kent Aitek bi Kazalinsky district.
32.4 million tenge has been allocated for 2023. The length is 0.7 km . Contractor organization "Nuras and K" LLP. Road repair works have been fully completed and put into operation.
8. Reconstruction of Zhankozha batyr Street and Ayteke bi in Kent Ayteke bi Kazalinsky district.
150.0 million tenge has been allocated for 2023. The length is 2.4 km . Contractor organization "Stroymodul Astana" LLP. Work is underway to level and expand the main layer of the street. The repair of the road continues.

The program "Implementation of budget investment projects in small and single-industry towns"
1. Reconstruction of the 15th street of the city of Kazalinsk, Kazalinsky district.
851.9 million tenge has been allocated for 2023. The length is 7.2 km . Contractor organization "Kyran" LLP. Gravel-sand mixture (GPS) and a layer of asphalt are laid on 6 streets. The repair of the road continues.


Reference (for the I quarter of 2024)

Transport Infrastructure Development Program
1. Overhaul of the highway of regional significance km 45-76 "Kazaly-Kozhabaki-Bozkol-Kaukey" of the Kazalinsky district.
61.6 million tenge has been allocated for 2023. The length is 26 km . Contractor organization "Kyran" LLP. The repair of the road continues.
2. Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" 30-45 km of the Kazalinsky district.
411.9 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
3. Average repair of the highway of regional significance "Kozhabakhy-Bekarystan bi" 0-25 km of the Kazalinsky district.
635.2 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. A layer of asphalt has been laid on 10 km. The repair of the road continues.
4. Average repair of the highway of regional significance "Entrance to the village of Muratbayev" 0-5 km of the Kazalinsky district.
131.3 million tenge has been allocated for 2023. The length is 5 km . Contractor organization "Stroymodul Astana" LLP. Road repair works have been fully completed and put into operation.
5. Reconstruction of the highway of regional significance "Bozkol-Tasaryk" PK22+00-PK35+00 of the Kazalinsky district.
2.0 million tenge has been allocated for 2023. The length is 13 km . Contractor organization "Kazaly Zholshy" LLP.

The program "Auyl el besigi"
1. Average repair of Kazybek bi street in Kent Aitek bi Kazalinsky district.
32.2 million tenge has been allocated for 2023. The length is 1.5 km . Contractor organization "Daulet" LLP. A layer of gravel sand mixture (GPS) has been completely laid. The repair of the road continues.
2. Average repair of M.Auezov street in Kent Aitek bi Kazalinsky district.
23.3 million tenge has been allocated for 2023. Length 0.9 km. Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
3. Average repair of Altynsarin Street in Kent Aitek bi Kazalinsky district.
27.5 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Nuras and K" LLP. Road repair works have been fully completed and put into operation.
4. Average repair of V.Schastnov Street in Kent Aitek bi Kazalinsky district.
55.9 million tenge has been allocated for 2023. The length is 1.6 km . Contractor organization "Stroymodul Astana" LLP. Road repair works have been fully completed and put into operation.
5. Average repair of Asan kaigi street in Kent Aitek bi Kazalinsky district.
15.7 million tenge has been allocated for 2023. Length 0.5 km. Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
6. Average repair of Al-Farabi street in Kent Aitek bi Kazalinsky district.
14.6 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
7. Average repair of T.Aubakirov street in Kent Aitek bi Kazalinsky district.
32.4 million tenge has been allocated for 2023. The length is 0.7 km . Contractor organization "Nuras and K" LLP. Road repair works have been fully completed and put into operation.
8. Reconstruction of Zhankozha batyr Street and Ayteke bi in Kent Ayteke bi Kazalinsky district.
150.0 million tenge has been allocated for 2023. The length is 2.4 km . Contractor organization "Stroymodul Astana" LLP. Work is underway to level and expand the main layer of the street. The repair of the road continues.

The program "Implementation of budget investment projects in small and single-industry towns"
1. Reconstruction of the 15th street of the city of Kazalinsk, Kazalinsky district.
851.9 million tenge has been allocated for 2023. The length is 7.2 km . Contractor organization "Kyran" LLP. Gravel-sand mixture (GPS) and a layer of asphalt are laid on 6 streets. The repair of the road continues.


Reference (for the third quarter of 2023)

Transport Infrastructure Development Program
1. Overhaul of the highway of regional significance km 45-76 "Kazaly-Kozhabaki-Bozkol-Kaukey" of the Kazalinsky district.
61.6 million tenge has been allocated for 2023. The length is 26 km . Contractor organization "Kyran" LLP. The repair of the road continues.
2. Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" 30-45 km of the Kazalinsky district.
411.9 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
3. Average repair of the highway of regional significance "Kozhabakhy-Bekarystan bi" 0-25 km of the Kazalinsky district.
635.2 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. A layer of asphalt has been laid on 10 km. The repair of the road continues.
4. Average repair of the highway of regional significance "Entrance to the village of Muratbayev" 0-5 km of the Kazalinsky district.
131.3 million tenge has been allocated for 2023. The length is 5 km . Contractor organization "Stroymodul Astana" LLP. Road repair works have been fully completed and put into operation.
5. Reconstruction of the highway of regional significance "Bozkol-Tasaryk" PK22+00-PK35+00 of the Kazalinsky district.
2.0 million tenge has been allocated for 2023. The length is 13 km . Contractor organization "Kazaly Zholshy" LLP.

The program "Auyl el besigi"
1. Average repair of Kazybek bi street in Kent Aitek bi Kazalinsky district.
32.2 million tenge has been allocated for 2023. The length is 1.5 km . Contractor organization "Daulet" LLP. A layer of gravel sand mixture (GPS) has been completely laid. The repair of the road continues.
2. Average repair of M.Auezov street in Kent Aitek bi Kazalinsky district.
23.3 million tenge has been allocated for 2023. Length 0.9 km. Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
3. Average repair of Altynsarin Street in Kent Aitek bi Kazalinsky district.
27.5 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Nuras and K" LLP. Road repair works have been fully completed and put into operation.
4. Average repair of V.Schastnov Street in Kent Aitek bi Kazalinsky district.
55.9 million tenge has been allocated for 2023. The length is 1.6 km . Contractor organization "Stroymodul Astana" LLP. Road repair works have been fully completed and put into operation.
5. Average repair of Asan kaigi street in Kent Aitek bi Kazalinsky district.
15.7 million tenge has been allocated for 2023. Length 0.5 km. Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
6. Average repair of Al-Farabi street in Kent Aitek bi Kazalinsky district.
14.6 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Kazaly Zholshy" LLP. Road repair works have been fully completed and put into operation.
7. Average repair of T.Aubakirov street in Kent Aitek bi Kazalinsky district.
32.4 million tenge has been allocated for 2023. The length is 0.7 km . Contractor organization "Nuras and K" LLP. Road repair works have been fully completed and put into operation.
8. Reconstruction of Zhankozha batyr Street and Ayteke bi in Kent Ayteke bi Kazalinsky district.
150.0 million tenge has been allocated for 2023. The length is 2.4 km . Contractor organization "Stroymodul Astana" LLP. Work is underway to level and expand the main layer of the street. The repair of the road continues.

The program "Implementation of budget investment projects in small and single-industry towns"
1. Reconstruction of the 15th street of the city of Kazalinsk, Kazalinsky district.
851.9 million tenge has been allocated for 2023. The length is 7.2 km . Contractor organization "Kyran" LLP. Gravel-sand mixture (GPS) and a layer of asphalt are laid on 6 streets. The repair of the road continues.


Reference (for 2023 second quarter)

Transport Infrastructure Development Program
1. Overhaul of the highway of regional significance km 45-76 "Kazaly-Kozhabaki-Bozkol-Kaukey" of the Kazalinsky district.
61.6 million tenge has been allocated for 2023. The length is 26 km . Contractor organization "Kyran" LLP. The repair of the road continues.
2. Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" 30-45 km of the Kazalinsky district.
411.9 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. A layer of asphalt has been laid on 8 km. The repair of the road continues.
3. Average repair of the highway of regional significance "Kozhabakhy-Bekarystan bi" 0-25 km of the Kazalinsky district.
635.2 million tenge has been allocated for 2023. The length is 15 km . Contractor organization "Kazaly Zholshy" LLP. Work is underway on the complete leveling and laying of a layer of gravel sand mixture (GPS). The repair of the road continues.
4. Average repair of the highway of regional significance "Entrance to the village of Muratbayev" 0-5 km of the Kazalinsky district.
131.3 million tenge has been allocated for 2023. The length is 5 km . Contractor organization "Stroymodul Astana" LLP. Destroyed sections of the road (4000 m2) have been restored and a 17 km asphalt layer has been laid. Road repair work has been fully completed, acceptance is underway.
5. Reconstruction of the highway of regional significance "Bozkol-Tasaryk" PK22+00-PK35+00 of the Kazalinsky district.
2.0 million tenge has been allocated for 2023. The length is 13 km . Contractor organization "Kazaly Zholshy" LLP. The contract is concluded.

The program "Auyl el besigi"
1. Average repair of Kazybek bi street in Kent Aitek bi Kazalinsky district.
32.2 million tenge has been allocated for 2023. The length is 1.5 km . Contractor organization "Daulet" LLP. A layer of gravel sand mixture (GPS) has been completely laid. The repair of the road continues.
2. Average repair of M.Auezov street in Kent Aitek bi Kazalinsky district.
23.3 million tenge has been allocated for 2023. Length 0.9 km. Contractor organization "Kazaly Zholshy" LLP. The repair of the road is fully completed and accepted.
3. Average repair of Altynsarin Street in Kent Aitek bi Kazalinsky district.
27.5 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Nuras and K" LLP. Road repair work has been fully completed, acceptance is underway.
4. Average repair of V.Schastnov Street in Kent Aitek bi Kazalinsky district.
55.9 million tenge has been allocated for 2023. The length is 1.6 km . Contractor organization "Stroymodul Astana" LLP. The asphalt layer is completely laid. The repair of the road continues.
5. Average repair of Asan kaigi street in Kent Aitek bi Kazalinsky district.
15.7 million tenge has been allocated for 2023. Length 0.5 km. Contractor organization "Kazaly Zholshy" LLP. The repair of the road is fully completed and accepted.
6. Average repair of Al-Farabi street in Kent Aitek bi Kazalinsky district.
14.6 million tenge has been allocated for 2023. The length is 0.6 km . Contractor organization "Kazaly Zholshy" LLP. The repair of the road is fully completed and accepted.
7. Average repair of T.Aubakirov street in Kent Aitek bi Kazalinsky district.
32.4 million tenge has been allocated for 2023. The length is 0.7 km . Contractor organization "Nuras and K" LLP. Road repair work has been fully completed, acceptance is underway.
8. Reconstruction of Zhankozha batyr Street and Ayteke bi in Kent Ayteke bi Kazalinsky district.
150.0 million tenge has been allocated for 2023. The length is 2.4 km . Contractor organization "Stroymodul Astana" LLP. The contract is concluded.

The program "Implementation of budget investment projects in small and single-industry towns"
1. Reconstruction of the 15th street of the city of Kazalinsk, Kazalinsky district.
851.9 million tenge has been allocated for 2023. The length is 7.2 km . Contractor organization "Kyran" LLP. A layer of gravel sand mixture (GPS) is laid on 6 streets. The repair of the road continues.


Reference (for 2022)

The state program of infrastructure development «Nurly Zhol» for 2020-2025

  1. Major repairs of the highway of regional significance km 45-76 «Kazaly-Kozhabaki-Bozkol-Kaukey» of the Kazalinsky district.

38,4 million tenge has been allocated for 2022. The length is 26 km. Contractor organization «Kyran» LLP. The asphalt layer is completely laid. Road repairs will be completed in 2023.

  1. Average repair of the highway of regional significance «Kozhabaky-Bekarystan bi» 0-18 km of the Kazalinsky district.

26.7 million tenge has been allocated for 2022. The length is 18 km. Contractor organization «StroyModul Astana» LLP. The repair of the road is fully completed and accepted.

  1. Average repair of the highway of regional significance «Basykara-Abai-Orkendeu» 0-20 km of the Kazalinsky district.

111,9 million tenge has been allocated for 2022. The length is 20 km. Contractor organization «StroyModul Astana» LLP. Road repairs will be completed in 2023

  1. Average repair of the highway of regional significance «Aiteke bi-Basykara» 0-19 km of the Kazalinsky district.

431,1 million tenge has been allocated for 2022. The length is 19 km. Contractor organization «StroyModul Astana» LLP. Destroyed sections of the road (4000 m2) have been restored and a layer of asphalt for 17 km has been laid. The repair of the road is fully completed and accepted.

  1. Average repair of the highway of regional significance «Bekarystan bi-Maidakol» 2,7-10 km of the Kazalinsky district.

224,4 million tenge has been allocated for 2022. The length is 7,3 km. Contractor organization «Nuras and K» LLP. The asphalt layer has been completely laid, work has been carried out to secure the curb. The repair of the road is fully completed and accepted.

  1. Average repair of the highway of regional significance «Kozhabaky-Bekarystan bi-Maidakol» 0-12 km of the Kazalinsky district.

382,7 million tenge has been allocated for 2022. The length is 12 km. Contractor organization «Nuras and K» LLP. The asphalt layer has been completely laid, work has been carried out to secure the curb. The repair of the road is fully completed and accepted.

  1. 7. Average repair of the highway of regional significance «Kazaly-Kolaryk-Bekarystan bi-ZHanakurylys» 43,7-56 km of the Kazalinsky district.

366,7 million tenge has been allocated for 2022. The length is 12.3 km. Contractor organization «Nuras and K» LLP. The asphalt layer has been completely laid, work has been carried out to secure the curb. The repair of the road is fully completed and accepted.

 

Development of transport infrastructure. The "Damu" program

  1. Reconstruction of a reinforced concrete bridge on 20.1 km of the highway of regional significance «Aiteke bi-Basykara» of the Kazalinsky district.

127,9 million tenge has been allocated for 2022. Contractor organization LLP "ZHylu 21". The foundation of the reinforced concrete bridge has been laid, supports and slabs have been installed. Fences have been installed on the side of the bridge, a layer of asphalt has been laid. The facility will be completed in 2023.

 


Reference (for the ІІ quarter of 2022)

The state program of infrastructure development «Nurly Zhol» for 2020-2025

 

  1. Major repairs of the highway of regional significance km 45-76 «Kazaly-Kozhabaki-Bozkol-Kaukey» of the Kazalinsky district.

100,0 million tenge has been allocated for 2022. The length is 26 km. Contractor organization «Kyran» LLP. Black crushed stone and asphalt are laid on 20 km. The repair of the road continues.

  1. Average repair of the highway of regional significance «Basykara-Abai-Orkendeu» 0-20 km of the Kazalinsky district.

111,9 million tenge has been allocated for 2022. The length is 20 km. Contractor organization «StroyModul Astana» LLP. A gravel sand mixture (GPS) and a layer of asphalt are laid on 12 km. The repair of the road continues.

  1. Average repair of the highway of regional significance «Aiteke bi-Basykara» 0-19 km of the Kazalinsky district.

454.3 million tenge has been allocated for 2022. The length is 19 km. Contractor organization «StroyModul Astana» LLP. 370 square meters of asphalt pavement were rebuilt on the destroyed sections of the road. There is also a layer of asphalt laid on 6 km. The repair of the road continues.

  1. Average repair of the highway of regional significance «Bekarystan bi-Maidakol» 2.7-10 km of the Kazalinsky district.

243.8 million tenge has been allocated for 2022. The length is 7.3 km. Contractor organization «Nuras and K» LLP. The asphalt layer of the highway has been destroyed and the road profile is being adjusted. The repair of the road continues.

  1. Average repair of the highway of regional significance «Kozhabaky-Bekarystan bi-Maidakol» 0-12 km of the Kazalinsky district.

407.9 million tenge has been allocated for 2022. The length is 12 km. Contractor organization «Nuras and K» LLP. The asphalt layer of the highway is destroyed and the main layer is reinforced. The repair of the road continues.

  1. 7. Average repair of the highway of regional significance «Kazaly-Kolaryk-Bekarystan bi-ZHanakurylys» 7-56 km of the Kazalinsky district.

339.4 million tenge has been allocated for 2022. The length is 12.3 km. Contractor organization «Nuras and K» LLP. 12.3 km of roads have been leveled, gravel sand mixture (GPS) and a layer of asphalt have been completely laid.

 

Development of transport infrastructure. The "Damu" program

 

  1. Reconstruction of a reinforced concrete bridge on 20.1 km of the highway of regional significance «Aiteke bi-Basykara» of the Kazalinsky district.

157,2 million tenge has been allocated for 2022. Contractor organization LLP "ZHylu 21". Fences are installed along the edges of the reinforced concrete bridge. Repair work continues.


Reference (for the first quarter of 2022)

Аverage repair of the highway of regional significance km 0-19 "Aiteke bi-Basykara" of the Kazalinsky district

416854.6 thousand tenge has been allocated for 2022. The length is 19 km. A contract is concluded with Stroy Modul-Astana LLP.

average repair of the highway of regional significance 2.7-10km "Bekarystan bi-Maidakol" of the Kazalinsky district.

For 2022, 224404.3 thousand tenge has been allocated. The length is 7.3 km. A contract is concluded with Nuras and K LLP.

average repair of the highway of regional significance km 43.7-56 "Kazaly-Kolaryk-Bekarystan bi-Zhanakurylys" of the Kazalinsky district.

For 2022, 327487.7 thousand tenge has been allocated. The length is 12.3 km. A contract is concluded with Nuras and K LLP.

average repair of the highway of regional significance km 0-12 "Kozhabaki-Bekarystan bi-Maidakol" of the Kazalinsky district.

374763.7 thousand tenge has been allocated for 2022. The length is 12 km. A contract is concluded with Nuras and K LLP.

reconstruction of a reinforced concrete bridge on 20.1 km of the "Aiteke bi-Basykara " of the Kazalinsky district.

For 2022, 127,960.0 thousand tenge was allocated. Length 39.10 m, width 12.48 m. contractor "Zhylu-XXI" LLP.


Reference (2021)

"Kazalinsky district Department of housing and Communal services, passenger transport and highways", that is, in the communal property of the district there are only 406.2 km of highways of district significance, including: 184.2 km of asphalt, 141 km of gravel and 81 km of dirt roads.

In order to improve the above-mentioned highways, the corresponding proposals are annually divided into the republican, regional and district budgets. In 2020, 2.8 billion tenge was allocated for the repair of roads of regional significance and internal streets and the following types of work were carried out.

1.According to the "Employment Roadmap for 2020-2021", the department implemented 4 projects from the republican and regional budgets for the repair of roads for a total amount of 671.1 million tenge were allocated.

To date, according to this program, the reconstruction of Gabdullina, Satpayev streets and the average repair of 9 streets (T.Aubakirova, S.Seifullina, Zh.Sheripova, Zh.Akbayeva, A.Moldagulova, N.Zhalimbetova, Syrym batyr, B.Nurpeisova, Birzhan sal) kent Aiteke bi, the village of G.Muratbayeva 7 streets (T.Aubakirova, G.Muratbayeva, Zhenistin 40 zhyldygy, T.Aubakirova, Batys, Zharylkasynova, A.Kunanbayeva), 4 streets of the city of Kazaly and Dostyk and Egizbay streets in the settlement of Zhankozha batyr. As a result, water pipes were renewed on the streets, asphalt pavement was laid on the roads, pedestrian paths and street lighting were restored.

The State program of regional development for 2020-2025.

A lot of work has been done in the Kazalinsky district under the program "Auyl el besigi". One of them is the average repair of the internal streets of the rural district of Maydakol, Kazalinsky district, the settlement of Bekarystan bi. In particular, the average repair of the streets of G.Muratbayev, Z.Kalieva, K.Makenov, U.Tuktibayev, S.Seifullina, A.Nurpeisova, A.Tleubaeva and M.Izmaganbetova was carried out, asphalt concrete was laid on 14 km, water pipes were installed. 529.9 million tenge has been allocated from the budget for this purpose.

The state program of infrastructure development "Nurly Zhol" for 2020-2025.

"Samara-Shymkent-Ayteke bi" of the district significance of the Kazalinsky district. The total cost of the project is 280.98 million tenge. The volume of allocations for the current year is 95.0 million tenge. In 2020, in accordance with the amount of allocated funds, the reconstruction of the territory of the road in poor technical condition (for 1 km) was carried out.

45-76 km of the Kazaly-Kozhabaki-Bozkol-Kaukey highway.    Currently, work has been carried out on laying asphalt concrete for 8.5 km.

The state reception works on average repair of highways of regional significance "Samara-Shymkent-Baykozha" 0-2 km, "Kazalinskaya ring road" 0-5 km, "Aiteke bi-Kazaly-Shagala" 0-4 km, "Access to Aiteke bi" 0-3 km, "Kazaly-Kozhabaki-Bozkol" have been completed and put into operation.Kaukey" (0-16 km) and "Ayteke bi-Basykara-Vodokachka" 0-7 km.

Currently, the average repair of the Kazaly-Kozhabaki-Bozkol-Kaukey highway (km 0-18) is continuing. Currently, work has been carried out on laying asphalt concrete for 3 km and gravel-sand mixture (GPS) for 18 km.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" 16-30 km. Currently, the works of gravel-sand mixture (GPS) have been completed and work has been carried out on laying asphalt concrete for 7.3 km.

Local budget.

In total, the average repair of 9 settlements and 18 streets was carried out from the district budget in 2020. The total length is 18.08 km . Including Aiteke bi-Basykara PK+10-PK 4+47.5 (between T.Aubakirov and Zhankozha Batyr streets), kent Aiteke bi (Tole bi, Zheltoksan, Tynybayev), settlements Zhalantos (Eleusizov, A.Tleubayev), Basykara (Seifullin, Amangeldy, Abai), Bozkol (Zholzhanov), Maidakol (I.Kalniyazov, Almas, Shanaul), Orkendeu (Tobayev), Kaukey (Zhankozha batyr, Kaukey), Aksuat (Lenin) and Abai (Valikhanov, Zhandildaev) the work on the corresponding amounts of financing has been completed and put into operation.

Bridges.

Reconstruction of a reinforced concrete bridge on 25 km of the highway of regional significance "Kozhabaki-Bekarystan bi" of the Kazalinsky district. 171.5 million tenge were allocated and construction works were carried out.

On the highway "Bypass of Kent Aiteke km 0-6" on the side of the reinforced concrete bridge, railings were replaced, gutters were installed and pit repairs were carried out.

In addition, 2.5 million tenge was allocated for the current repair of a reinforced concrete bridge located on 26.5 km of the highway of regional significance "Kozhabaki-Bekarystan bi", supporting concrete was restored and asphalt concrete was laid.


Reference (III quarter)

The state program of infrastructure development "Nurly Zhol" for 2020-2025

 The highway of regional significance "Aiteke bi-Kazaly" of the Kazalinsky district.

Work is underway on public procurement.

The highway of regional significance "Samara-Shymkent-Aiteke bi settlement" of the Kazalinsky district.

In accordance with the allocated amount of funds (asphalting for 1 km), the work has been completed. Due to the fact that the facility is transitioning, the rest of the work is planned for next year.

Overhaul of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 45-76 of the Kazalinsky district.

According to the amount of allocated funds, the work has been completed, 777.5 million tenge should be allocated for the complete completion of the work

Average repair of the highway of regional significance "Samara-Shymkent-Baykozha" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Kazalinsky bypass" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Aiteke bi-Basykara-Vodakachka" of the Kazalinsky district.

With the appropriate amount of funding, the work has been completed and put into operation.

Average repair of the highway of regional significance "Kent Aiteke bi-Kazalinsk-Shagala" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Access to Kent Aiteka bi" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Bypass of Kent Aiteke" of the Kazalinsky district.

Work continues, the railings of reinforced concrete bridges have been replaced, drains are being installed.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 16 (0-16).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 14 (16-30).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 18 (0-18).

Currently, road repairs are continuing.

 The State program of Regional Development for 2020-2025

 Development of social and engineering infrastructure of the village of Bekarystan bi within the framework of the special project "Auyl – El besigi". Average repair of the streets of the village of Bekarystan bi (M. Izmagambetova, Z.Kalieva, G.Muratbayev, K.Makenov, U.Tuktibayev, S. Seifullin, A. Nurpeisov, A. Tleubaev).

Currently, the work on the repair of Z streets has been completed .Kalieva, U. Tuktibayeva, S. Seifullina, S. Nurpeisova, M. Izmaganbetova, the other 3 streets (K. Muratbayev, K. Makenov, A. Tleubaev) the work continues.

 "Employment Roadmap for 2020-2021"

 The reconstruction of Gabdullina, Satpayev streets in the village of Ayteke bi and the average repair of 9 streets (T.Aubakirova, S. Seifullina, Zh. Sheripova, Zh.Akbayeva, A. Moldagulova, N.Zhalimbetova, Syrym batyr, B. Nurpeisova, Birzhan sal) in the village of G.Muratbayev (Iskendirov, G.Muratbayev, 40 years of victory, T.Aubakirov, Batys, Zharylkasynov).

The repair of A.Kunanbayev Street in the village of G.Muratbayev continues after a lawsuit related to gas networks (asphalt concrete laying works have been carried out). Acceptance work is currently underway.

Average repair of 4 streets (Amangeldy, Amangeldy dead end, A.Zhangeldina, A.Kunanbayev) of the city of Kazalinsk.

To date, the documents of the contractor have been sent to the court, the contract is terminated unilaterally and according to the results of public procurement procedures, PF Energopromservice LLP continues to work.

Along Dostyk and Egizbay streets in the settlement of Zhankozha batyr (asphalt concrete laying works were carried out). Acceptance works are currently underway (Due to the shortage of bitumen on the hot asphalt layer in the republic, it is carried out late in the work period).

District budget

In total, there are 9 settlements and 18 streets in 2020. The total length is 17.7 km. Of these, 5 settlements, 12 streets are Zhalantos (Eleusizov, A.Tleubaev), Basykara (Seifullin, Amangeldy, Abai), Boskol (Zholzhanov), Maidakol (I.Kalniyazov, Almas, Shanaul), kent Aiteke bi (Tole bi, Zheltoksan, Tynybayev).

In the village of Orkendeu (Tobayev), in the village of Kaukey (Zhankozha batyr, Kaukey), in the village of Aksuat (Lenin) and in the village of Abai (Ualikhanov, Zhandildaev), work has been completed and reception work is underway.

Average repair of highways of regional significance "Kazaly-Kolaryk-Bekarystan bi-Zhanakurylys" PK33+00-PK38+00 and "Aiteke bi-Basykara PK4+10-PK4+47.5 (between T. Aubakirov and Zhankozha batyr streets) of Kazalinsky district.

Repair work is currently underway.

The current repair of a reinforced concrete bridge on 26.5 km of the highway of regional significance "Kozhabaki-Bekarystan bi".

Concrete supports are being restored.


Reference (II quarter)

The state program of infrastructure development "Nurly Zhol" for 2020-2025

 The highway of regional significance "Aiteke bi-Kazaly" of the Kazalinsky district.

Work is underway on public procurement.

The highway of regional significance "Samara-Shymkent- Aiteke bi" of the Kazalinsky district.

The contractor has been identified, and work is currently underway to lay asphalt.

Overhaul of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 45-76 of the Kazalinsky district.

Depending on the amount of funding, work is underway.

Average repair of the highway of regional significance "Samara-Shymkent-Baykozha" of the Kazalinsky district.

The state reception works have been completed and put into operation.

Average repair of the highway of regional significance "Kazalinsky bypass" of the Kazalinsky district.

Road repairs have been completed, state reception is underway.

Average repair of the highway of regional significance "Aiteke bi-Basykara-Vodakachka" of the Kazalinsky district.

With the appropriate amount of funding, the work has been completed and put into operation.

Average repair of the highway of regional significance "Aiteke bi-Kazalinsk-Shagala" of the Kazalinsky district.

The repair of roads has been completed, the state reception is underway.

Average repair of the highway of regional significance "Entrance to the kenta Aiteka bi" of the Kazalinsky district.

The work has been completed with the appropriate amount of funding.

Average repair of the highway of regional significance "Bypass of Kent Aiteke bi" of the Kazalinsky district.

The contractor is identified, contracts are concluded.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 16 (0-16).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 14 (16-30).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 18 (0-18).

The contractor is identified, contracts are concluded.

 The State program of Regional Development for 2020-2025

 Development of social and engineering infrastructure of the village of Bekarystan bi within the framework of the special project "Auyl – El besigi". Average repair of the streets of the village of Bekarystan bi (M. Izmagambetov, Z.Kalieva, G.Muratbayev, K.Makenov, U.Tuktibayev, S. Seifullin, A. Nurpeisov).

The winning contractors have been identified, construction and installation work is currently underway.

Employment Roadmap 2020

 Contractors have been identified on 9 streets of Kent Aiteke bi (T.Aubakirov, S.Seifullin, Zh.Sheripov, Zh.Akbayev, A.Moldagulova, N.Zhalimbetov, Syrym Batyr, B.Nurpeisov, Birzhan sal) and 4 streets of Kazalinsk (A.Kunanbayev, Amangeldi puffin, Amangeldi and A.Zhangeldin). Construction and installation works are currently underway.

From the settlement of Muratbayev, the winning contractors of 7 streets were identified (G.Muratbayev, Iskendirov, T.Aubakirov, Zhenistin 40 zhyldygy, Kunanbayev, Zharylkasynov and Batys). Currently, asphalt laying works are underway.

A sand-gravel mixture (GPS) has been laid along Dostyk and Egizbay streets in the settlement of Zhankozha batyr. The work has been carried out with the appropriate amount of funding.

Reconstruction of Gabdullina Street in Kenta Aiteka bi. Currently, road repairs are continuing.

Reconstruction of Satpayev Street in Kenta Aiteka bi. Road repairs are being completed, state reception is underway.

A sand-gravel mixture (GPS) has been laid along the streets of Seifullin, Abay, Amangeldy in the settlement of Basykara. The work has been carried out with the appropriate amount of funding.

On the streets of the village of Zhalantos batyr (Eleusizova, Tleubaeva), a sand-gravel mixture (GPS) is laid. The work has been carried out with the appropriate amount of funding.

In the village of Orkendeu, work on the average repair of Tobayev Street has been completed, state reception is underway.

A sand-gravel mixture (GPS) has been laid along the streets of the Maydakol settlement (I.Kalniyazov, Almas, Shanauyl). With the appropriate amount of funding, the works were completed and put into operation.

In the locality of Bozkol on Zholzhanov Street, a sand-gravel mixture (GPS) is laid. With the appropriate amount of funding, the works were completed and put into operation.

In the settlement of Kaukey, a sand-gravel mixture (GPS) is laid along the streets of Zhankozha Batyr, Kaukey. The work has been carried out with the appropriate amount of funding.

Ualikhanov, Zhanidldaev streets of the village of Abai. Currently, road repairs are continuing.

In the village of Aksuat, a sand-gravel mixture (GPS) is laid along Lenin Street.  With the appropriate amount of funding, the works were completed and put into operation.


  1. Transport and roads

    In the communal property of the State Institution "Department of Housing and Communal Services, passenger transport and highways of the Kazalinsky district" there are a total of 406.2 km of highways of district significance, including: 184.2 km. with asphalt concrete, 141 km. gravel-sand surface and 81 km of dirt roads.

    To improve the condition of highways of regional significance, proposals are made annually for allocating funds from regional and republican budgets.

    To date, as a result of public procurement , the winner

    the following work is being carried out:

    8 settlements of the Kazalinsky district will repair 14 streets for 184,513.7 thousand tenge.

    In particular: The average repair of Lenin Street from the locality has begun

    Aksuat, Tobayev Street from the settlement of Zhankent, Zhankozha batyr and Kaukey streets from the settlement of Kaukey, Zholzhanov Street from the settlement of Bozkol, Zhandildaea and Ualikhanov streets from the settlement of Abaya, Kalniyazov, Almatov, Shanauyl streets from the settlement of Maidakol, Seifullin, Abaya, Amangeldi streets from the settlement of Basykara and Eleusizova Street in settlements of Zhalantos batyr.

    In the current year, the allocated funds from the regional budget conclude contracts for the completion of repair of highways of regional significance "Kazaly-Kozhabakhy-Bozkol-Kaukey" 0-16 km, 16-30 km, 45-76 km and highways Kozhabakhy-Bekarystan Bi" 0-18 km.

    Public procurement tenders were held for 7 projects, which allocated 795988.0 thousand tenge from the republican budget. At this time, contractors are carrying out construction work on repairs of highways::

    Average repair of highways of regional significance

    "Kazaly-Kolaryk-Bekarystan bi-Zhanakurylys" 0-33 km; (works are under development).

    "Samara-Shymkent-Baykozha" 0-2 km; (Depending on the amount of funding, the work has been completed).

    "Kent Aiteke bi entrance" 0-3 km; ; (Depending on the amount of funding, the work has been completed).

    "kent Aiteke bi –Kazalinsk city-Shagala camp" 4 km; ; (Depending on the amount of funding, the work has been completed).

     "Kent Aiteke bi bypass road" 6 km; (work is underway).

    "kent Aiteke bi-Water pump" 9 km; (work continues).

    "Kazalinsk Zholy bypass road" 5 km; (Depending on the amount of funding, the work has been completed).

    By 2020, at the expense of funds allocated from the regional budget, the work of these projects will be completed (with the exception of 0-33 km).

    Agreements are currently being developed between the relevant departments and contractors.

    Public transport and passenger transportation

    2 business entities are engaged in passenger transportation in the district. Including the state of emergency With .Aitzhanov and Kazaly Taxi LLP.

    In total, there are 36 automobile transportation routes in the district, including 8 in Kent, 8 within Kent, 19 within the district, 8 inter-district, 1 intercity. Only 41 buses and 106 minibuses (Gazelles) are involved on these routes. Traffic patterns and schedules, fares have been approved and agreed upon. Permanent passenger transportation covers 23 settlements of 19 aul districts, the city of Kazalinsk and the district center.


Reference (2020)

"Kazalinsky district Department of housing and Communal services, passenger transport and highways", that is, in the communal property of the district there are only 406.2 km of highways of district significance, including: 184.2 km of asphalt, 141 km of gravel and 81 km of dirt roads.

In order to improve the above-mentioned highways, the corresponding proposals are annually divided into the republican, regional and district budgets. In 2020, 2.8 billion tenge was allocated for the repair of roads of regional significance and internal streets and the following types of work were carried out.

1.According to the "Employment Roadmap for 2020-2021", the department implemented 4 projects from the republican and regional budgets for the repair of roads for a total amount of 671.1 million tenge were allocated.

To date, according to this program, the reconstruction of Gabdullina, Satpayev streets and the average repair of 9 streets (T.Aubakirova, S.Seifullina, Zh.Sheripova, Zh.Akbayeva, A.Moldagulova, N.Zhalimbetova, Syrym batyr, B.Nurpeisova, Birzhan sal) kent Aiteke bi, the village of G.Muratbayeva 7 streets (T.Aubakirova, G.Muratbayeva, Zhenistin 40 zhyldygy, T.Aubakirova, Batys, Zharylkasynova, A.Kunanbayeva), 4 streets of the city of Kazaly and Dostyk and Egizbay streets in the settlement of Zhankozha batyr. As a result, water pipes were renewed on the streets, asphalt pavement was laid on the roads, pedestrian paths and street lighting were restored.

The State program of regional development for 2020-2025.

A lot of work has been done in the Kazalinsky district under the program "Auyl el besigi". One of them is the average repair of the internal streets of the rural district of Maydakol, Kazalinsky district, the settlement of Bekarystan bi. In particular, the average repair of the streets of G.Muratbayev, Z.Kalieva, K.Makenov, U.Tuktibayev, S.Seifullina, A.Nurpeisova, A.Tleubaeva and M.Izmaganbetova was carried out, asphalt concrete was laid on 14 km, water pipes were installed. 529.9 million tenge has been allocated from the budget for this purpose.

The state program of infrastructure development "Nurly Zhol" for 2020-2025.

"Samara-Shymkent-Ayteke bi" of the district significance of the Kazalinsky district. The total cost of the project is 280.98 million tenge. The volume of allocations for the current year is 95.0 million tenge. In 2020, in accordance with the amount of allocated funds, the reconstruction of the territory of the road in poor technical condition (for 1 km) was carried out.

45-76 km of the Kazaly-Kozhabaki-Bozkol-Kaukey highway.    Currently, work has been carried out on laying asphalt concrete for 8.5 km.

The state reception works on average repair of highways of regional significance "Samara-Shymkent-Baykozha" 0-2 km, "Kazalinskaya ring road" 0-5 km, "Aiteke bi-Kazaly-Shagala" 0-4 km, "Access to Aiteke bi" 0-3 km, "Kazaly-Kozhabaki-Bozkol" have been completed and put into operation.Kaukey" (0-16 km) and "Ayteke bi-Basykara-Vodokachka" 0-7 km.

Currently, the average repair of the Kazaly-Kozhabaki-Bozkol-Kaukey highway (km 0-18) is continuing. Currently, work has been carried out on laying asphalt concrete for 3 km and gravel-sand mixture (GPS) for 18 km.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" 16-30 km. Currently, the works of gravel-sand mixture (GPS) have been completed and work has been carried out on laying asphalt concrete for 7.3 km.

Local budget.

In total, the average repair of 9 settlements and 18 streets was carried out from the district budget in 2020. The total length is 18.08 km . Including Aiteke bi-Basykara PK+10-PK 4+47.5 (between T.Aubakirov and Zhankozha Batyr streets), kent Aiteke bi (Tole bi, Zheltoksan, Tynybayev), settlements Zhalantos (Eleusizov, A.Tleubayev), Basykara (Seifullin, Amangeldy, Abai), Bozkol (Zholzhanov), Maidakol (I.Kalniyazov, Almas, Shanaul), Orkendeu (Tobayev), Kaukey (Zhankozha batyr, Kaukey), Aksuat (Lenin) and Abai (Valikhanov, Zhandildaev) the work on the corresponding amounts of financing has been completed and put into operation.

Bridges.

Reconstruction of a reinforced concrete bridge on 25 km of the highway of regional significance "Kozhabaki-Bekarystan bi" of the Kazalinsky district. 171.5 million tenge were allocated and construction works were carried out.

On the highway "Bypass of Kent Aiteke km 0-6" on the side of the reinforced concrete bridge, railings were replaced, gutters were installed and pit repairs were carried out.

In addition, 2.5 million tenge was allocated for the current repair of a reinforced concrete bridge located on 26.5 km of the highway of regional significance "Kozhabaki-Bekarystan bi", supporting concrete was restored and asphalt concrete was laid.


Reference (III quarter)

The state program of infrastructure development "Nurly Zhol" for 2020-2025

 The highway of regional significance "Aiteke bi-Kazaly" of the Kazalinsky district.

Work is underway on public procurement.

The highway of regional significance "Samara-Shymkent-Aiteke bi settlement" of the Kazalinsky district.

In accordance with the allocated amount of funds (asphalting for 1 km), the work has been completed. Due to the fact that the facility is transitioning, the rest of the work is planned for next year.

Overhaul of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 45-76 of the Kazalinsky district.

According to the amount of allocated funds, the work has been completed, 777.5 million tenge should be allocated for the complete completion of the work

Average repair of the highway of regional significance "Samara-Shymkent-Baykozha" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Kazalinsky bypass" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Aiteke bi-Basykara-Vodakachka" of the Kazalinsky district.

With the appropriate amount of funding, the work has been completed and put into operation.

Average repair of the highway of regional significance "Kent Aiteke bi-Kazalinsk-Shagala" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Access to Kent Aiteka bi" of the Kazalinsky district.

The state acceptance works have been completed and put into operation.

Average repair of the highway of regional significance "Bypass of Kent Aiteke" of the Kazalinsky district.

Work continues, the railings of reinforced concrete bridges have been replaced, drains are being installed.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 16 (0-16).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 14 (16-30).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 18 (0-18).

Currently, road repairs are continuing.

 The State program of Regional Development for 2020-2025

 Development of social and engineering infrastructure of the village of Bekarystan bi within the framework of the special project "Auyl – El besigi". Average repair of the streets of the village of Bekarystan bi (M. Izmagambetova, Z.Kalieva, G.Muratbayev, K.Makenov, U.Tuktibayev, S. Seifullin, A. Nurpeisov, A. Tleubaev).

Currently, the work on the repair of Z streets has been completed .Kalieva, U. Tuktibayeva, S. Seifullina, S. Nurpeisova, M. Izmaganbetova, the other 3 streets (K. Muratbayev, K. Makenov, A. Tleubaev) the work continues.

 "Employment Roadmap for 2020-2021"

 The reconstruction of Gabdullina, Satpayev streets in the village of Ayteke bi and the average repair of 9 streets (T.Aubakirova, S. Seifullina, Zh. Sheripova, Zh.Akbayeva, A. Moldagulova, N.Zhalimbetova, Syrym batyr, B. Nurpeisova, Birzhan sal) in the village of G.Muratbayev (Iskendirov, G.Muratbayev, 40 years of victory, T.Aubakirov, Batys, Zharylkasynov).

The repair of A.Kunanbayev Street in the village of G.Muratbayev continues after a lawsuit related to gas networks (asphalt concrete laying works have been carried out). Acceptance work is currently underway.

Average repair of 4 streets (Amangeldy, Amangeldy dead end, A.Zhangeldina, A.Kunanbayev) of the city of Kazalinsk.

To date, the documents of the contractor have been sent to the court, the contract is terminated unilaterally and according to the results of public procurement procedures, PF Energopromservice LLP continues to work.

Along Dostyk and Egizbay streets in the settlement of Zhankozha batyr (asphalt concrete laying works were carried out). Acceptance works are currently underway (Due to the shortage of bitumen on the hot asphalt layer in the republic, it is carried out late in the work period).

District budget

In total, there are 9 settlements and 18 streets in 2020. The total length is 17.7 km. Of these, 5 settlements, 12 streets are Zhalantos (Eleusizov, A.Tleubaev), Basykara (Seifullin, Amangeldy, Abai), Boskol (Zholzhanov), Maidakol (I.Kalniyazov, Almas, Shanaul), kent Aiteke bi (Tole bi, Zheltoksan, Tynybayev).

In the village of Orkendeu (Tobayev), in the village of Kaukey (Zhankozha batyr, Kaukey), in the village of Aksuat (Lenin) and in the village of Abai (Ualikhanov, Zhandildaev), work has been completed and reception work is underway.

Average repair of highways of regional significance "Kazaly-Kolaryk-Bekarystan bi-Zhanakurylys" PK33+00-PK38+00 and "Aiteke bi-Basykara PK4+10-PK4+47.5 (between T. Aubakirov and Zhankozha batyr streets) of Kazalinsky district.

Repair work is currently underway.

The current repair of a reinforced concrete bridge on 26.5 km of the highway of regional significance "Kozhabaki-Bekarystan bi".

Concrete supports are being restored.


Reference (II quarter)

The state program of infrastructure development "Nurly Zhol" for 2020-2025

 The highway of regional significance "Aiteke bi-Kazaly" of the Kazalinsky district.

Work is underway on public procurement.

The highway of regional significance "Samara-Shymkent- Aiteke bi" of the Kazalinsky district.

The contractor has been identified, and work is currently underway to lay asphalt.

Overhaul of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 45-76 of the Kazalinsky district.

Depending on the amount of funding, work is underway.

Average repair of the highway of regional significance "Samara-Shymkent-Baykozha" of the Kazalinsky district.

The state reception works have been completed and put into operation.

Average repair of the highway of regional significance "Kazalinsky bypass" of the Kazalinsky district.

The repair of roads has been completed, the state reception is underway.

Average repair of the highway of regional significance "Aiteke bi-Basykara-Vodakachka" of the Kazalinsky district.

With the appropriate amount of funding, the work has been completed and put into operation.

Average repair of the highway of regional significance "Aiteke bi-Kazalinsk-Shagala" of the Kazalinsky district.

The repair of roads has been completed, the state reception is underway.

Average repair of the highway of regional significance "Entrance to the kenta Aiteka bi" of the Kazalinsky district.

The work has been completed with the appropriate amount of funding.

Average repair of the highway of regional significance "Bypass of Kent Aiteke bi" of the Kazalinsky district.

The contractor is identified, contracts are concluded.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 16 (0-16).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 14 (16-30).

Currently, road repairs are continuing.

Average repair of the highway of regional significance "Kazaly-Kozhabaki-Bozkol-Kaukey" km 18 (0-18).

The contractor is identified, contracts are concluded.

 The State program of Regional Development for 2020-2025

 Development of social and engineering infrastructure of the village of Bekarystan bi within the framework of the special project "Auyl – El besigi". Average repair of the streets of the village of Bekarystan bi (M. Izmagambetov, Z.Kalieva, G.Muratbayev, K.Makenov, U.Tuktibayev, S. Seifullin, A. Nurpeisov).

The winning contractors have been identified, construction and installation work is currently underway.

Employment Roadmap 2020

 Contractors have been identified on 9 streets of Kent Aiteke bi (T.Aubakirov, S.Seifullin, Zh.Sheripov, Zh.Akbayev, A.Moldagulova, N.Zhalimbetov, Syrym Batyr, B.Nurpeisov, Birzhan sal) and 4 streets of Kazalinsk (A.Kunanbayev, Amangeldi puffin, Amangeldi and A.Zhangeldin). Construction and installation works are currently underway.

From the settlement of Muratbayev, the winning contractors of 7 streets were identified (G.Muratbayev, Iskendirov, T.Aubakirov, Zhenistin 40 zhyldygy, Kunanbayev, Zharylkasynov and Batys). Currently, asphalt laying works are underway.

A sand-gravel mixture (GPS) has been laid along Dostyk and Egizbay streets in the settlement of Zhankozha batyr. The work has been carried out with the appropriate amount of funding.

Reconstruction of Gabdullina Street in Kenta Aiteka bi. Currently, road repairs are continuing.

Reconstruction of Satpayev Street in Kenta Aiteka bi. Road repairs are being completed, state reception is underway.

A sand-gravel mixture (GPS) has been laid along the streets of Seifullin, Abay, Amangeldy in the settlement of Basykara. The work has been carried out with the appropriate amount of funding.

On the streets of the village of Zhalantos batyr (Eleusizova, Tleubaeva), a sand-gravel mixture (GPS) is laid. The work has been carried out with the appropriate amount of funding.

In the village of Orkendeu, work on the average repair of Tobayev Street has been completed, state reception is underway.

A sand-gravel mixture (GPS) has been laid along the streets of the Maydakol settlement (I.Kalniyazov, Almas, Shanauyl). With the appropriate amount of funding, the works were completed and put into operation.

In the locality of Bozkol on Zholzhanov Street, a sand-gravel mixture (GPS) is laid. With the appropriate amount of funding, the works were completed and put into operation.

In the settlement of Kaukey, a sand-gravel mixture (GPS) is laid along the streets of Zhankozha Batyr, Kaukey. The work has been carried out with the appropriate amount of funding.

Ualikhanov, Zhanidldaev streets of the village of Abai. Currently, road repairs are continuing.

In the village of Aksuat, a sand-gravel mixture (GPS) is laid along Lenin Street.  With the appropriate amount of funding, the works were completed and put into operation.


  1. Transport and roads

    In the communal property of the State Institution "Department of Housing and Communal Services, passenger transport and highways of the Kazalinsky district" there are a total of 406.2 km of highways of district significance, including: 184.2 km. with asphalt concrete, 141 km. gravel-sand surface and 81 km of dirt roads.

    To improve the condition of highways of regional significance, proposals are made annually for allocating funds from regional and republican budgets.

    To date, as a result of public procurement , the winner

    the following work is being carried out:

    8 settlements of the Kazalinsky district will repair 14 streets for 184,513.7 thousand tenge.

    In particular: The average repair of Lenin Street from the locality has begun

    Aksuat, Tobayev Street from the settlement of Zhankent, Zhankozha batyr and Kaukey streets from the settlement of Kaukey, Zholzhanov Street from the settlement of Bozkol, Zhandildaea and Ualikhanov streets from the settlement of Abaya, Kalniyazov, Almatov, Shanauyl streets from the settlement of Maidakol, Seifullin, Abaya, Amangeldi streets from the settlement of Basykara and Eleusizova Street in settlements of Zhalantos batyr.

    In the current year, the allocated funds from the regional budget conclude contracts for the completion of repair of highways of regional significance "Kazaly-Kozhabakhy-Bozkol-Kaukey" 0-16 km, 16-30 km, 45-76 km and highways Kozhabakhy-Bekarystan Bi" 0-18 km.

    Public procurement tenders were held for 7 projects, which allocated 795988.0 thousand tenge from the republican budget. At this time, contractors are carrying out construction work on repairs of highways::

    Average repair of highways of regional significance

    "Kazaly-Kolaryk-Bekarystan bi-Zhanakurylys" 0-33 km; (works are under development).

    "Samara-Shymkent-Baykozha" 0-2 km; (Depending on the amount of funding, the work has been completed).

    "Kent Aiteke bi entrance" 0-3 km; ; (Depending on the amount of funding, the work has been completed).

    "kent Aiteke bi –Kazalinsk city-Shagala camp" 4 km; ; (Depending on the amount of funding, the work has been completed).

     "Kent Aiteke bi bypass road" 6 km; (work is underway).

    "kent Aiteke bi-Water pump" 9 km; (work continues).

    "Kazalinsk Zholy bypass road" 5 km; (Depending on the amount of funding, the work has been completed).

    By 2020, at the expense of funds allocated from the regional budget, the work of these projects will be completed (with the exception of 0-33 km).

    Agreements are currently being developed between the relevant departments and contractors.

    Public transport and passenger transportation

    2 business entities are engaged in passenger transportation in the district. Including the state of emergency With .Aitzhanov and Kazaly Taxi LLP.

    In total, there are 36 automobile transportation routes in the district, including 8 in Kent, 8 within Kent, 19 within the district, 8 inter-district, 1 intercity. Only 41 buses and 106 minibuses (Gazelles) are involved on these routes. Traffic patterns and schedules, fares have been approved and agreed upon. Permanent passenger transportation covers 23 settlements of 19 aul districts, the city of Kazalinsk and the district center.

 

Дата публикации
23 апреля 2020
Дата обновления
15 июля 2026
Тип
Information

Сейчас читают

03 июня 2025
Internal analysis of corruption risks
03 июня 2025
Internal analysis of corruption risks
03 июня 2025
Internal analysis of corruption risks

Социальные медиа

Facebook
Instagram
Youtube
Вконтакте

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты