Investment potential of the region
(January-December)
In the long term (in the next 10 years), the socio-economic development of the region will be based on the development of 5 promising industries:
First, taking into account the natural features of the region and the fact that the region is rich in minerals, the further development of the mining industry of the industry. The region is mainly rich in sources of minerals such as vannadium, uranium, lead, zinc and others. For the development of deposits, work will continue on the implementation of projects:
- "Construction of a processing plant and expansion of the Shalkiya mine with an annual capacity of 4 million tons of lead-zinc ore" - initiator of "Shalkiya Zinc" LLP Project cost - 168 billion tenge, jobs-1540.
- Expansion of production for processing vannadium ores-Balausa Processing Company LLP. The project cost is 35.0 billion tenge, new jobs–649. Implementation period 2012-2024.
Second, by processing local minerals, it is planned to develop the industry for the production of building materials. The following projects are planned to be implemented in this direction:
- Project "Construction of a plant for the production and processing of flat glass with a capacity of 197,100 tons / year". The project cost is 42.1 billion tenge, jobs – 226;
- The project "Opening of a mini rebar plant". Cost-260 million tenge, jobs – 22 people;
Third, in order to ensure food security, it is necessary to further develop the agro-industrial complex, which is traditional for our region. The following projects will be implemented in this direction:
- The project " Construction of a meat processing plant "of" Syr Marzhany " LLP. The project cost is 952.7 million tenge, jobs-23.
- The project " Construction of a dairy farm "of" SyrAgro " LLP. The project cost is 2.5 billion tenge, working places-50.
- The project "Construction of an industrial automated greenhouse on an area of 2.2 hectares in Kyzylorda" of KazAgroMir LLP. The project cost is 1.1 billion tenge, working places-30.
- The project " Construction of an industrial complex for the extraction, processing and enrichment of salt "of BSK Karatau LLP. The project cost is 2.9 billion tenge, jobs-500.
Fourth, there are 6 industrial zones with a total area of 511.9 hectares on the territory of the region. To date, 245.5 hectares of land have been developed from the allocated land plots for 56 projects with a total cost of 197.2 billion tenge. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each industrial zone has a developed infrastructure (energy and water supply, natural gas supply, etc.). Out
of 56 projects, 22 projects worth 65.3 billion tenge were implemented, where 349 jobs were created.
In 2020, the introduced projects produced products worth 12.2 billion tenge.
Fifth, to attract investment to the region, the akimat of the region has developed a comprehensive "Plan for the economic development of the Kyzylorda region until 2023". Within the framework of the Plan, it is planned to implement 265 investment projects. Of these, this year we are putting into operation 110 projects worth 26 billion tenge. Of these, 89 projects were put into operation.
Investment potential of the region
(January-December)
In the long term (next 10 years) socio-economic development of the region will be based on the development of 5 promising sectors:
First, considering natural features of the region and that the region is rich in minerals, further development of the mining industry. Mainly in the region are rich sources of minerals such as vanadia, uranium, lead, zinc and others. For the development of deposits, work will continue on the implementation of projects:
- "Construction of a processing plant and expansion of the Shalkiya mine with an annual capacity of 4 million tons of lead-zinc ore" - initiator of "Shalkiya Zinc" LLP Project cost - 168 billion tenge, jobs-1540.
-Expansion of production for processing ore wannadies – LLP "Balausa processing company". The project cost is 35.0 billion tenge, new jobs–649. Implementation period 2012-2019.
Second, by processing local minerals, it is planned to develop the industry for the production of building materials. The following projects are planned to be implemented in this direction:
- Project "Construction of a plant for the production and processing of flat glass with a capacity of 197,100 tons / year". The cost of the project is 42.1 billion tenge, workplaces – 226;
- The project "Opening of a mini rebar plant". Cost-260 million tenge, jobs – 22 people;
Third, in order to ensure food security, it is necessary to further develop the agro-industrial complex, which is traditional for our region. The following projects will be implemented in this direction:
- The project " Construction of a meat processing plant "of" Syr Marzhany " LLP. The cost of the project is 952.7 million tenge, jobs-23.
- The project " Construction of a dairy farm "of" SyrAgro " LLP. The project cost is 2.5 billion tenge, working places-50.
- The project "Construction of an industrial automated greenhouse on an area of 2.2 hectares in Kyzylorda" by KazAgroMir LLP. The cost of the project is 1.1 billion tenge, working places-30.
- The project " Construction of an industrial complex for the extraction, processing and enrichment of salt "of BSK Karatau LLP. The cost of the project is 2.9 billion tenge, workplaces – 500.
Fourth, there are 6 industrial zones with a total area of 511.9 hectares on the territory of the region. To date, 245.5 hectares of land have been developed from the allocated land plots for 56 projects with a total cost of 197.2 billion tenge. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each industrial zone has a developed infrastructure (energy and water supply, natural gas supply, etc.). Out
of 56 projects, 22 projects worth 65.3 billion tenge were implemented, where 349 jobs were created.
For 2020, the project commissioned in manufactured products in the amount of 12.2 billion tenge.
Fifth, to attract investment to the region, the akimat of the region has developed a comprehensive "Plan for economic development of the Kyzylorda region until 2023". Within the framework of the Plan, it is planned to implement 265 investment projects. Of these, this year we are putting into operation 110 projects worth 26 billion tenge. Of these, 89 projects were put into operation.
Investment potential of the region
(January-August)
In the long-term perspective (in the next 10 years), the socio-economic development of the region will be based on the development of 5 promising industries:
First, taking into account the natural features of the region and the fact that the region is rich in minerals, the further development of the mining industry of the industry. Mainly in the region are rich sources of minerals such as vanadia, uranium, lead, zinc and others. Project implementation will continue for the development of deposits:
- "Construction of a processing plant and expansion of the Shalkiya mine with an annual capacity of 4 million tons of lead-zinc ore" - initiator of "Shalkiya Zinc" LLP project Cost-168 billion tenge, jobs-1540.
-Expansion of production for processing ore wannadies – LLP "Balausa processing company". The project cost is 35.0 billion tenge, new jobs–649. Implementation period 2012-2019gods.
Second, by processing local minerals, it is planned to develop the industry for the production of building materials. The following projects are planned to be implemented in this direction:
- Project "Construction of a plant for the production and processing of flat glass with a capacity of 197,100 tons / year". The cost of the project is 42.1 billion tenge, workplaces – 226;
- Project "Construction of a plant for the production of glass-plastic linear and high-pressure tubing in the city of Kyzylorda". Cost-1.8 billion tenge, jobs-78 people;
- Project "opening of a mini rebar plant". Cost - 260 million tenge, jobs – 22 people;
Third, in order to ensure food security, it is necessary to further develop the traditional agro-industrial complex in our region. The following projects will be implemented in this direction:
Project "Construction of dairy farms" LLP "Synagro". The project cost is 2.5 billion tenge, working places – 50.
- Project "Construction of an industrial automated greenhouse on an area of 2.2 hectares in Kyzylorda" by kazagromir LLP. The project cost is 1.1 billion tenge, working places – 30.
- Project " Construction of an industrial complex for the extraction, processing and enrichment of salt "by BSK Karatau LLP. The cost of the project is 2.9 billion tenge, workplaces – 500.
- Project " construction of a meat processing plant "of" Syr Marzhany " LLP. The project cost is 832.5 million tenge, jobs–30 .
Fourth, there are 6 industrial zones with a total area of 506.9 hectares in the region. To date, 243.5 hectares of land have been developed from the allocated land plots for 55 projects with a total cost of 197 billion tenge. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each industrial zone has a developed infrastructure (energy and water supply, natural gas supply, etc.).
Of the 55 projects, 21 projects worth 65.3 billion tenge were implemented, where 339 jobs were created.
In 2019, the project commissioned released products worth 9.2 billion tenge for January-August 2020 of output at $ 1.1 billion.
Fifth, to attract investment to the region, the regional akimat has developed a comprehensive "Plan for economic development of the Kyzylorda region until 2023". Within the framework of the Plan, 265 investment projects are planned to be implemented. This year, we are putting into operation 108 projects worth 26 billion tenge. Of these, 59 projects worth 4.8 billion tenge were put into operation.
Investment potential of the region
In the long term (next 10 years) socio-economic development of the region will be based on the development of 5 promising sectors:
First, considering natural features of the region and that the region is rich in minerals, further development of the mining industry. Mainly in the region are rich sources of minerals such as vanadia, uranium, lead, zinc and others. Project implementation will continue for the development of deposits:
- "Construction of a processing plant and expansion of the Shalkiya mine with an annual capacity of 4 million tons of lead-zinc ore" - initiator of "Shalkiya Zinc" LLP project Cost-168 billion tenge, jobs-1540.
-Expansion of production for processing ore wannadies – LLP "Balausa processing company". The project cost is 35.0 billion tenge, new jobs–649. Implementation period 2012-2019gods.
Second, by processing local minerals, it is planned to develop the industry for the production of building materials. The following projects are planned to be implemented in this direction:
- Project" lime production Plant "of Premium class Stroy LLP. The project cost is 140 million tenge, jobs – 26. The project was launched in October 2018. According to the results of 2019, 11.4 thousand tons of products were produced for 193.3 thousand tenge, in January-February 2020-2.4 thousand tons of products worth 40.8 million tenge..
- Project "Construction of a plant for the production and processing of flat glass with a capacity of 197,100 tons / year". The cost of the project is 42.1 billion tenge, workplaces – 226;
- The project "construction of a plant for the production of ceramic products" of the Turkish company "Yildizlar SSS Holding". The project cost is 43.5 billion tenge. Construction is planned for 2020.
In 2018, the project "construction of a cement plant" was put into operation. The initiator of the project LLP "Shieli Company Gezhouba Cement", at a cost of 64 billion tenge, workplaces – 260. It should be noted that the project was put into operation ahead of schedule in December 2018. At the end of 2019, we produced 380 thousand tons of cement, worth 6.1 billion tenge, including 39 thousand tons exported to Uzbekistan. In January-February 2020, 47.3 thousand tons of products were produced, of which 31 thousand tons were exported.
Third, in order to ensure food security, it is necessary to further develop the traditional agro-industrial complex in our region. The following projects will be implemented in this direction:
Project "Construction of dairy farms" LLP "Synagro". Project cost-2.5 billion tenge, working places-50.
- Project "Construction of an industrial automated greenhouse on an area of 2.2 hectares in Kyzylorda" kazagromir LLP. The project cost is 1.1 billion tenge, working places – 30.
-The Project" creation of a multifunctional storage of agricultural products "by SENIM-Tabigat LLP. The project cost is 500.0 million tenge, jobs – 33.
- the Project "Construction of an industrial complex for the extraction, processing and enrichment of salt" by "BSK Karatau"LLP. The project cost is 2.9 billion tenge, jobs – 500.
- the project " construction of a meat processing plant "of" Syr Marzhany " LLP. The project cost is 832.5 million tenge, jobs–30 .
In addition, the region is replenished with investment projects in such areas as breeding ostriches for ostrich meat and eggs, breeding valuable types of goats for wool and meat, and production of sunflower oil.
Fourth, there are 6 industrial zones with a total area of 904.9 hectares in the region. To date, 243.5 hectares of land have been developed from the allocated land plots for 55 projects with a total cost of 197 billion tenge. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each industrial zone has a developed infrastructure (energy and water supply, natural gas supply, etc.). out
of 55 projects, 21 projects worth 65.3 billion tenge were implemented, where 339 jobs were created.
In January-may 2020, the introduced projects produced products in the amount of 782.6 million tenge.
Fifth, since the beginning of the year, 5 road shows have been organized to attract investment to the region. This includes 2 trips to foreign countries (Federal Republic of Germany, Dortmund, Republic of Uzbekistan, Urgench) and 3 visits to the Kyzylorda region (1 Korean, 1 Portuguese and 1 European).As a result, 5 memoranda were signed. on
January 18-22, 2020, under the chairmanship of Deputy Prime Minister Sklyar R. V., a regional delegation visited the Federal Republic of Germany in Dortmund.
As part of the delegation's trip, a Round table on the topic was held at the WILO site in Dortmund: "Kazakhstan and Germany: expanding economic cooperation", organized by the Embassy of Kazakhstan in Germany in cooperation with the company "WILO" with the support of the Eastern Committee of the German economy and the chamber of Commerce and industry of Dortmund.
In addition, on January 21, a meeting was held with the General Director of the German company "ICMD International Corporation of Metal and Alloy Development Holding Gmbh" Jürgen Heins, and the General Director of the Polish company "EMP Energy and Metallurgical Products Sp. z o. O." Ryszard Janiszewski. As a result of the meeting, a trilateral Memorandum was signed on the implementation of the project "construction of a Ferroalloy plant in the city of Kyzylorda" between the akimat of the Kyzylorda region and the above-mentioned companies.
On January 15, 2020, a visit of Portuguese investors to the Kyzylorda region was organized. In the framework of the visit of the Portuguese companies "Edifier", "Renovation Group", "Bodies Consulting" met with the Governor of the region K. Iskakov and signed a Memorandum "on the implementation of projects to create power plants using renewable energy sources in the Kyzylorda region".
February 25-26, 2020 delegation of the Kyzylorda region headed by the Governor of the region K. Iskakov paid a working visit to Urgench to participate in the II forum of interregional cooperation between the Republic of Uzbekistan and the Republic of Kazakhstan. As a result of the forum, 3 memoranda were signed between the akimat of the Kyzylorda region and the Khokimiyat of the Khorezm region.
In addition, B2B and B2G meetings held in the framework of the forum akimat of Kyzylorda region and the region's businessmen held talks on joint projects with the heads of Uzbek companies producing mineral fertilizers "Uzkimesanoat" and processing of gourds "Organicsolutions".
In this regard, in April this year, a working visit of the Director and agronomist of the company "Organicsolutions" took place, who visited a number of rural districts of the Shieli district and held talks with the heads of local farms.
As a result of the meeting, the farms "Tonkeris and K", "Zherzhomart D" LLP and "Bala bi-2004" purchased 41 thousand pieces (in the amount of 14,238,000 tenge) of Apple, grape and other fruit trees, and planted Apple orchards on an area of 50 hectares and grape orchards on an area of 2 hectares.
Investment potential of the region
(January-February)
In the long term (next 10 years) socio-economic development of the region will be based on the development of 5 promising sectors:
First, considering natural features of the region and that the region is rich in minerals, further development of the mining industry. Mainly in the region are rich sources of minerals such as vanadia, uranium, lead, zinc and others. Project implementation will continue for the development of deposits:
- "Construction of a processing plant and expansion of the Shalkiya mine with an annual capacity of 4 million tons of lead-zinc ore" - initiator of "Shalkiya Zinc" LLP project Cost-168 billion tenge, jobs-1540.
-Expansion of production for processing ore wannadies – LLP "Balausa processing company". The project cost is 35.0 billion tenge, new jobs–649. Implementation period 2012-2019gods.
Second, by processing local minerals, it is planned to develop the industry for the production of building materials. The following projects are planned to be implemented in this direction:
- Project" lime production Plant "of Premium class Stroy LLP. The project cost is 140 million tenge, jobs – 26. The project was launched in October 2018. According to the results of 2019, 11.4 thousand tons of products were produced for 193.3 thousand tenge, in January-February 2020-2.4 thousand tons of products worth 40.8 million tenge..
- Project "Construction of a plant for the production and processing of flat glass with a capacity of 197,100 tons / year". The cost of the project is 42.1 billion tenge, workplaces – 226;
- The project "construction of a plant for the production of ceramic products" of the Turkish company "Yildizlar SSS Holding". The project cost is 43.5 billion tenge. Construction is planned for 2020.
In 2018, the project "construction of a cement plant" was put into operation. The initiator of the project LLP "Shieli Company Gezhouba Cement", at a cost of 64 billion tenge, workplaces – 260. It should be noted that the project was put into operation ahead of schedule in December 2018. At the end of 2019, we produced 380 thousand tons of cement, worth 6.1 billion tenge, including 39 thousand tons exported to Uzbekistan. In January-February 2020, 47.3 thousand tons of products were produced, of which 31 thousand tons were exported.
Third, in order to ensure food security, it is necessary to further develop the traditional agro-industrial complex in our region. The following projects will be implemented in this direction:
Project "Construction of dairy farms" LLP "Synagro". Project cost-2.5 billion tenge, working places-50.
- Project "Construction of an industrial automated greenhouse on an area of 2.2 hectares in Kyzylorda" kazagromir LLP. The project cost is 1.1 billion tenge, working places – 30.
-The Project" creation of a multifunctional storage of agricultural products "by SENIM-Tabigat LLP. The project cost is 500.0 million tenge, jobs – 33.
- the Project "Construction of an industrial complex for the extraction, processing and enrichment of salt" by "BSK Karatau"LLP. The project cost is 2.9 billion tenge, jobs – 500.
- the project " construction of a meat processing plant "of" Syr Marzhany " LLP. The project cost is 832.5 million tenge, jobs–30 .
In addition, the region is replenished with investment projects in such areas as breeding ostriches for ostrich meat and eggs, breeding valuable types of goats for wool and meat, and production of sunflower oil.
Fourth, there are 6 industrial zones with a total area of 904.9 hectares in the region. To date, 223.2 hectares of land have been developed from the allocated land plots for 55 projects with a total cost of 197 billion tenge. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each industrial zone has a developed infrastructure (energy and water supply, natural gas supply, etc.). out
of 55 projects, 21 projects worth 65.3 billion tenge were implemented, where 339 jobs were created.
In 2019, the introduced projects produced products worth 9.2 billion tenge.
In 2019, 5 projects worth 166 million tenge were introduced, with the creation of 14 new places.
Fifth, in 2019, 28 road shows were organized to attract investment to the region. This includes 13 trips to foreign countries (Russia - 3 times Moscow, Belgorod, 3 times Turkey – Ankara, Konya, Istanbul, Uzbekistan - Tashkent, UAE - Dubai, Nur – Sultan and Almaty, China - 3 Beijing, Shanghai, Qingdao) and 15 trips to the Kyzylorda region (3 Russian, 3 Chinese and 4 Korean, 2 Uzbek, 1 Tajik, 1 Swiss, 1 Kazakh).
On may 16-17, 2019, a delegation of the Kyzylorda region headed by akim of the region K. Kusherbayev paid a working visit to the city of Nursultan to participate in the XII Astana economic forum.
However, within the region the akim of the region held meetings with the South Korean investor Pak pan Suk, with the mayor of Tallinn, Republic of Estonia, Mikhail Calverton, with the Manager of IFCA Kelimbetov K. N., the President of the company "Petro Kazakhstan Inc" Juan Sanson.
During the meetings, the akimat of the Kyzylorda region and the Korean company "K2AT" signed a Memorandum for the amount of 100 million US dollars on the project "Creation of production facilities for growing tomatoes with an anti-cancer effect".
On may 15, 2019, the delegation of the Kyzylorda region took part in the II forum of interregional cooperation between Kazakhstan and China on the theme"Industrial cooperation".
Regional products of JSC "Aral-Tuz" and LLP "AB Invest Group"were presented during the event.
In addition, on may 22-29, 2019, the delegation of the Kyzylorda region visited Beijing, Shanghai, Qingdao, Zhengzhou, and Nanjing of the people's Republic of China.
Within the framework of the forum, meetings were held with Yang Xijun, Deputy mayor of Qingdao, and the leadership of the China-SCO regional trade and economic cooperation Pilot zone, Vice mayor of Zhengzhou (Henan province) Wang Zhengfeng, head of the Henan Committee of the Ministry of international trade of China, with the Deputy Governor of Jiangsu province (Nanjing) Guo yuan Qian, with business representatives of the above-mentioned regions of China and presented projects that require investment in the Kyzylorda region. In addition, based on the results of the meetings, the Chinese side expressed interest in limestone and agricultural products of our region, as well as in growing soybeans in the region. As a result of the negotiations, AB Invest group for the production of safflower oil in the Kyzylorda region signed a Memorandum of cooperation with the Pilot zone in order to export its products to the Chinese market.
On June 26, 2019, the Department of industrial and innovative development held the IV international Internet forum on " human capital Development: new challenges and opportunities for the region". The main goal of the forum is to provide a single platform for international and domestic speakers in the field of human capital development to discuss the prospects for education and employment in the region, new challenges and opportunities in the context of dynamic changes in the world labor market in the context of the Fourth industrial revolution. The forum was attended by representatives of 3 countries, such as Russia, Tatarstan, and Singapore. The forum presented ongoing projects in the field of education.
On July 16, 2019, there was a working trip to the Kyzylorda region of the Korean investment company k2at LLP. During the visit, Deputy akim of the Kyzylorda region B. Namayev met with representatives of the investment company k2at LLP and signed memoranda between the akimat of the Kyzylorda region and representatives of k2at LLP on the projects " Creation of industrial enterprises in the newly created FEZ "Baikonur": projects to create production facilities for processing tomatoes with an anti-cancer effect and other products using advanced biotechnologies "and"Construction of recreation and entertainment facilities, including theme parks, hotels, water parks, etc.".
At the same time, the consuls General of the Russian Federation, the Republic of Uzbekistan, and the Republic of Tajikistan visited the Kyzylorda region. During the visit, the guests met with the Governor of the region. Iskakov, where the region's investment potential for attracting investment was presented.
In addition, in order to attract investment to the Kyzylorda region, the XI international investment forum "Baikonyr Invest" was held in Kyzylorda on November 30 - December 1, 2019.: "Kyzylorda: sustainable growth, new horizons for investment cooperation". The forum was attended by representatives of 11 countries near and far abroad (Iran, France, Germany, Macedonia, the Netherlands, Korea, Canada, USA, China, Russian Federation, UAE). Including ambassadors Extraordinary And Plenipotentiary of the Islamic Republic of Iran saber Majid Samadzadeh, the Republic of Korea Kim Dae-Sik, the Kingdom of the Netherlands Andre Carstens, North Macedonia Medjiti Muarem. As well as representatives of foreign and domestic business communities, heads of investment companies with whom joint work on the implementation of major projects is being steadily carried out (Korean company k2at LLP, French company Total Eren) and representatives of research institutes.
The forum included a Plenary session, B2B, B2G, G2G meetings, an exhibition of projects requiring investment, an exhibition of local producers, and 3 section works on the following topics: "Opportunities for the development of farming and livestock cluster in agriculture", "Prospects for the development of public-private partnership in the new conditions", " FEZ "Baikonur – - a promising platform for project implementation".
In addition, during the event, the regional akimat organized an excursion tour to the Baikonur cosmodrome and the Korkyt ATA memorial complex.
Investment potential of the region
(January-November)
In the long term (next 10 years) socio-economic development of the region will be based on the development of 5 promising sectors:
First, considering natural features of the region and that the region is rich in minerals, further development of the mining industry. Mainly in the region are rich sources of minerals such as vanadia, uranium, lead, zinc and others. Project implementation will continue for the development of deposits:
- "Construction of a processing plant and expansion of the Shalkiya mine with an annual capacity of 4 million tons of lead-zinc ore" - initiator of "Shalkiya Zinc" LLP project Cost-168 billion tenge, jobs-1540.
-Expansion of production for processing ore wannadies – LLP "Balausa processing company". The project cost is 35.0 billion tenge, new jobs–649. Implementation period 2012-2019gods.
Second, by processing local minerals, it is planned to develop the industry for the production of building materials. The following projects are planned to be implemented in this direction:
- Project" lime production Plant "of Premium class Stroy LLP. Project cost-140 million tenge, jobs-26.
- Project "Construction of a plant for the production and processing of flat glass with a capacity of 197,100 tons / year". The cost of the project is 42.1 billion tenge, workplaces – 226;
- The project "construction of a plant for the production of ceramic products" of the Turkish company "Yildizlar SSS Holding". The project cost is 43.5 billion tenge. Construction is planned for 2020.
In 2018, the project "construction of a cement plant" was put into operation. The initiator of the project LLP "Shieli Company Gezhouba Cement", at a cost of 64 billion tenge, workplaces – 260. It should be noted that the project was put into operation ahead of schedule in December 2018. At the end of 2019, we produced 380 thousand tons of cement, worth 6.1 billion tenge, including exports of 39 thousand tenge.
Third, in order to ensure food security, it is necessary to further develop the traditional agro-industrial complex in our region. The following projects will be implemented in this direction:
Project "Construction of dairy farms" LLP "Synagro". Project cost-2.5 billion tenge, working places-50.
- Project "Construction of an industrial automated greenhouse on an area of 2.2 hectares in Kyzylorda" kazagromir LLP. The project cost is 1.1 billion tenge, working places – 30.
-The Project" creation of a multifunctional storage of agricultural products "by SENIM-Tabigat LLP. The project cost is 500.0 million tenge, jobs – 33.
- the Project "Construction of an industrial complex for the extraction, processing and enrichment of salt" by "BSK Karatau"LLP. The project cost is 2.9 billion tenge, jobs – 500.
- the project " construction of a meat processing plant "of" Syr Marzhany " LLP. The project cost is 832.5 million tenge, jobs–30 .
In addition, the region is replenished with investment projects in such areas as breeding ostriches for ostrich meat and eggs, breeding valuable types of goats for wool and meat, and production of sunflower oil.
Fourth, there are 6 industrial zones with a total area of 909.9 hectares in the region. To date, 216 hectares of land have been developed from the allocated land plots for 50 projects with a total cost of 193.8 billion tenge. About 6.7 billion tenge was allocated from the budget for the construction of infrastructure. Each industrial zone has a developed infrastructure (energy and water supply, natural gas supply, etc.). out
of 50 projects, 21 projects worth 65.3 billion tenge were implemented, where 346 jobs were created.
According to the results of 11 months of 2019, the introduced projects produced products worth 5.3 billion tenge.
Since the beginning of the year, 5 projects worth 166 million tenge have been introduced, with the creation of 14 new places.
Fifth, in 2019, 28 road shows were organized to attract investment to the region. This includes 13 trips to foreign countries (Russia - 3 times Moscow, Belgorod, 3 times Turkey – Ankara, Konya, Istanbul, Uzbekistan - Tashkent, UAE - Dubai, Nur – Sultan and Almaty, China - 3 Beijing, Shanghai, Qingdao) and 15 trips to the Kyzylorda region (3 Russian, 3 Chinese and 4 Korean, 2 Uzbek, 1 Tajik, 1 Swiss, 1 Kazakh).
On may 16-17, 2019, a delegation of the Kyzylorda region headed by akim of the region K. Kusherbayev paid a working visit to the city of Nursultan to participate in the XII Astana economic forum.
However, within the region the akim of the region held meetings with the South Korean investor Pak pan Suk, with the mayor of Tallinn, Republic of Estonia, Mikhail Calverton, with the Manager of IFCA Kelimbetov K. N., the President of the company "Petro Kazakhstan Inc" Juan Sanson.
During the meetings, the akimat of the Kyzylorda region and the Korean company "K2AT" signed a Memorandum for the amount of 100 million US dollars on the project "Creation of production facilities for growing tomatoes with an anti-cancer effect".
On may 15, 2019, a delegation of the Kyzylorda region headed by Deputy akim of the region M. Imandosov took part in the II forum of interregional cooperation between Kazakhstan and China on the topic"Industrial cooperation".
Regional products of JSC "Aral-Tuz" and LLP "AB Invest Group"were presented during the event.
In addition, on may 22-29, 2019, a delegation of the Kyzylorda region headed by Deputy akim of the region M. Imandosov visited Beijing, Shanghai, Qingdao, Zhengzhou, and Nanjing of the people's Republic of China.
Within the framework of the forum, meetings were held with Yang Xijun, Deputy mayor of Qingdao, and the leadership of the China-SCO regional trade and economic cooperation Pilot zone, Vice mayor of Zhengzhou (Henan province) Wang Zhengfeng, head of the Henan Committee of the Ministry of international trade of China, with the Deputy Governor of Jiangsu province (Nanjing) Guo yuan Qian, with business representatives of the above-mentioned regions of China and presented projects that require investment in the Kyzylorda region. In addition, based on the results of the meetings, the Chinese side expressed interest in limestone and agricultural products of our region, as well as in growing soybeans in the region. As a result of the negotiations, AB Invest group for the production of safflower oil in the Kyzylorda region signed a Memorandum of cooperation with the Pilot zone in order to export its products to the Chinese market.
On June 26, 2019, the Department of industrial and innovative development held the IV international Internet forum on " human capital Development: new challenges and opportunities for the region". The main goal of the forum is to provide a single platform for international and domestic speakers in the field of human capital development to discuss the prospects for education and employment in the region, new challenges and opportunities in the context of dynamic changes in the world labor market in the context of the Fourth industrial revolution. The forum was attended by representatives of 3 countries, such as Russia, Tatarstan, and Singapore. The forum presented ongoing projects in the field of education.
On July 16, 2019, there was a working trip to the Kyzylorda region of the Korean investment company k2at LLP. During the visit, Deputy akim of the Kyzylorda region B. Namayev met with representatives of the investment company k2at LLP and signed memoranda between the akimat of the Kyzylorda region and representatives of k2at LLP on the projects " Creation of industrial enterprises in the newly created FEZ "Baikonur": projects to create production facilities for processing tomatoes with an anti-cancer effect and other products using advanced biotechnologies "and"Construction of recreation and entertainment facilities, including theme parks, hotels, water parks, etc.".
At the same time, the consuls General of the Russian Federation, the Republic of Uzbekistan, and the Republic of Tajikistan visited the Kyzylorda region. During the visit, the guests met with the Governor of the region. Iskakov, where the region's investment potential for attracting investment was presented.
In addition, in order to attract investment to the Kyzylorda region, the XI international investment forum "Baikonyr Invest" was held in Kyzylorda on November 30 - December 1, 2019.: "Kyzylorda: sustainable growth, new horizons for investment cooperation". The forum was attended by representatives of 11 countries near and far abroad (Iran, France, Germany, Macedonia, the Netherlands, Korea, Canada, USA, China, Russian Federation, UAE). Including ambassadors Extraordinary And Plenipotentiary of the Islamic Republic of Iran saber Majid Samadzadeh, the Republic of Korea Kim Dae-Sik, the Kingdom of the Netherlands Andre Carstens, North Macedonia Medjiti Muarem. As well as representatives of foreign and domestic business communities, heads of investment companies with whom joint work on the implementation of major projects is being steadily carried out (Korean company k2at LLP, French company Total Eren) and representatives of research institutes.
The forum included a Plenary session, B2B, B2G, G2G meetings, an exhibition of projects requiring investment, an exhibition of local producers, and 3 section works on the following topics: "Opportunities for the development of farming and livestock cluster in agriculture", "Prospects for the development of public-private partnership in the new conditions", " FEZ "Baikonur – - a promising platform for project implementation".
In addition, during the event, the regional akimat organized an excursion tour to the Baikonur cosmodrome and the Korkyt ATA memorial complex.
Within the framework of the forum, 24 memoranda and 1 agreement were signed for a total amount of about 100 billion tenge. Among them are memoranda on the implementation of investment projects in the industrial sector 10, the agro-industrial sector 9, as well as in the direction of Public-private partnership 6.