About the work done in the field of construction, architecture and urban planning

Completed works in the field of construction, architecture and urban planning for the 2st quarter of 2023

Public services:
For the provision of public services through the public service center and the web portal of "electronic government" non-profit Joint Stock Company "State Corporation "Government for Citizens":
1) to determine the address of real estate, the total number of applications received is 231. Of these, 39 applications were received through the public service center, 192 applications through the e-government web portal, as well as all applications were satisfied;
2) the total number of applications received for assignment provision of source materials in the development of construction and reconstruction projects (redevelopment and re-equipment) the total number of applications received through the web portal of "electronic government" 19. Number of satisfied requests 19;
3) the total number of requests received through the e-government web portal upon approval of the draft project is 15, the number of satisfied requests is 15.
4) the total number of requests received through the e-government web portal for the issuance of a permit for the complex of works on the subsequent disposal of objects (demolition of buildings and structures) 97, the number of satisfied requests 97.

Construction of individual residential buildings commissioned in Karmakshinsky district:
In the Karmakshi district, according to the target indicator "the total area of residential buildings put into operation" according to the execution plan for 6 months of 2023, the total area is 11460.0 square meters.
Currently, according to the results of 6 months, 77 individual residential buildings with a total cost of 2062800.0 thousand tenge, with a total area of 11460.0 sq. m. have been commissioned in the district, accounting for individual residential buildings commissioned has been transferred to the district statistics department and the regional Department of Construction, Architecture and Urban Planning.
Compared to the corresponding period last year, it amounted to 104.0% (for 6 months of 2022, the number of houses was 82, the total area was 11037.0 sq. m.).

In connection with compliance with the requirements of urban planning regulations on the territory of the district:
In accordance with the detailed planning project developed on the basis of the general plan of the village of Zhosaly, work is underway to provide land plots for individual housing construction on the territory of 171.0 hectares in the neighborhood "Tauelsizdik", located within the village of Zhosaly.
The akimat of the village of Zhosaly registered 1731 appeals of individuals in the queue for a land plot for individual housing construction. Currently, in order to satisfy the applications of registered individuals for the construction of an individual residential building, 900 individuals have been granted consent to land plots and land plots have been provided.

Information about all objects under construction in connection with the development of the district
"Construction of a sports and recreation complex in the village of Zhosaly, Karmakshinsky district, Kyzylorda region" the total cost of the project is 560,013.0 thousand tenge. In 2021, -218,950.0 thousand tenge was allocated from the republican budget. For 2022 allocated: National Fund – 180 000,0 thousand tenge, RB-47676,0 thousand tenge. Contractor organization - PC "Sapak". For 2023 from the OB- 49625.4 thousand tenge. To date, construction work will be introduced.
"Construction of a sports and recreation complex in Akai village of Karmakshinsky district" the total cost of the object is 601470.0 thousand tenge. According to the program "Auyl el besigi" allocated funds for 2022 from the NF – 360 000,0 thousand tenge, RB-138493,0 thousand tenge; OB-55388,0 thousand tenge. Contractor: Umirzak LLP, the cost of the contract is 531308.0 thousand tenge. Allocated funds for 2023 -141919.7 thousand tenge. Construction work is currently underway.

2. Socio-economic indicators of the construction of the district
1) about the objects for which a budget application has been submitted for the purpose of financing projects for which design and estimate documentation has been developed and expertise has been carried out :
The PSD "Construction of a sports complex in the locality of the III International Karmakshinsky district" was developed, expert opinion No. EI-0001/22 of 29.01.2021 was received. The cost of the project is 409.240 million tenge.
The PSD "Construction of a sports complex in the village of Dur Ongar Karmakshinsky district" was developed. Expert opinion No. Frost-03/00196 dated 04.05.2022 was received. The cost of the project is 427,352 million tenge.
The PSD "Construction of a club for 100 seats in the village of Komekbayev of the Karmakshinsky district of the Kyzylorda region" was developed, expert opinion No. YUZHGEKS-0010/22 of 09/26/2022 was received. The project cost is 395.733 million tenge.
The PSD "Construction of a club for 100 seats in the village of Aldashbay of the Karmakshinsky district of the Kyzylorda region" was developed, expert opinion No. KAZE--0256/22 of 11/23/2022 was received. The project cost is 536.086 million tenge
The PSD "Construction of gas supply networks to residential buildings of the Tauelsizdik microdistrict of the village of Zhosaly, Karmakshinsky district" No. KAZE--0174/22 dated 09.09.2022 was developed. The project cost is 798.410 million tenge

Construction works

1) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region"
technical supervision: Altimus LTD LLP
author's supervision: Remproekt LLP
Contractors: Nurtechservice LLP at houses No. 1,2 and No. 4, Kazstroyservice LLP at houses No. 3,5. The facility is transitioning, construction work will continue in 2023.
2) "Construction of five 50-apartment residential buildings in the city of Baikonur. Gas supply. Kyzylorda region"
Designer: "Projectservice" LLP
Total cost of the project: 33,167.0 thousand tenge;
Contractor: Teploenergostroy LLP, construction works will be introduced
3) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Outdoor water supply and sewerage"
Designer: "Projectservice" LLP
Total cost of the project: 79,726.0 thousand tenge;
Contractor: Altyn Aidarly LLP, construction works will be introduced
4) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Heat supply"
Designer: "Projectservice" LLP
Total cost of the project: 248 693.0 thousand tenge;
Contractor: Altyn Aidarly LLP, construction works will be introduced


Completed works in the field of construction, architecture and urban planning for the 1st quarter of 2023Государственные услуги:

For the provision of public services through the public service center and the web portal of "electronic government" non-profit joint stock company "State Corporation" Government for Citizens ":

1) to determine the address of real estate, the total number of applications received was 75. Of these, 4 applications were received through the public service center, 71 applications through the e-government web portal, and all applications were satisfied;

2) the total number of applications received for the assignment of the provision of source materials in the development of construction and reconstruction projects (re-planning and re-equipment) the total number of applications received through the e-government web portal 3. The number of satisfied applications 3;

3) the total number of requests received through the e-government web portal as agreed on the preliminary design 3, the number of satisfied requests 3.

4) the total number of applications received through the e-government web portal for issuing a permit for a set of works for the subsequent disposal of objects (demolition of buildings and structures) 39, the number of satisfied applications 39.

Construction of individual residential buildings put into operation in the Karmakshy district:

In Karmakshy district, according to the target indicator "total area of ​​residential buildings being put into operation" according to the execution plan for 3 months of 2023, the total area is 4790.0 square meters.

In Karmakshy district, according to the target indicator "total area of ​​residential buildings being put into operation" according to the execution plan for 3 months of 2023, the total area is 4790.0 square meters.

Compared to the corresponding period last year, it amounted to 104.8% (for 3 months of 2022, the number of houses is 34, the total area is 4570 sq. m.).

In connection with compliance with the requirements of urban planning regulations in the region:

In accordance with the detailed planning project developed on the basis of the master plan of the Zhosaly settlement, work is underway to provide land plots for individual housing construction on the territory of 171.0 hectares in the Tauelsizdik microdistrict located within the boundaries of the Zhosaly settlement.

The akimat of Zhosaly village registered 1731 applications of individuals in the queue for a land plot for individual housing construction. Currently, in order to satisfy the applications of registered individuals for the construction of an individual residential building, consent to land plots of 900 individuals has been issued and land plots have been provided.

Information about all objects under construction in connection with the development of the area

"Construction of a sports and recreation complex in the village of Zhosaly, Karmakshy district, Kyzylorda region"

The total cost of the project is 560,013.0 thousand tenge. In 2021, -218,950.0 thousand tenge were allocated from the republican budget. Allocated for 2022: National Fund - 180,000.0 thousand tenge, RB-47676.0 thousand tenge. Contracting organization - PK "Sapak". For 2023 from OB - 49625.4 thousand tenge. Construction work will begin today.

"Construction of a sports and recreation complex in the village of Akai, Karmakshy district" the total cost of the facility is 601,470.0 thousand tenge. Under the program "Auyl el besigi" allocated funds for 2022 from the National Fund - 360,000.0 thousand tenge, RB - 138493.0 thousand tenge; OB-55388.0 thousand tenge. Contractor: LLP "Umirzak", the cost of the contract is 531308.0 thousand tenge. The allocated funds for 2023 are 141,919.7 thousand tenge. Construction work is currently underway.Социально-экономические показатели строительства района

1) on objects for which a budget application has been submitted in order to finance projects, for which design estimates have been developed and an examination has been carried out:

The design and estimate documentation "Construction of a sports complex in the settlement III International of the Karmakshy district" was developed, an expert opinion No. EI-0001/22 dated 01/29/2021 was received. The cost of the project is 409.240 million tenge.

The design and estimate documentation “Construction of a sports complex in the village of Dur Ongar, Karmakshy district” was developed, an expert opinion No. Frost-03/00196 of 04.05.2022 was received.

Design and estimate documentation "Construction of a club for 100 seats in the village of Komekbaev, Karmakshy district, Kyzylorda region" was developed; The cost of the project is 395.733 million tenge.

Design and estimate documentation "Construction of a club for 100 seats in the village of Komekbaev, Karmakshy district, Kyzylorda region" was developed; The cost of the project is 395.733 million tenge.

The design and estimate documentation for “Construction of gas supply lines to residential buildings in the Tauelsizdik microdistrict of the Zhosaly village of the Karmakshy district” No. KAZE-0174/22 dated 09.09.2022 was developed. Project cost - 798.410 million tenge

Construction works

1) "Construction of five 50-apartment residential buildings in the city of Baikonyr, Kyzylorda region"

technical supervision: LLP "Altimus LTD"

architectural supervision: LLP "Remproekt"

Contractors: LLP "Nurtekhservis" at houses No. 1,2 and No. 4, LLP "Kazstroyservis" at houses No. 3,5. The facility is movable, construction work will continue in 2023.

2) “Construction of five 50-apartment residential buildings in the city of Baikonyr. Gas supply. Kyzylorda region"

Designer: ProjectService LLP

Total cost of the project: 33,167.0 thousand tenge;

Contractor: Teploenergostroy LLP, construction work will be started

3) “Construction of five 50-apartment residential buildings in the city of Baikonyr, Kyzylorda region. External water supply and sewerage»

Designer: ProjectService LLP

Total cost of the project: 79,726.0 thousand tenge;

Contractor: Altyn Aidarly LLP, construction work will be started

4) “Construction of five 50-apartment residential buildings in the city of Baikonyr, Kyzylorda region. Heat supply"

Designer: ProjectService LLP

Total cost of the project: 248,693.0 thousand tenge;

Contractor: Altyn Aidarly LLP, construction work will be started


Completed works in the field of construction, architecture and urban planning for the first quarter of 2022

Public services:

For the provision of public services through the public service center and the web portal of "electronic government" non-profit Joint Stock Company "State Corporation "Government for Citizens":

1) to determine the address of the real estate, the total number of applications received is 134. Of these, 6 applications were received through the public service center, 128 applications through the e-government web portal, as well as all applications were satisfied;

2) the total number of applications received for assignment provision of source materials in the development of construction and reconstruction projects (redevelopment and re-equipment) the total number of applications received through the web portal of "electronic government" 8. The number of satisfied applications 8;

3) the total number of requests received through the e-government web portal upon approval of the draft project 4, the number of satisfied requests 4.

Construction of individual residential buildings commissioned in Karmakshinsky district:

In the Karmakshi district, according to the target indicator "the total area of residential buildings put into operation" according to the execution plan for 3 months of 2022, the total area is 4570.0 square meters.

Currently, according to the results of 3 months, 34 individual residential buildings with a total cost of 316570.0 thousand tenge, with a total area of 4570.0 sq. m. have been commissioned in the district, accounting for individual residential buildings commissioned has been transferred to the district statistics department and the regional Department of Construction, Architecture and Urban Planning.

Compared to the corresponding period last year, it amounted to 101.2% (for 3 months of 2021, the number of houses was 31, the total area was 4515.0 sq. m.).

In connection with compliance with the requirements of urban planning regulations on the territory of the district:

In accordance with the detailed planning project developed on the basis of the general plan of the village of Zhosaly, work is underway to provide land plots for individual housing construction on the territory of 171.0 hectares in the neighborhood "Tauelsizdik", located within the village of Zhosaly.

The akimat of the village of Zhosaly registered 1731 appeals of individuals in the queue for a land plot for individual housing construction. Currently, in order to satisfy the applications of registered individuals for the construction of an individual residential building, 900 individuals have been granted consent to land plots and land plots have been provided.

Information about all objects under construction in connection with the development of the district

"Construction of a sports and fitness complex in the village of Zhosaly, Karmakshinsky district, Kyzylorda region" the total cost of the project is 560,013.0 thousand tenge. In 2021, -218,950.0 thousand tenge was allocated from the republican budget. For 2022 allocated: National Fund – 180 000,0 thousand tenge, RB-47676,0 thousand tenge. The contractor organization - Sapak LLP, construction works will be introduced today.

"Construction of a club for 100 seats in the village of Kuandariya of the Karmakshinsky district of the Kyzylorda region" the total cost of the object is 199492.0 thousand tenge. Customer: GU "Regional Department of Construction, Architecture and Urban Planning". Contractor "AKHAT+GS" LLP, author's supervision: "Project-Service" LLP. Technical supervision: Zhana Gasyr LLP. A contract for the amount of 165288,415 thousand tenge was concluded between the customer and the contractor. From the regional budget for 2021 100 000,0 thousand tenge. 22,403.0 thousand tenge is provided for 2022.

 


Socio-economic indicators of the construction of the district

1) about the objects for which a budget application has been submitted for the purpose of financing projects for which design and estimate documentation has been developed and expertise has been carried out :

The design and estimate documentation "Construction of a leading gas pipeline and intra-block gas distribution networks of the V.N. Toretam of the Karmakshinsky district" was developed, and the expert opinion No. 19-0290/21 of 07/23/2021 was received. The project cost is 1526.211 million tenge.

The design and estimate documentation "Construction of a leading gas pipeline and intra-block gas distribution networks of the V.N. Akai Karmakshinsky district" was developed, and the expert opinion No. 19-0290/21 of 05.04.2021 was received. The project cost is 979.129 million tenge.

"Reconstruction of a water intake structure in the settlement of Aldashbay Akhun of the Karmakshinsky district of the Kyzylorda region" was developed by the PSD, and the expert opinion No.KSKKAZ-0025/21 of 08/16/2021 was received. The project cost is 229.720 million tenge.

The PSD "Reconstruction of water intake in Komekbayev settlement of Karmakshinsky district of Kyzylorda region" was developed, expert opinion No. E2016-0006/21 of 08/27/2021 was received. The project cost is 291.196 million tenge.

The PSD "Reconstruction and expansion of the water intake in the village of Karmakshy of the Karmakshinsky district of the Kyzylorda region" was developed, expert opinion No. E2016-0007/21 of 27.08.2021 was received. The project cost is 236.138 million tenge.

The PSD "Construction of a sports complex in the locality of the III International Karmakshinsky district" was developed, expert opinion No. EI-0001/22 of 29.01.2021 was received. The cost of the project is 409.240 million tenge.

2) projects under development:

Development of design and estimate documentation and examination of the working project "Construction of a 100-seat club in the village of Komekbayev, Karmakshinsky district, Kyzylorda region"

Development of design and estimate documentation and examination of the working project "Construction of a 100-seat club in the village of Aldashbai, Karmakshinsky district, Kyzylorda region"

Development of design and estimate documentation, examination of the working project "Construction of gas supply networks to residential buildings of the Tauelsizdik microdistrict of the village of Zhosaly Karmakshinsky district"

Development of design and estimate documentation, examination of the working project "Reconstruction of the main water pipeline of the Oktyabrsky group water pipeline from NS No. 3 Irkol to No. 4 Zhosaly and drilling of 2 SLE. Karmakshinsky district" filed

Development of design and estimate documentation, examination of the working project "Construction of a sports complex in the village of Dur Ongar Karmakshinsky district"

Construction works

1) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region"

Technical supervision: Altimus LTD LLP

author's supervision: Remproekt LLP

Contractors: Nurtechservice LLP at houses No. 1,2 and No. 4, Kazstroyservice LLP at houses No. 3,5. The facility is transitioning, construction work will continue in 2022.

2) "Construction of five 50-apartment residential buildings in the city of Baikonur. Gas supply. Kyzylorda region"

Designer: "Projectservice" LLP

Total cost of the project: 33,167.0 thousand tenge;

Contractor: Teploenergostroy LLP, construction works will be introduced

3) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Outdoor water supply and sewerage"

Designer: "Projectservice" LLP

Total cost of the project: 79,726.0 thousand tenge;

Contractor: Altyn Aidarly LLP, construction works will be introduced

4) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Heat supply"

Designer: "Projectservice" LLP

Total cost of the project: 248 693.0 thousand tenge;

Contractor: Altyn Aidarly LLP, construction works will be introduced


Completed works in the field of construction, architecture and urban planning at the end of 2021

Information about all objects under construction in connection with the development of the district
For the object "Construction of a camp for children's recreation in the summer-winter period in the Karmakshinsky district", sums were allocated from the regional budget from 2017-2021 and construction and installation works were introduced. In December of this year, the construction of this facility was completed and put into operation.
The design and estimated cost of the object "Construction of the water supply system of the Toretam settlement of Karmakshi district" is 168.443 million tenge. 143.888 million tenge was allocated from the republican budget for this project, 15.987 million tenge was allocated from the regional budget. to date, a public procurement competition has been held, according to the results of which Daneker LLP was recognized as the winner. The contractual amount of construction and installation works is 137876.141 million tenge. The facility has been put into operation.
"Construction of a sports and fitness complex in the village of Zhosaly, Karmakshinsky district, Kyzylorda region" the total cost of the project is 560,013.0 thousand tenge. In 2021, -218,950.0 thousand tenge was allocated from the republican budget. The contractor organization - Sapak LLP, construction works will be introduced today. The facility is transitioning, construction work will continue in 2022.

2. Socio-economic indicators of the construction of the district
1) about the objects for which a budget application has been submitted for the purpose of financing projects for which design and estimate documentation has been developed and expertise has been carried out :
The design and estimate documentation "Construction of a leading gas pipeline and intra-block gas distribution networks of the V.N. Toretam of the Karmakshinsky district" was developed, and the expert opinion No. 19-0290/21 of 07/23/2021 was received. The project cost is 1526.211 million tenge. A budget application has been submitted to the regional Department of Energy and Housing and Communal Services.
The design and estimate documentation "Construction of a leading gas pipeline and intra-block gas distribution networks of the V.N. Akai Karmakshinsky district" was developed, and the expert opinion No. 19-0290/21 of 05.04.2021 was received. The project cost is 979.129 million tenge. A budget application has been submitted to the regional Department of Energy and Housing and Communal Services.
"Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Landscaping" was developed by the PSD, and the expert opinion No. ECLIS-0122/20 of 12/21/2020 was received. The project cost is 256.939 million tenge. A budget application has been submitted to the Regional Department of Construction, Architecture and Urban Planning.
"Reconstruction of a water intake structure in the settlement of Aldashbay Akhun of the Karmakshinsky district of the Kyzylorda region" was developed by the PSD, and the expert opinion No.KSKKAZ-0025/21 of 08/16/2021 was received. The project cost is 229.720 million tenge. A budget application has been submitted to the regional Department of Energy and Housing and Communal Services.
"Construction to provide the Fish Shop project with external electrical networks of the Karmakshinsky district of the Kyzylorda region" was developed by the PSD, and the expert opinion No. KAZPE -0010/21 dated 04/23/2021 was received. The cost of the project is 306.897 million tenge. A budget application has been submitted to the regional Department of Energy and Housing and Communal Services.


2) projects for which a budget application has been submitted for the development of design estimates and expertise:
A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economics and Budget Planning for the development of design and estimate documentation and the examination of the working project "Construction of a club for 100 seats in the village of Komekbayev in the Karmakshinsky district of the Kyzylorda region".
A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economics and Budget Planning for the development of design and estimate documentation and the examination of the working project "Construction of a club for 100 seats in the village of Karmakshi in the Karmakshi district of the Kyzylorda region".
A budget application for the amount of 14.046 million tenge was submitted to the district Department of Economics and Budget Planning for the development of design and estimate documentation, the examination of the working project "Construction of gas supply networks to residential buildings of the Tauelsizdik microdistrict of the village of Zhosaly, Karmakshinsky district".
For the development of design and estimate documentation, examination of the working project "Reconstruction of the main water pipeline of the Oktyabrsky group water pipeline from NS No. 3 Irkol to No. 4 Zhosaly and drilling of 2 SLE. Karmakshinsky district " submitted a budget application for the amount of 21.178 million tenge to the district Department of Economics and Budget planning.
A budget application for the amount of 5,234 million tenge was submitted to the district Department of Economics and Budget planning for the development of design and estimate documentation, the examination of the working project "Construction of a sports complex in the village of Dur Ongar Karmakshinsky district".

Construction works
1) "Construction of the water supply system of Toretam settlement of Karmakshinsky district of Kyzylorda region"
Contractor: Daneker LLP
technical supervision: Altimus LTD LLP
author's supervision: Kyzylordavodgazproekt LLP
Total project cost: 168 443.0 thousand tenge
Allocated funds: 159875.0 thousand tenge (RB-143888.0; OB-15987.0 thousand tenge)
the object was put into operation.

2) "Reconstruction of water supply and sanitation systems of the city of Baikonur, Kyzylorda region. I-th queue, I-th queue. Water disposal"
Total cost of the project: 926 760.0 thousand tenge;
Technical supervision: Altimus LTD LLP
author's supervision: Neftegazengineering LLP
Allocated funds: 901,208.0 thousand tenge (RB - 808,532.0; OB -92,676.0 thousand tenge)
general contractor: QazConstructions LLP the
object is being prepared for operation.

3) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region"
technical supervision: Altimus LTD LLP
author's supervision: Remproekt LLP
Contractors: Nurtechservice LLP at houses No. 1,2 and No. 4 , Kazstroyservice LLP at houses No. 3,5
The facility is transitioning, construction work will continue in 2022.

4) "Construction of five 50-apartment residential buildings in the city of Baikonur. Gas supply. Kyzylorda region"
Designer: "Projectservice" LLP
Total cost of the project: 33,167.0 thousand tenge;
Allocated funds: RB-29,919.0 thousand tenge;
Contractor: Teploenergostroy LLP, construction works will be introduced

5) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Outdoor water supply and sewerage"
Designer: "Projectservice" LLP
Total cost of the project: 79,726.0 thousand tenge;
Allocated funds: RB -68 818.0 thousand tenge; OB-7646.0 thousand tenge
Contractor: Altyn Aidarly LLP, construction works will be introduced

6) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Heat supply"
Designer: "Projectservice" LLP
Total cost of the project: 248 693.0 thousand tenge;
Allocated funds: RB-218 229.0 thousand tenge; OB-24247.0 thousand tenge
Contractor: Altyn Aidarly LLP, construction works will be introduced


Completed works in the field of construction, architecture and urban development for the third quarter of 2021

Public services:

Public services through the public service center and the e-government web portal non-profit Joint-stock Company " State Corporation "Government for Citizens":

1) to determine the real estate address, the total number of applications received is 596. Of these, 46 applications were received through the public service center, 550 applications were received through the e-government web portal, and all applications were satisfied;

2) total number of applications received for assignment provision of source materials for the development of construction and reconstruction projects (redevelopment and re-equipment) total number of applications received through the e-government web portal 17. Number of satisfied requests 17;

3) the total number of requests received through the e-government web portal upon approval of the draft 10, the number of satisfied requests 10.

Construction of individual residential buildings commissioned in Karmakshi district:

In Karmakshi district, according to the target indicator "total area of residential buildings put into operation", according to the execution plan for 9 months of 2021, the total area is 23,840,0 square meters.

Currently, according to the results of 9 months, 146 individual residential buildings with a total cost of 1666,334. 0 thousand tenge, with a total area of 23968. 0 sq. m. Accounting of individual residential buildings put into operation was transferred to the district statistics department and the regional department of construction, architecture and urban planning.

Compared to the corresponding period last year, it amounted to 100.5% (for 9 months of 2020 – 23,840.0 sq. m).

Due to compliance with the requirements of urban planning regulations on the territory of the district:

In accordance with the detailed planning project developed on the basis of the general plan of the village of Zhosaly, work is underway to provide land plots for individual housing construction on the territory of 171.0 hectares in the microdistrict "Tauelsizdik", located within the village of Zhosaly.

The akimat of the village of Zhosaly registered 1,731 requests from individuals in the queue for a land plot for individual housing construction. Currently, in order to satisfy the applications of registered individuals for the construction of an individual residential building, consent for land plots of 900 individuals has been issued and land plots have been granted. 

Information about all objects under construction in connection with the development of the district

100.0 million rubles were allocated from the regional budget for the project "Construction of a summer and winter recreation camp for children in Karmakshi district" in 2017. in 2018-200.0 million tenge, in 2020-50.0 million tenge, and additionally in October 97.839 million tenge was allocated. General Contractor of Promstroyservice-E LLP. Contractual amount of construction and installation works-1 billion rubles.211 million tenge. In 2021, 783,383,200 million tenge was allocated from the regional budget by the decision of the Kyzylorda regional Maslikhat No. 519 dated 11.12.2020 for the completion of construction, the construction of the facility is planned to be completed this year.

The design and estimated cost of the object "Construction of a water supply system in Toretam village of Karmakshi district" is 168.443 million tenge. For this project, 143,888 million tenge was allocated from the republican budget, and 15,987 million tenge was allocated from the regional budget. To date, a public procurement competition has been held, according to the results of which Daneker LLP was recognized as the winner. The contractual amount of construction and installation works is 137876.141 million tenge. To date, the facility is being prepared for operation.

"Construction of a sports and recreation complex in the village of Zhosaly, Karmakshi district, Kyzylorda region" the total cost of the project is 560,013. 0 thousand tenge. Allocated funds from the republican budget are KZT218,950. 0 thousand. Contractor organization-Sapak LLP Construction works will be launched today.

  1. Socio-economic indicators of district construction

1) about the objects for which a budget application has been submitted for the purpose of financing projects, for which design and estimate documentation has been developed and an expert examination has been carried out :

The design plan of the object "Construction of a sports complex in the village of III International of Karmakshinsky district of Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental expert examination No. EI-0045/18 dated 18.11.2018 was obtained. The project cost is 246,857 million tenge. A budget application has been submitted to the Regional Department of Economy and Budget Planning.

The design and estimate documentation "Construction of 19 residential buildings in the village of Zhosaly, Karmakshi district" was developed, and the expert opinion No. PEK-0017/19 dated 04.04.2019 was obtained. The project cost is 390,536 million tenge. A budget application has been submitted to the Regional Department of Construction, Architecture and Urban Development.

The design and estimate documentation "Construction of an outgoing gas pipeline and intra-quarter gas distribution networks in Toretam district of Karmaksha" was developed, and the expert opinion No. 19-0290 / 21 dated 23.07.2021 was obtained. The project cost is 1526.211 million tenge. A budget application has been submitted to the Regional Department of Energy and Housing and Utilities.

The design and estimate documentation "Construction of an outgoing gas pipeline and intra-quarter gas distribution networks of the Akay district of Karmaksha" was developed, and an expert opinion No. 19-0290 / 21 dated 05.04.2021 was obtained. The project cost is 979.129 million tenge. A budget application has been submitted to the Regional Department of Energy and Housing and Utilities.

"Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Improvement" was developed by the POI, and the expert opinion No. ECLIS-0122/20 dated 21.12.2020 was received. The project cost is 256.939 million tenge. A budget application has been submitted to the Regional Department of Construction, Architecture and Urban Development.

"Reconstruction of a water intake structure in the village of Aldashbay Akhun, Karmakshi district, Kyzylorda region" was developed by the POI, and the expert opinion No. KKKAZ-0025/21 dated 16.08.2021 was obtained. The project cost is 229.720 million tenge. A budget application has been submitted to the Regional Department of Energy and Housing and Utilities.

"Construction to provide the Fish Shop project with external electric networks of Karmakshinsky district of Kyzylorda region" was developed and the expert opinion No. KAZPE -0010/21 dated 23.04.2021 was obtained. The project cost is 306.897 million tenge. A budget application has been submitted to the Regional Department of Energy and Housing and Utilities.  

2) projects for which a budget application has been submitted for the development of design estimates and expert evaluation:

A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economy and Budget Planning for the development of design and estimate documentation and expert examination of the working project "Construction of a club for 100 seats in the village of Komekbayev, Karmakshy district, Kyzylorda region".

For the development of design and estimate documentation and conducting an expert examination of the working project "Construction of a 100-seat club in Karmakshi village, Karmakshi district, Kyzylorda region " a budget application for the amount of 8.866 million tenge was submitted to the district Department of Economy and budget planning.

A budget application in the amount of 38.818 million tenge was submitted to the district Department of Economy and Budget planning for the development of design and estimate documentation and expert examination of the working project "Construction of a water intake structure and provision of drinking water to residential buildings in the "Tauelsizdik" microdistrict of the village of Zhosaly, Karmakshi district".

For the development of design and estimate documentation, conducting an expert examination of the working project "Construction of gas supply lines to residential buildings in the Tauelsizdik microdistrict of Zhosaly village, Karmakshi district " a budget application for the amount of 14.046 million tenge was submitted to the district Department of Economy and budget planning.

1) "Construction of water supply system in Toretam village, Karmakshi district, Kyzylorda region"

Contractor: Daneker LLP

Technical supervision: Altimus LTD LLP

Author's supervision: Kyzylordavodgazproekt LLP

Total project cost: 168,443. 0 thousand tenge

Allocated funds: 159875,0 thousand tenge (RB-143888,0; OB - 15987,0 thousand tenge)

contract price: KZT 137,876,141 thousand No. 40 dated 20.04.2021

the object is being prepared for operation.

2) " Reconstruction of water supply and sanitation systems in the city of Baikonur, Kyzylorda region. I-th queue, I-th queue. Water disposal facilities"

Total project cost: 926,760. 0 thousand tenge;

Technical supervision: Altimus LTD LLP

Author's supervision: Neftegazengineering LLP

Allocated funds: 901,208. 0 thousand tenge (RB-808,532. 0; OB -92,676. 0 thousand tenge)

General contractor: QazConstructions LLP signed Contract No. 47 on 14.06.2021. The cost is 773,313,702 thousand tenge.

Construction works will be introduced.

3) "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region"

Technical supervision: Altimus LTD LLP

Author's supervision: Remproekt LLP

Contractors: Nurtehservis LLP for houses No. 1,2 and No. 4, Kazstroyservice LLP for houses No. 3,5

Construction works will be introduced.

4) " Construction of five 50-apartment residential buildings in the city of Baikonur. Gas supply. Kyzylorda region"

Designer:" Projectservice"LLP

Total project cost: 33,167. 0 thousand tenge;

Allocated funds: RB-29,919. 0 thousand tenge;

Contractor: Yerkanat Service LLP

5) " Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Power supply"

Designer:" Projectservice" LLP

Total project cost: 31,447. 0 thousand tenge;

Allocated funds: RB-27169,0 thousand tenge, OB-3018,0 thousand tenge;

6) " Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. External water supply and sewerage"

Designer:" Projectservice" LLP

Total project cost: 79,726. 0 thousand tenge;

Allocated funds: RB -68,818. 0 thousand tenge; OB-7,646. 0 thousand tenge

Contractor: Altyn Aidarly LLP

7) " Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region. Heat supply"

Designer:" Projectservice" LLP

Total project cost: 248,693,0 thousand tenge;

Allocated funds: RB-218,229. 0 thousand tenge; OB-24,247. 0 thousand tenge

Contractor: Altyn Aidarly LLP 


Completed works in the field of construction, architecture and urban development for the second quarter of 2021

1. Information about all objects under construction in connection with the development of the district

According to the project "Construction of a camp for children's recreation in the summer-winter period in the Karmakshy district", 100.0 million tenge was allocated from the regional budget in 2017, 200.0 million tenge for 2018, 50.0 million tenge for 2020, and 97.839 million tenge was additionally allocated in October. The general contractor is Promstroyservice-E LLP. The contractual amount of construction and installation works is -1 billion rubles.211 million tenge. In 2021, 783, 383,200 million tenge was allocated from the regional budget by the decision of the Kyzylorda regional Maslikhat No. 519 of 11.12.2020 for the completion of construction, the construction of the facility is planned to be completed this year.

The design and estimate documentation for the object "Construction of a five-50-apartment residential building in the city of Baikonur" was developed, a positive expert opinion No. PEK-0009/20 of 21.02.2020 was received. The project cost is 3 170, 372 648 million tenge. In order to finance the construction of the project, a budget application was submitted to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan through the Department of Construction, Architecture and Urban Planning of the Kyzylorda region. 1225,223 million tenge was allocated in 2021. To date, public procurement competitions are being held.

"Reconstruction of water supply and sanitation systems in the city of Baikonur, Kyzylorda region. stage 1. " the design and estimated cost of the object is 926.7 million tenge. 808.532 million tenge has been allocated from the republican budget for this project, 92.676 million tenge has been allocated from the regional budget, and a public procurement competition is currently being held.

The design and estimated cost of the object "Construction of the water supply system of the Toretam settlement of Karmaksha district" is 168.443 million tenge. 143.888 million tenge was allocated from the republican budget for this project, 15.987 million tenge was allocated from the regional budget. to date, a public procurement competition has been held, according to the results of which Daneker LLP was recognized as the winner.


Socio-economic indicators of the construction of the district

1) about the objects for which a budget application has been submitted for the purpose of financing projects for which design and estimate documentation has been developed and an expert examination has been carried out :

The POI of the object "Construction of a sports ground on the territory of the Karmakshinsky Agrarian and Technical college in the village of Zhosaly of the Karmakshy district of the Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental examination No. KSE-0072/18 of 13.09.2018 was received. The project cost is 41,009 million tenge. The budget application is submitted to the district Department of Economics and Budget planning.

Development of the PSD "Construction of a club for 100 seats in the village of Kuandariya of the Karmakshinsky district of the Kyzylorda region", 21.11.2018. The conclusion of a comprehensive non-departmental examination No. EI-0047/18 was received. The project cost is 199, 492 million tenge. A budget application has been submitted to the regional Department of Culture, Archives and Documentation.

The POI of the object "Construction of a sports complex in the village of the III International of the Karmakshinsky district of the Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental examination No. EI-0045/18 of 18.11.2018 was received. The project cost is 246, 857 million tenge. A budget application has been submitted to the regional Department of Economics and Budget Planning.

The design and estimate documentation "Construction of 19 residential buildings in the village of Zhosaly, Karmaksha district" was developed, and the expert opinion No. PEK-0017/19 of 04.04.2019 was received. The project cost is 390.536 million tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region" was developed by the PSD, and the expert opinion No. PEK-0009/20 of 21.02.2020 was received.

In addition, in order to provide these residential buildings with engineering infrastructure, the following projects have been developed, budget applications have been submitted to the management.

"Construction of five 50-apartment residential buildings in the city of Baikonur. Electricity supply" the project cost is 31.447 million tenge,

"Construction of five 50-apartment residential buildings in the city of Baikonur. Provision of drinking water and sewerage" the project cost is 79.726 million tenge

"Construction of five 50-apartment residential buildings in the city of Baikonur. Gas supply", the project cost is 33.167 million tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur. The cost of the project is 256.939 million tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur Heat Supply", the project cost is 248.693 million tenge.

 


2) projects for which a budget application is submitted for the development of design and estimate documentation and conducting an expert examination:

A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economics and budget planning for the development of design and estimate documentation and the examination of the working project "Construction of a club for 100 seats in the village of Komekbayev in the Karmakshinsky district of the Kyzylorda region".

A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economics and budget planning for the development of design and estimate documentation and the examination of the working project "Construction of a club for 100 seats in the village of Karmakshi in the Karmakshi district of the Kyzylorda region".

A budget application for the amount of 14.834 million tenge was submitted to the district Department of Economics and budget planning for the development of design and estimate documentation and the examination of the working project " Providing drinking water to residential buildings of the "Tauelsizdik" microdistrict of the Zhosaly settlement of the Karmakshi district"

A budget application for the amount of 14.046 million tenge was submitted to the district Department of Economics and budget Planning for the development of design and estimate documentation, the examination of the working project "Construction of gas supply networks to residential buildings of the Tauelsizdik microdistrict of the Zhosaly settlement of the Karmaksha district".

The design and estimate documentation for the object "Construction of a five-50-apartment residential building in the city of Baikonur" was developed, a positive expert opinion No. PEK-0009/20 of 21.02.2020 was received. The project cost is 3 170, 372 648 million tenge. In order to finance the construction of the project, a budget application was submitted to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan through the Department of Construction, Architecture and Urban Planning of the Kyzylorda region. 1225,223 million tenge was allocated in 2021. To date, public procurement competitions are being held.

"Reconstruction of water supply and sanitation systems in the city of Baikonur, Kyzylorda region. stage 1. " the design and estimated cost of the object is 926.7 million tenge. 808.532 million tenge has been allocated from the republican budget for this project, 92.676 million tenge has been allocated from the regional budget, and a public procurement competition is currently being held.

The design and estimated cost of the object "Construction of the water supply system of the Toretam settlement of Karmaksha district" is 168.443 million tenge. -143.888 million tenge was allocated from the republican budget for this project, -15.987 million tenge was allocated from the regional budget. to date, a public procurement competition has been held, according to the results of which Daneker LLP was recognized as the winner.

1,005 million tenge was allocated from the district budget for the examination of the working project "Construction to provide the Fish Shop project with external electric networks of the Karmakshi district of the Kyzylorda region", in order to conduct the project examination, the department and Kazproektexpertiza LLP signed an agreement No. 11 dated 25.02.2021, an expert opinion was received.

For the development of design and estimate documentation and the examination of the working project "Construction of three 18-apartment residential building in the village of Zhosaly of Karmakshinsky district "15.0 million tenge was allocated from the district budget, the winner of public procurement" Sartobe " LLP developed the design and estimate documentation of the project. A public procurement tender has been organized to obtain the expert opinion.

1) " Construction of the water supply system of the Toretam settlement of the Karmakshinsky district of the Kyzylorda region"

Customer: KSU Karmakshinsky District Department of Construction, Architecture and Urban Planning

Contractor: Daneker LLP"

technical supervision: Altimus LTD LLP"

author's supervision: Kyzylordavodgazproekt LLP"

The total cost of the project: 168 443.0 thousand tenge

Allocated funds: 159875.0 thousand tenge (RB-143888.0; OB-15987.0 thousand tenge)

contract price: 137,876,141 thousand tenge No. 40 dated 20.04.2021

commissioning period: 4 months

2) " Reconstruction of water supply and sanitation systems of the city of Baikonur, Kyzylorda region. I-th queue, I-th queue. Water disposal facilities"

The total cost of the project: 926 760.0 thousand tenge;

Customer: KSU " Karmakshinsky district Department of Construction, Architecture and Urban Planning"

technical supervision: Altimus LTD LLP"

author's supervision: Neftegazengineering LLP"

Allocated funds: 901,208. 0 thousand tenge (RB-808,532. 0; OB -92,676. 0 thousand tenge)

general contractor:" QazConstructions " LLP"

On 14.06.2021, she signed contract No. 47. The cost is 773313702.34 tenge.

3) " Construction of a 50-apartment residential building No. 1 in the city of Baikonur, Kyzylorda region"

Customer: KSU Karmakshinsky District Department of Construction, Architecture and Urban Planning

technical supervision: Altimus LTD LLP"

author's supervision:" Reproject " LLP"

Contractor: Nurtechservice LLP the cost of the contract is 546 854 213.8 tenge

4) " Construction of a 50-apartment residential building No. 2 in the city of Baikonur, Kyzylorda region"

Customer: KSU Karmakshinsky District Department of Construction, Architecture and Urban Planning

technical supervision: Altimus LTD LLP"

author's supervision: "Reproject" LLP"

Contractor: Nurtechservice LLP the cost of the contract is 542,466,600 tenge

5) " Construction of a 50-apartment residential building No. 3 in the city of Baikonur, Kyzylorda region"

Customer: KSU Karmakshinsky District Department of Construction, Architecture and Urban Planning

technical supervision: Altimus LTD LLP"

author's supervision:" Reproject " LLP"

Contractor: Kazstroyservice LLP the cost of the contract is 546854213.81 tenge


Completed works in the field of construction, architecture and urban development for the first quarter of 2021

Information about all objects under construction in connection with the development of the district

According to the project "Construction of a camp for children's recreation in the summer-winter period in the Karmakshi district", 100.0 million tenge was allocated from the regional budget in 2017, 200.0 million tenge for 2018, 50.0 million tenge for 2020, and 97.839 million tenge was allocated additionally in October. General contractor of Promstroyservice-E LLP. The contractual amount of construction and installation works is -1 billion rubles.211 million tenge. In 2021, 783, 383,200 million tenge was allocated from the regional budget by the decision of the Kyzylorda Regional Maslikhat No. 519 of 11.12.2020 for the completion of construction, the construction of the facility is planned to be completed this year.

The design and estimate documentation for the object "Construction of five 50-apartment residential buildings in the city of Baikonur" was developed, a positive expert opinion No. PEK-0009/20 of 21.02.2020 was received. The project cost is 3 170, 372 648 million tenge. In order to finance the construction of the project through the Department of Construction, Architecture and Urban Planning of the Kyzylorda region, a budget application was submitted to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan. 1225,223 million tenge was allocated in 2021. To date, public procurement competitions are held.

"Reconstruction of water supply and sanitation systems in the city of Baikonur, Kyzylorda region. Stage 1. " the design and estimated cost of the object is 926.7 million tenge. For this project, 808,532 million tenge has been allocated from the republican budget, 92,676 million tenge has been allocated from the regional budget, and a public procurement competition is currently being held.

The design and estimated cost of the project "Construction of the water supply system of Toretam village of Karmakshy district" is 168.443 million tenge. For this project, 143,888 million tenge was allocated from the republican budget, and 15,987 million tenge was allocated from the regional budget. To date, a public procurement competition has been held, according to the results of which Daneker LLP was recognized as the winner.

Socio-economic indicators of the construction of the district

1) about the objects for which the budget application is submitted for the purpose of financing projects, for which the design and estimate documentation has been developed and the expertise has been carried out :

The POI of the object "Construction of a sports ground on the territory of the Karmakshinsky agrarian and technical college in the village of Zhosaly of the Karmakshinsky district of the Kyzylorda region" was developed and the conclusion of the complex non-departmental examination No. KSE-0072/18 of 13.09.2018 was obtained. The project cost is 41,009 million tenge. The budget application is submitted to the district Department of Economics and Budget Planning.

Development of the POI "Construction of a club for 100 seats in the village of Kuandariya in the Karmakshinsky district of the Kyzylorda region", 21.11.2018. The conclusion of a comprehensive non-departmental examination No. EI-0047/18 was received. The project cost is 199, 492 million tenge. A budget application has been submitted to the Regional Department of Culture, Archives and Documentation.

The POI of the object "Construction of a sports complex in the village of III International of the Karmakshi district of the Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental examination No. EI-0045/18 of 18.11.2018 was obtained. The project cost is 246, 857 million tenge. A budget application has been submitted to the Regional Department of Economy and Budget Planning.

The design and estimate documentation "Construction of 19 residential buildings in the village of Zhosaly, Karmaksha district" was developed, and the expert opinion No. PEK-0017/19 of 04.04.2019 was received. The project cost is 390,536 million tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region" was developed by the POI, and the expert opinion No. PEK-0009/20 of 21.02.2020 was received.

In addition, in order to provide these residential buildings with engineering infrastructure, the following projects have been developed, budget applications have been submitted to the department.

"Construction of five 50-apartment residential buildings in the city of Baikonur. Electricity supply" project cost - 31.447 million tenge,

"Construction of five 50-apartment residential buildings in the city of Baikonur. Provision of drinking water and sewerage" project cost - 79.726 million tenge

"Construction of five 50-apartment residential buildings in the city of Baikonur. Gas supply", the project cost is 33.167 million tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur. The cost of the project is 256.939 million tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur Heat supply", the project cost - 248.693 million tenge.

2) projects for which a budget application is submitted for the development of design and estimate documentation and conducting an expert examination:

A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economy and Budget Planning for the development of design and estimate documentation and the examination of the working project "Construction of a club for 100 seats in the village of Komekbayev, Karmakshinsky district, Kyzylorda region".

A budget application for the amount of 8.866 million tenge was submitted to the district Department of Economy and Budget Planning for the development of design and estimate documentation and the examination of the working project "Construction of a club for 100 seats in the village of Karmakshi, Karmakshi district, Kyzylorda region".

A budget application for the amount of 14.834 million tenge was submitted to the district Department of Economy and Budget Planning for the development of design and estimate documentation and the examination of the working project "Provision of drinking water for residential buildings of the "Tauelsizdik" microdistrict of the village of Zhosaly, Karmakshi district".

A budget application for the amount of 14.046 million tenge was submitted to the district Department of Economy and Budget Planning for the development of design and estimate documentation, the examination of the working project "Construction of gas supply networks to residential buildings of the Tauelsizdik microdistrict of the village of Zhosaly, Karmaksha district".

CERTIFICATE of work done for 3 months of 2021 of the "Karmaksha District Department of Construction, Architecture and Urban Planning" of the municipal state institution

Public services:

For the provision of public services through the public service center and the web portal "electronic government" non-profit joint stock Company "State Corporation" Government for Citizens»:

1) to determine the address of the property, the total number of applications received is 172. Of these, 7 applications were received through the public service center, 165 applications through the e-government web portal, and all applications were satisfied;

2) total number of applications received for assignment provision of source materials for the development of construction and reconstruction projects (redevelopment and re-equipment) total number of applications received through the e-government web portal 9. Number of satisfied applications 9;

3) the total number of requests received through the web portal of "electronic government" for the approval of the draft project 4, the number of satisfied requests 4.

Construction of individual residential buildings commissioned in Karmakshi district:

In the Karmakshi district, according to the target indicator "total area of residential buildings put into operation", according to the execution plan for 3 months of 2021, the total area is 4390.0 square meters.

Currently, according to the results of 3 months, 31 individual residential buildings with a total cost of 313656.0 thousand tenge, with a total area of 4515.0 sq. m. were put into operation in the district. The accounting of individual residential buildings put into operation was transferred to the district statistics department and the regional Department of Construction, Architecture and urban planning.

Compared to the corresponding period last year, it was 102.8% (for 3 months of 2020 – 4390.0 sq.m).

In connection with compliance with the requirements of urban planning regulations on the territory of the district:

In accordance with the detailed planning project developed on the basis of the general plan of the village of Zhosaly, work is underway to provide land for individual housing construction on the territory of 171.0 hectares in the microdistrict "Tauelsizdik", located within the village of Zhosaly.

The akimat of the village of Zhosaly registered 1731 applications of individuals in the queue for a land plot for individual housing construction. Currently, in order to satisfy the applications of registered individuals for the construction of an individual residential building, 766 individuals have been granted consent to land plots and land plots have been provided.

Construction projects:

The design and estimate documentation for the object "Construction of five 50-apartment residential buildings in the city of Baikonur" was developed, a positive expert opinion No. PEK-0009/20 of 21.02.2020 was received. The project cost is 3 170, 372 648 million tenge. In order to finance the construction of the project through the Department of Construction, Architecture and Urban Planning of the Kyzylorda region, a budget application was submitted to the Ministry of Industry and Infrastructure Development of the Republic of Kazakhstan. 1225,223 million tenge was allocated in 2021. To date, public procurement competitions are held.

"Reconstruction of water supply and sanitation systems in the city of Baikonur, Kyzylorda region. Stage 1. " the design and estimated cost of the object is 926.7 million tenge. For this project, 808,532 million tenge has been allocated from the republican budget, 92,676 million tenge has been allocated from the regional budget, and a public procurement competition is currently being held.

The design and estimated cost of the project "Construction of the water supply system of Toretam village of Karmakshy district" is 168.443 million tenge. For this project, -143,888 million tenge was allocated from the republican budget, -15,987 million tenge was allocated from the regional budget. To date, a public procurement competition has been held, according to the results of which Daneker LLP was recognized as the winner.


Completed works in the field of construction, architecture and urban planning at the end of 2020

Information about all projects under construction in connection with the development of the area

For the object "Construction of a camp for the recreation of children in the summer-winter period in the Karmakshy district" from the regional budget in 2017, 100.0 million tenge was allocated, for 2018 - 200.0 million tenge, in 2020 - 50.0 million tenge, as well as additionally in October it was allocated 97.839 million tenge. General contractor Promstroyservis-E LLP. The contractual amount of construction and installation works is -1 billion 211 million tenge.

"Providing networks of external engineering infrastructure for the construction of a poultry farm for the production of poultry meat with a capacity of 1500 tons per year in the village of Aktobe, Karmakshy district of the Kyzylorda region." External water supply networks "The total estimated cost of the project is 220.368 million tenge. Contract organization of Asar LLP. cost 195,300 million tenge Design supervision of the project by Remproekt LLP, technical supervision by Stroytekhnoproekt KZ A and K LLP.

In 2019, 25.0 million tenge was allocated from the regional budget. To complete the construction of this facility in 2020, 173, 228 million tenge were allocated, the facility was put into operation.

On the object: “Provision of external engineering infrastructure with networks for the construction of a poultry farm for the production of poultry meat with a capacity of 1500 tons per year in the village of Aktobe, Karmakshy district, Kyzylorda region. External power supply networks. Estimated documentation "total cost of 272.356 million tenge. In 2019, funds in the amount of 25.0 million tenge were allocated from the regional budget, the contractor PK "Erzat". The negotiated amount is 241.376 million tenge. Designer supervision of TMProektStroy LLP, technical supervision of Stroytekhnoproekt KZ A and K LLP і.

To complete the construction of this facility in 2020, 245.121 million tenge was allocated from the republican budget, the facility was commissioned.

Socio-economic indicators of the construction of the district

1) on objects for which a budget application is submitted for the purpose of financing projects for which design and estimate documentation has been developed and an examination has been carried out:

The design and estimate documentation of the object "Construction of a sports ground on the territory of the Karmakshy agrarian and technical college in the village of Zhosaly, Karmakshy district of the Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental examination was received No. KSSE-0072/18 dated 09/13/2018. The project cost is 41009.0 thousand tenge. The budget application is submitted to the district department of economics and budget planning.

Development of design and estimate documentation "Construction of a club for 100 seats in the village of Kuandaria, Karmakshy district, Kyzylorda region", November 21, 2018 Received a conclusion of a comprehensive non-departmental examination No. EI-0047/18. Project cost 199 492.0 thousand tenge. To the regional department of culture, archives and the documentation submitted a budget request.

The design and estimate documentation of the object "Construction of a sports complex in the village of the ІІІ International of the Karmakshy district of the Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental examination No. EI-0045/18 dated November 18, 2018 was received. The cost of the project is 246 857.0 thousand tenge. To the regional department of economy and budget planning submitted budget request.

A link was developed to the previously developed design and estimate documentation for 19 residential buildings in the village of Zhosaly, Karmakshinsky district, and an expert opinion was received No.PEK-0017/19 dated 04.04.2019. The cost of the project is 390,536.0 thousand tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region" was developed by the design and estimate documentation, and an expert opinion was received No. PEK-0009/20 dated 02.21.2020. The cost of the project is 3,170,372.648 thousand tenge. The budget application is submitted through the regional administration of construction, architecture and urban planning to the Ministry of Industry and Infrastructure Development.

2) projects for which a budget application for the development of design and estimate documentation and expertise is submitted:

For the development of design estimates for the project "Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region" and obtaining an expert opinion - 25637.0 thousand tenge was allocated from the regional budget.

Currently, these working projects have been developed, expert opinions have been obtained. (Project for providing heat, gas, external power grids, external drinking and sewage water and landscaping). Based on these works, budgetary applications were submitted to finance construction works.

INFORMATION on the work done for 12 months of 2020 of the "Karmakshy District Department of Construction, Architecture and Urban Planning" of the municipal state institution

1 “Provision of engineering infrastructure for the construction of a poultry farm for the production of poultry meat 1500 tons per year in the village of Aktobe, Karmakshy district, Kyzylorda region. External water supply networks. Appendix to estimate documentation "

General contractor: LLP "AsanasDar".


Completed works in the field of construction, architecture and urban development for the THIRD quarter of 2020

Information about all objects under construction in connection with the development of the district

The regional budget allocated 100.0 million tenge in 2017, 200.0 million tenge in 2018, and 50.0 million tenge in 2020 for the project "Construction of a summer and winter recreation camp for children in karmakshi district". The General contractor LLP "Promstroyservis-E". The customer submitted a budget request for the necessary funds to the budget through the regional Department of construction, architecture and urban planning. The necessary funds to complete the project are 877.053 million tenge.

"Provision of outdoor engineering infrastructure networks for the construction of a poultry farm for the production of poultry meat with a capacity of 1,500 tons per year in the village of Aktobe, karmakshinsky district, Kyzylorda region". External water supply networks " the total estimated cost of the project is 220.368 million tenge. Contracting organization LLP "Asar". The contract value is 195,300 million tenge. Author's supervision of the project "Remproekt" LLP, technical supervision of "Stroytechnoproekt KZ A and K" LLP.

In 2019, 25.0 million tenge was allocated from the regional budget. To complete the construction of this facility in 2020.allocated 123, 228 million tenge. In August of this year, 50.0 million tenge was allocated. additional contracts are currently being concluded for these funds.

According to the project: "Provision of outdoor engineering infrastructure networks for the construction of a poultry farm for the production of poultry meat with a capacity of 1500 tons per year in the village of Aktobe, karmakshinsky district, Kyzylorda region. External power supply networks. Estimated documentation " total cost 272,356 million tenge. In 2019, funds in the amount of 25.0 million tenge were allocated from the regional budget, the contractor PC "Yerzat". The contractual amount is 241.376 million tenge. Supervision of LLP "Impractical", technical supervision of LLP "Stroytekhnoproekt KZ AND K" I.

To complete the construction of this facility in 2020, 175,121 tenge was allocated from the national budget, and 44,872 million tenge was allocated in August of this year. additional contracts are currently being concluded for these funds.

Socio-economic indicators of the district's construction

1) about the objects which are presented budget request to Finance projects for which design and estimate documentation and examination :

Developed design estimate documentation of the project "Construction of sports grounds on the territory of the Karmakshy agricultural and technical College in Zhosaly village of karmakshinsky area of Kyzylorda region" and the conclusion of a comprehensive departmental examination no XSA-0072/18 from 13.09.2018 year. The project cost is 41009.0 thousand tenge. The budget application is submitted to the regional Department of Economics and budget planning.

Development of the POI "Construction of a 100-seat club in the village of Kuandariya, karmakshinsky district, Kyzylorda region", 21.11.2018. the conclusion of a comprehensive non-departmental expert examination no. EI-0047/18 was Received. the project Cost is 199 492.0 thousand tenge. A budget application has been submitted to the regional Department of culture, archives and documentation.

The POI of the object "Construction of a sports complex in the village of the III international of karmakshinsky district of the Kyzylorda region" was developed and the conclusion of a comprehensive non-departmental examination No. EI-0045/18 of 18.11.2018 was received. The project cost is 246 857.0 thousand tenge. A budget application has been submitted to the regional Department of economy and budget planning.

The reference to the previously developed design and estimate documentation of 19 residential buildings in the village of Zhosaly, karmakshi district, was developed,and the expert opinion no. PEK-0017/19 of 04.04.2019 was obtained. The project cost is 390,536. 0 thousand tenge.

"Construction of five 50-apartment residential buildings in the city of Baikonur, Kyzylorda region" was developed by the POI, and the expert opinion no. PEK-0009/20 of 21.02.2020 was received. Project cost – 3 372,648 170 thousand tenge. The budget application is submitted through the regional Department of construction, architecture and urban development to the Ministry of Industry and infrastructure development.

2) projects for which the budget application for development of design and estimate documentation and expertise is submitted:

For the development of project-estimate documentation on the object "Linking the previously developed design estimates for the construction of rural club in the village of Konakbaev Karmakshy district" and receive an expert opinion submitted budget request to the regional Department of economy and budget planning in the amount of 6905,0 thousand tenge.

For the development of design and estimate documentation for the object "Linking previously developed design and estimate documentation for the construction of a rural club in the village of Karmakshi, karmakshi district" and obtaining an expert opinion, a budget application was submitted to the district Department of economy and budget planning in the amount of 6905.0 thousand tenge.

Public service:

For the provision of public services through the public service center and the e-government web portal non-profit joint-stock company "State Corporation" Government for citizens»:

1) to determine the address of the property, the total number of applications received is 809. Of these, 82 applications were received through the public service center, 727 applications through the e-government web portal, and all applications were satisfied;

2) total number of requests received for assignment provision of source materials in the development of construction and reconstruction projects (redevelopment and re-equipment) total number of requests received through the e-government web portal 8. Number of satisfied requests 8;

3) the total number of requests received through the e-government web portal for approval of the draft design 5, the number of satisfied requests 5.

Individual housing construction commissioned in Karmakshi district:

According to the approved plan for 2020, the total area of residential buildings in karmakshinsky district is 32 500.0 square meters. metres'.

Currently, 145 individual residential buildings with a total cost of 1017110.0 thousand tenge and a total area of 23840.0 square meters were commissioned in the district for 9 months. Records of commissioned individual residential buildings were transferred to the district Department of statistics and the regional Department of construction, architecture and urban development.

Compared to the corresponding period last year (for 9 months of 2019 – 17360.0 sq.m).

Due to compliance with the requirements of urban planning regulations on the territory of the district:

In accordance with the detailed planning project developed on the basis of the General plan of the village of Zhosaly, work is underway to provide land plots for individual housing construction on the territory of 171.0 hectares in the "Tauelsizdik" microdistrict located within the village of Zhosaly.

The akimat of the village of Zhosaly registered 1731 requests from individuals in the queue for land for individual housing construction. Currently, in order to satisfy the applications of registered individuals for the construction of an individual residential building, 751 individuals have been granted consent to land plots and land plots have been granted


Completed works in the field of construction, architecture and urban development for the SECOND quarter of 2020

Information about all objects under construction in connection with the development of the district

according to the project "construction of a camp for children's recreation in the summer-winter period in karmakshi district", 100.0 million tenge was allocated from the regional budget in 2017, 200.0 million tenge for 2018, 200.0 million tenge for 2019, and 50.0 million tenge for 2020. The General contractor LLP "Promstroyservis-E". the contractual amount of construction and installation works is -1 billion rubles.211 million tenge.

Currently, the customer, through the Department of construction, architecture and urban planning of the Kyzylorda region, has revised the design and estimate documentation for this camp facility and received the state expert opinion No. 19-0096/20 dated March 17, 2020. On this basis, the construction Department sends budget requests to the regional Department of economy and budget planning in order to complete the construction of the camp facility.

"Provision of outdoor engineering infrastructure networks for the construction of a poultry farm for the production of poultry meat with a capacity of 1,500 tons per year in the village of Aktobe, karmakshinsky district, Kyzylorda region". External water supply networks " the total estimated cost of the project is 220.368 million tenge. Contracting organization LLP "Asar". The contract value is 195,300 million tenge. Author's supervision of the project "Remproekt" LLP, technical supervision of "Stroytechnoproekt KZ A and K" LLP.

As of July 1 of this year, 89700.6 thousand tenge has been disbursed. Construction work is currently underway.

According to the project: "Provision of outdoor engineering infrastructure networks for the construction of a poultry farm for the production of poultry meat with a capacity of 1500 tons per year in the village of Aktobe, karmakshinsky district, Kyzylorda region. External power supply networks. Estimated documentation " total cost 272,356 million tenge. In 2019, funds in the amount of 25.0 million tenge were allocated from the regional budget, the contractor PC "Yerzat". The contractual amount is 241.376 million tenge. Supervision of LLP "Impractical", technical supervision of LLP "Stroytekhnoproekt KZ AND K" I.

As of July 1 of this year, 125,000,0 thousand tenge was disbursed. Construction work is currently underway.

Socio-economic indicators of the district's construction

1) about the objects which are presented budget request to Finance projects for which design and estimate documentation and examination :

Дата публикации
05 января 2023
Дата обновления
08 октября 2026
Тип
Information

Сейчас читают

10 сентября 2025
Information
08 сентября 2025
Implementation of the message
Information
25 июля 2025
Frequently asked questions akim of karmakshi district

Социальные медиа

Facebook
Instagram
VK

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты