Works performed by the Aral District Department of Construction, Architecture and Urban Planning for the III quarter of 2023.
This year, by order of the department, 4 projects (4,472.5,2 million tenge) of construction and installation works were continued in the district on a transitional basis from 2022, 8 projects were supported in 2023 (1,532.8 million tenge).
This year, an open stadium facility was built and put into operation in the village of Saksaulsk, the power grid of microdistricts No. 5 and No. 6 of Aralsk was carried out and state acceptance was carried out.
As a result, in 2022, 125 people standing in line received land plots in the microdistrict No. 5 for housing construction, 175 applications were satisfied this year, documents are being processed. By the end of the year, it is planned to fully transfer the remaining 390 land plots.
In addition, in order to provide infrastructure (water, electricity) for the area of new individual residential buildings, funds are provided from the republican, regional budget, relevant work is underway in the village of Zhaksykylysh (60 hectares) and the microdistrict No. 8 (80ha) of Aralsk. These works will be fully completed by the end of the year.
As a result, 308 land plots will be transferred from the microdistrict No. 8, 220 from the village of Zhaksykylysh.
Funds have been allocated from the regional budget for the start of work on laying the gas pipeline in the Aralsk microdistrict No. 4, and public procurement is underway. The project cost is 368.8 million..tenge.
In addition, within the framework of the national project "Kuatty onirler el damuyn driveri" for the purchase of 100 apartments from the republican budget for socially vulnerable segments of the population, 40 apartments have been purchased to date, and by the end of November we will completely buy 60 apartments.
Allow me to drive through the objects of transitional construction.
1. 303.3 million tenge has been allocated from the budget for the construction of a sports and recreation complex in the village of Kamystybas in 2021 and construction work has begun (contractor "Dias Kurylys" LLP). Currently, construction and installation works have been completed on the object, the shortcomings have been completely eliminated. The facility is ready for commissioning. The contractor develops documents to order.
2. 306.5 million tenge has been allocated from the regional budget for the construction of a water pipeline in the settlement of Koktem. in the direction of Sapak-Koktem, the main line and intra-village water supply have been fully brought in, household metering devices have been installed.
Currently, work is underway to install a water pumping device, connect a water pumping station to a reservoir, a main pipeline and prepare for outdoor landscaping.
3. 310.9 million tenge was allocated for the construction of a water supply network in the Aralsk microdistrict No. 6 in 2022, construction and installation works were started by the contractor "Zhanartu" LLP.
Currently, the contractor has been instructed to eliminate the shortcomings made during construction by the department and the technical supervisor.
After the construction works are fully completed, 353 residents will be provided with a land plot.
4.Construction of a branch of the gas pipeline from the Beineu-Shymkent main gas pipeline with the installation of AGRS in the village of Saksaulsk (contract value 1,804.8 million tenge) for 2022-2023 (NK-1112.5 million tenge, RB-580.2 million tenge, CB 188.1 million tenge), in connection with due to the delay of some devices from foreign countries, funds in the amount of 290.1 million tenge were allocated for the implementation of an internal gas pipeline. 290.1 million tenge is needed for the complete completion of the facility.
Currently, the gas line to the AGRS is being dug, pipes are being installed. Work is also underway on power supply (installation of KTPN), digging of the fiber-optic communication line pipeline.
5. 1,531.4 million tenge has been allocated for the construction of a gas pipeline and intra-block gas transmission networks in the village of Saksaulsk (contract value 1,605.4 million tenge) For 2022-2023 (NC - 1,365.5 million tenge, OB-166.4 million tenge), an underground gas pipeline (96 kilometers) has been fully carried out.
Currently, work is underway to develop the locations of overhead lines and cabinets of gas control points (GRPS).
1 piece of gas control points (GRP) and 5 pieces of cabinet gas control points (GRPSh) were delivered to the warehouse. 132.9 million tenge is needed for the complete completion of the facility
Works performed by the Aral District Department of Construction, Architecture and Urban Planning for the III quarter of 2022.
For 9 months of 2022 , 24,822 sq. m. were commissioned . m of housing (for 9 months of 2021-24,482 sq. m), the plan was completed by 101.4%. Since the beginning of the year, construction works worth 2.3 billion tenge have been carried out in the district, which is 74.8% more than last year. Amanotkel, which started in 2021 as part of the Auyl-el Besigi project (worth 287.1 million tenge) construction of sports and recreation complexes in the village of Kamystybas (cost - 292.4 million tenge), construction of sports and recreation complexes in the village of Zhaksykylysh continues. In the field of education, along with a boarding school for 100 places in the city of Aralsk, school No. 71 for 200 places was put into operation by the new academic year.
In addition, - 295.2 million tenge for the project "Construction of a water supply system in the settlement of Koktem"; - 150.6 million tenge for the project "Construction of power grids in the microdistrict No. 5 of Aralsk"; -"Construction of a gas pipeline branch from the Beineu-Shymkent main gas pipeline with the installation of AGRS in the village of Saksaulsk of the Aral region" and - "Construction of a gas pipeline to the village of Saksaulsk of the Aral region and intra-block gas supply networks. Adjustment" in the amount of 900.0 million. tg; - 100.0 thousand tenge for the project "Construction of a water supply network in the microdistrict No. 6 Aralsk"; - 100.0 thousand tenge has been allocated for the project "Construction of a water supply network in the microdistrict No. 6 of Aralsk", construction and installation works are carried out on all projects.
The work done for the second quarter in 2022 by the Department of Construction, Architecture and Urban Planning of the Aral district
In the Aral region, by order of the Akimat of the Aral region, construction and installation works of a sports and recreation complex are being carried out in the framework of the special project "Auyl-el besigi", which is going to 2021-2022, Amanotkel (287,145.8 thousand tenge) and Kamystybas (292,376.2 thousand tenge). The remaining funds for the completion of the construction of these facilities (Amanotkel 78 605.8 thousand tenge, Kamystybas 84 376.2 thousand tenge) are completely divided. Construction and installation work on the facilities, according to the project, is proceeding at a moderate pace. It is planned that the sports facilities will be put into operation by August 31 of this year.
In addition, in 2022, funds have been allocated from the budget:
1. For the construction of an electric grid in the microdistrict No. 5 of Aralsk (the cost of the project is 167,400.0 thousand tenge, allocated RB-150,639.0 thousand tenge);
2. Start the construction of an electric grid in the microdistrict No. 6 of Aralsk (the cost of the project is 158 600.0 thousand tenge, allocated RB-100.0 thousand tenge);
3. Start the construction of a water supply network in the microdistrict No. 6 of Aralsk (project cost - 338 100.0 thousand tenge, allocated RB-100.0 thousand tenge);
4. Construction works "Construction of a gas pipeline branch from the Beineu-Shymkent main gas pipeline with the installation of AGRS in the village of Saksaulsk of the Aral region" (project cost -1,904,200,0 thousand tenge, allocated RB - 500,000,0 thousand tenge);
5. "Construction of the supply gas pipeline and intra-block gas supply networks of the village of Saksaulsk of the Aral region. Corrective" construction works (project cost - 1,683,500,0 thousand tenge, allocated RB - 400,000,0 thousand tenge);
6. "Construction of a water supply system in the settlement of Koktem in the Aral region" (project cost - 328 000,0 thousand tenge, allocated RB-295 192,0 thousand tenge) in order to determine the contractor of construction works through the Department of Public Procurement of the Kyzylorda region, public procurement works are carried out by means of a tender and results are expected.
The Aral District Department of Construction, Architecture and Urban Planning submitted a budget application to the Department of Culture, Archives and Documentation of the Kyzylorda region for financing construction in 2022 (letter No. 01-9/531 dated March 24, 2022) on the projects "Construction of a rural club for 100 seats in a new standard project from the settlement Bogen of the Aral district and for 150 places in the settlement of Amanotkel", "Construction of the Pushkin Library in the city of Aralsk" and "Reconstruction of the building of the institution of the regional center of culture in the city of Aralsk".
A budget application has also been submitted to the regional Department of Architecture and Urban Planning for financing the "Construction of a 1-storey 2-apartment 7-apartment building" and "a 2-storey 8-apartment 7-apartment communal residential building" in Aralsk.
In addition, to date, the design and estimate documentation "For the construction of a gas pipeline to microdistricts No. 5 and 6 in Aralsk"; "Construction of a gas pipeline to the settlement of Shizhaga, Aral district"; "Construction of sewer networks in the MKR. No. 4, Aralsk; "Construction of a new "sports and recreation complex" in the settlements of Shizhaga, Aralkum of the Aral region documentation is under development.
According to the construction of a rural hospital with 40 beds in the village of Saksaulsk of the Aral region, carried out in the Aral region by order of the Department of Construction, Architecture and Urban Planning of the Kyzylorda region, the contractor carried out construction work very slowly, repeatedly, in accordance with the discrepancy in the quality of construction work, technical supervision was warned, the State Architectural and Construction Control department imposed an administrative fine.
In this regard, the contract concluded with the contractor on the basis of the terms of the contract was terminated unilaterally in June 2021.
The design and estimate documentation for the facility was developed in 2015, and the conclusion of the state expertise was received in 2016. The estimated documentation of the project is being adjusted.
On October 15, 2021, an agreement was signed between DELTA GROUP-1 LLP for the provision of security services for the facility "construction of a hospital with 40 beds in the village of Saksaulsk in the Aral region", the facility is protected by a specialized institution.
104.5 million tenge has been allocated for the construction of a sports and recreation complex in the village of Zhaksykylysh in the Aral region for the completion of the facility in 2022. In June 2022, an agreement was signed. Construction and installation works are scheduled to be completed in September 2022.
The construction contractor of SSENgineering LLP is scheduled to put into operation by the new academic year of this year the school facility No. 71 under construction for 200 places with a boarding school for 100 places in the city of Aralsk.
The work done for the first quarter in 2022 by the Department of Construction, Architecture and Urban Planning of the Aral district
In 2022, the Aral District Department of Construction, Architecture and Urban Planning is implementing 4 projects totaling 3,268,431.9 thousand tenge.
Including:
Within the framework of the state program "Business Roadmap 2020", the engineering and communication infrastructure (gas and electricity supply) will be brought to the AralSoda plant with a capacity of 300 thousand tons in the Kyzylorda region.
1. funds of the gas supply project under the contract - 1,388,425. 6 thousand tenge.
Allocations for 2020 - 50 000,0 thousand tenge.
2021 allocated funds - 210 153,0 thousand tenge.
To date, 8.1 km of pipelines of the gas network have been carried out. The funds allocated for 2021 have been fully disbursed and are currently temporarily idle due to insufficient budget funds for construction work.
It is planned that funds will be fully allocated for construction and installation work and the project will be implemented on a transitional basis until the work is completed.
2. funds of the electricity supply project under the contract - 1,300,484. 2 thousand tenge.
Allocations for 2020 - 100,000,0 thousand tenge.
2 sets of 26.37 tons of non-insulated wires and 5,328 pieces of suspended glass insulators were received for the allocated funds on the power line.
2021 allocated funds - 49 600.0 tenge.
Due to the fact that the claim of JSC "Elektromontazh" on termination of the contract, which could not participate in public procurement, was considered in court in the specialized interdistrict economic court of the Kyzylorda region, before clarifying the circumstances, a decision was made to conclude an additional contract. Nevertheless, it is planned to change the purpose of the allocated funds and direct them to the costs of the gas supply project of the AralSoda plant.
In addition, as part of the implementation of the special project "Auyl-el besigi":
3. Construction of a sports and recreation complex in the settlement of Amanotkel in the Aral district of the Kyzylorda region
Contractor-Nurtechservice LLP
Funds under the contract - 287,145.8 thousand tenge.
Allocations for 2021-215,000,000 tenge (RB)
Allocated funds in 2022 – 53,133.0 thousand tenge (RB, SF)
4. Construction of a sports and recreation complex in the village of Kamystybas of the Aral district of the Kyzylorda region
Contractor-LLP "Dias-Kurylys RG"
Funds under the contract - 292,376.3 thousand tenge.
Allocations for 2021-215,000,000 tenge (RB)
Allocated funds in 2022 – 58,017.0 thousand tenge (RB, NF)
The remaining funds will require co-financing at the expense of the regional budget.
Currently, the building is fully erected and interior finishing painting works are underway. It is expected that in the third quarter of 2022, the construction work will be fully completed and put into operation.
Works performed by the Department of Construction, Architecture and Urban Development of the Aral region in 2021
During the 12 months of 2020 , 24,799 sq. m. were put into operation . m of housing, 27,515 sq.m were commissioned in 12 months of 2021. m housing, which is 111.0% more.
Of these, it should be particularly noted that in early October, with the direct support of the fund of our countryman Bulat Utemuratov, 40 residential buildings (286.0 million) were commissioned, at the expense of the National Fund -388.0 million tenge (RK - 294.0 million tenge, OB-94.0 million tenge), 18 1-storey 2-apartment residential buildings (36 apartments) were purchased in Aralsk. There are 76 apartments in total. The number of families owning new apartments included large families, orphans, disabled people and families who lived in the building of the former emergency school No. 199.
Projects amounting to 3.3 billion tenge are being implemented in the construction sector.
In particular, within the framework of the Business Roadmap 2020 program, 259.7 million tenge has been allocated for 2021 to bring engineering and communication infrastructure to the AralSoda plant with a capacity of 300 thousand tons in the Kyzylorda region (the cost of the gas project is 1.4 billion tenge, the cost of the electric grid project is 1.3 billion tenge). 300.0 million tenge has been allocated for the construction of a railway dead end from the Aral Sea station, the entrance to the plant, and appropriate work is underway.
46.6 million tenge (total amount of 54.3 million tenge) was allocated for the construction work of 12 training and streetball grounds (passing 2020-2021) in Aralsk and put into operation in full.
Within the framework of the project "Auyl-El besigi", as a transitional project, it is planned to "build a sports and recreation complex in the village of Zhaksykylysh" for 2020-2021 in the amount of 104.7 million tenge this year, 430.0 million tenge has been allocated from the republican budget for the construction of a sports and recreation complex in the settlements of Amanotkel, Kamystybas. Construction works are underway.
In order to provide the engineering infrastructure of the areas identified for individual housing construction within the framework of the state housing construction program "Nurly Zher", 490.5 million tenge was allocated from the republican budget, construction and installation works were carried out. Design and estimate documentation is being developed for the allocated 32.8 million tenge.
In addition, at the expense of the district budget funds for 44.6 million tenge, 1 office housing was purchased into communal ownership from the city of Aralsk (18.0 million tenge), 1 office housing for a paramedic of a medical post in the village of Kulandy (3.5 million tenge) and a residential building adapted to the building of a village club from the village of Akespe (23.1 million tenge), 1 object was purchased.
For reference:
In addition, through the Department of Construction, Architecture and Urban Planning of the Kyzylorda region, 1,146.0 million tenge will be sold in the district. work is underway to develop design and estimate documentation, Aral district, Tastubek (20.0 million tenge), Zhalgyzagym (20.0 million tenge) for the construction of a medical center in settlements.
The work done for the III quarter in 2021 by the Department of Construction, Architecture and Urban Planning of the Aral district
In 2021, the Aral District Department of Construction, Architecture and Urban Planning is implementing 10 projects totaling 4,192,088.1 thousand tenge.
Including:
Within the framework of the state program "Business Roadmap 2020", the engineering and communication infrastructure (gas supply, electricity supply) will be brought to the AralSoda plant with a capacity of 300 thousand tons in the Kyzylorda region.
1. Funds of the gas supply project under the contract - 1,388,425. 6 thousand tenge.
Allocations for 2020 - 50 000,0 thousand tenge.
2021 allocated funds - 210,153.0 thousand tenge.
To date, 8.1 km of pipelines of the gas network have been carried out. The funds allocated for 2021 have been fully disbursed and are currently temporarily idle due to insufficient budget funds for construction work.
It is planned that funds will be fully allocated for construction and installation work and the project will be implemented on a transitional basis until the work is completed.
2. Funds of the electricity supply project under the contract - 1,300,484. 2 thousand tenge.
Allocations for 2020 - 100 000,0 thousand tenge.
2 sets of 26.37 tons of non-insulated wires, 5,328 pieces of suspended insulators made of glass were received for the allocated funds on the power line.
2021 allocated funds - 49 600.0 tenge.
Due to the fact that the claim of JSC "eLektromontazh" on termination of the contract, which could not participate in public procurement, was considered in court in the specialized interdistrict economic court of the Kyzylorda region, before clarifying the circumstances, a decision was made to conclude an additional contract. Nevertheless, it is planned to change the purpose of the allocated funds and direct them to the costs of the gas supply project of the AralSoda plant.
3. At the expense of the district budget funds, "Construction of 12 training and streetball grounds in Aralsk, Kyzylorda region" is underway. The construction work dates are set for 2020-2021.
Under the contract-52,734.4 thousand tenge.
2020 allocated funds-8,188.0 thousand tenge.
2021 allocated funds-46 588.9 thousand tenge.
To date, construction and installation work has been completed in full, preparations are underway for state acceptance.
In addition, as part of the implementation of the special project "Auyl-el besigi"
4. Construction of a sports and recreation complex in the settlement of Amanotkel in the Aral district of the Kyzylorda region
Contractor-Nurtechservice LLP
Funds under the contract - 287,145.8 thousand tenge.
Allocations for 2021-215,000,000 tenge (RB)
5. Construction of a sports and recreation complex in the village of Kamystybas of the Aral district of the Kyzylorda region
Contractor-Dias-Kurylys RG LLP
Funds under the contract - 292,376.3 thousand tenge.
Allocations for 2021-215,000,000 tenge (RB)
The remaining funds will require co-financing at the expense of the regional budget.
Currently, earthworks are being carried out at ground zero. However, due to the audit appointed by the Department of Internal State Audit of the Kyzylorda region, the disbursement of funds is temporarily suspended.
6. The total estimated cost of work on the "Construction of a water supply network in the microdistrict No. 5 of the city of Aralsk" within the framework of the state housing construction program "Nurly Zher" (provision of engineering infrastructure of areas designated for individual housing construction) is 553,356.0 thousand tenge.
Funds under the contract-466,251.4 thousand tenge.
Contractor-AikoStroy LLP
Currently, the central water supply network has been excavated at a depth of 1.70 cm and 4.5 km of pipeline has been installed. Construction work continues. However, the funds related to the audit appointed by the Department of Internal State Audit of the Kyzylorda region have not been temporarily disbursed.
7. Purchase of housing for large, low-income families in the city of Aralsk within the framework of the state housing construction program "Nurly Zher".
2021 allocated funds-388,050. 0 thousand tenge.
In the microdistrict No. 2 of Aralsk, at the expense of individual entrepreneurs, a 1-storey 18 house (36 apartments) is being built. To date, public procurement has been carried out by means of a tender, results are expected.
Design and estimate documentation developed by the department:
1. Due to the late financing of the project for the construction of a solid landfill in the village of Saksaulsk of the Aral region (conclusion of the state expert examination No. 14-0173/17 dated 18.08.2017), 7,200,0 thousand tenge was allocated from the district budget for the recalculation of this project.
In accordance with subparagraph 3) Paragraph 3 of Article 39 of the Law of the Republic of Kazakhstan dated December 4, 2015 No. 434-V "On Public Procurement" on 30.04.2021, a contract was concluded for the performance of works with the general designer of Kyzylorda Project Kurylysy LLP by means of public procurement from a single source. The deadline for execution is set on 23.08.2021. To date, the contractor is working on the recalculation of the project.
2. In connection with the expiration of the developed design and estimate documentation for the construction of the Pushkin Library of the city of Aralsk (No. 14-0162/15 dated 06/19/2015) in accordance with subparagraph 3) Paragraph 3 of Article 39 of the Law of the Republic of Kazakhstan dated December 4, 2015 No. 434-V "On Public Procurement" concluded an agreement with the original project designer of Talgat LLP dated 05/04/2021.
Under the contract - 5,018. 0 thousand tenge.
Expert opinion - No. ZhS-0049/21 dated 08/24/2021
General Designer -Talgat LLP
The cost of the project is 152,164. 0 thousand tenge.
The recalculation works have been completed in full, the project was adopted on 08/24/2021.
3. On 14.06.2021, an agreement was signed with Kaz Nur Design and Construction Institute LLP for the development of design and estimate documentation for the reconstruction of the building of the district cultural center in Aralsk. The cost of the contract is 4,402.4 thousand tenge. In accordance with the introduction of additional proposals and amendments to the project for the design of the construction of a parking lot in front of the facility, work continues.
The work done for the first half of the year in 2021 by the Department of Construction, Architecture and urban planning of the Aral district
1. At the expense of the district budget, "Construction of 12 training and streetball grounds in Aralsk, Kyzylorda region" is being carried out. The terms of construction work are set for 2020-2021.
Under the contract-52,734. 4 thousand tenge.
2020 allocated funds-8,188. 0 thousand tenge.
2021 allocated funds-26 812.0 thousand tenge.
To date, for construction and installation works, the places of the soles for fixing sports and children's play devices of the playground are filled with reinforced concrete mortar, and the unshakable fastenings of the soles are installed in accordance with the dimensions. The devices are being transported. To complete the project, it is necessary to allocate MB-19,776. 9 thousand tenge.. The facility will be put into operation by the end of this year.
Within the framework of the implementation of the special project " Auyl-el besigi":
1. For the production of construction and installation works under the project "Construction of a sports and recreation complex in the settlement of Amanotkel of the Aral region" (estimated cost-309 816.0 thousand tenge), RB – 215 000.0 thousand tenge was allocated.
2. For the production of construction and installation works under the project "Construction of a sports and recreation complex in the settlement of Kamystybas of the Aral region" (estimated cost-315,275,0 thousand tenge), RB – 215,000,0 thousand tenge was allocated.
The remaining funds will need co-financing at the expense of the regional budget. Currently, the Department of Public Procurement of the Kyzylorda region is working on public procurement in two projects by means of a tender to determine contractors engaged in construction work.
Within the framework of the state housing construction program "Nurly Zher" (provision of engineering infrastructure for areas designated for individual housing construction)
RB – 490 472.0 thousand tenge was allocated for the construction of a water supply network in the microdistrict No. 5 of Aralsk. The total estimated cost of the project is 553 356.0 thousand tenge. The remaining funds will be co-financed from the regional budget.
Currently, the Department of Public Procurement of the Kyzylorda region is working on public procurement to determine the contractor carrying out construction work.
Design and estimate documentation developed by the department:
1. Due to the late financing of the project for the construction of a solid landfill in the village of Saksaulsk of the Aral region (state expert examination conclusion No. 14-0173/17 of 18.08.2017), 7,200,0 thousand tenge was allocated from the district budget for the recalculation of this project.
In accordance with subparagraph 3) paragraph 3 of Article 39 of the Law of the Republic of Kazakhstan No. 434-V "On Public Procurement" dated December 4, 2015 on 30.04.2021, a contract was concluded for the performance of works with the general designer of Kyzylordazhstroy LLP by the method of public procurement from a single source. The deadline for execution is set on 23.08.2021. To date, the contractor is working on the recalculation of the project.
2. Due to the expiration of the developed design and estimate documentation for the construction of the Pushkin Library of the city of Aralsk (No. 14-0162 / 15 of 19.06.2015) in accordance with subparagraph 3) paragraph 3 of Article 39 of the Law of the Republic of Kazakhstan No. 434-V "On Public Procurement" dated December 4, 2015, an agreement was concluded with the original project designer of Talgat LLP dated 04.05.2021. According to the contract with the contractor, work is underway to recalculate the project. The deadline for the completion of the work is set on 23.08.2021.
Information on the work done for 3 months of 2021 in the Aral region
Work done by the Aral District Department of Architecture and Urban Planning
Works in the first quarter of 2021 Department of Construction, Architecture and Urban Planning of the Aral region. In 2021, the Department of Construction, Architecture and Urban Planning of the Aral district is implementing 3 projects totaling 3190147 thousand tenge.
In particular:
- Construction of engineering and communication infrastructure (gas, electricity) to the AralSoda plant with a capacity of 300 thousand tons. Tons in the Kyzylorda region in the framework of the Business Roadmap-2020 is the transition from 2020 to 2022.
- "Construction of 12 training and streetball grounds in Aralsk, Kyzylorda region" is carried out at the expense of the district budget. Construction is expected to be completed in 2021.
The Department of Construction, Architecture and Urban Planning of the Kyzylorda region has implemented 3 projects in the Aral region.
- Construction of a 40-bed hospital in Saksaulsk;
- The construction of the "Sports and Recreation complex" in the village of Zhaksykylysh is planned as a transition from 2020 to 2021 within the framework of the special event project "Auyl-El besigi".
- "Construction of school No. 71 for 200 places with a boarding school for 100 places in Aralsk, Aralsky district, Kyzylorda region" construction is transitional from 2021 to 2022.
Works performed by the Department of Construction, Architecture and Urban Development of the Aral region in 2020
In 2020, the Aral Regional Department of Construction, Architecture and Urban Planning implemented 13 projects totaling 1,993,990.9 thousand tenge.
Including:
- Construction of biothermal pits in 5 settlements of the Aral region (Zhanakurylys, Kyzylzhar, Karateren, Bogen, Rayym);
- Reconstruction (reconstruction) of the building of the district department of Employment, social programs and civil registration;
- Construction of a landfill for solid household waste in Aralsk;
- Construction of 10-storey 4-apartment residential buildings in Aralsk (Credit house with preferential lending to depositors of the bank through JSC "Zhilstroysberbank" within the framework of the state housing construction program "Nurly Zher»);
- (Within the framework of the "Nurly Zher" program, the construction of a water supply network to the microdistrict No. 1 of the city of Aralsk was implemented in order to provide engineering infrastructure to the areas designated for individual housing construction) ;
- (Within the framework of the state program "Development of Regions until 2020") works on expansion and reconstruction of the internal water supply network of the Shomish settlement of the Aral region;
- 2.1 km of the water pipeline along Karakum Street (formerly Putevaya Street), located on the outskirts of Aralsk, has been completed and put into operation .
Conducted by the department:
- Construction of a school for 300 places in the village of Saksaulsk in the Aral region (as part of the Employment Roadmap for 2020-2021);
In the framework of the program "business Road map-2020" work on summing up the engineering infrastructure (construction of gas, electrical networks) for plant Kalsada capacity of 300 thousand tons per year in Kyzylorda region, passing from 2020 to 2021.
In the Aral region, through the Department of Construction, Architecture and Urban Planning of the Kyzylorda region, 4 projects were implemented in the amount of 969,005.3 thousand tenge. They:
- Construction of a school house for 250 students;
- According to the project of the special event "Auyl-el Besigi", the construction of an extension to secondary school No. 19 for 100 places has been completed;
- Construction of a 40-bed hospital in the village of Saksaulsk;
- As part of the project of the special event "Auyl-el Besigi", the construction of a "sports and recreation complex" in the village of Zhaksykylysh is transitioning from 2020 to 2021.
In addition, at the expense of a private investor:
-Within the framework of the" public-private partnership", construction and installation works of a medical outpatient clinic in the Shizhaga settlement of the Aral region were completed in the amount of 126,135. 4 thousand tenge.
As of January 1, 2021, the population was provided with 24,799 square meters of living space, which is 114.7% more than last year.
Information on the work done for 12 months of 2019 in the Aral region (31.12.2019)
Work done by the Aral Regional Department of Architecture and Urban Planning
1. Construction of a landfill for solid household waste in the city of Aralsk.
The total estimated cost is 186,300. 0 thousand tenge.
Under the contract-173 324, 243 thousand tenge
Allocated funds for 2018-10 000,0 thousand tenge.
The construction contractor is RSE "Enbek Astana".
Construction-moving to 2019.
The area of land allocated for the placement of the landfill (ha) is 5.0 ha. In the north-western part of the city of Aralsk, it is being built 4 km from the city.
For the 1st stage of construction work, earthworks were carried out. The allocated funds for 2018 have been fully disbursed.
For 2019, about 36 700.0 thousand tenge was allocated, and an additional 110 199.0 thousand tenge was allocated.
It is planned to allocate 17,200. 0 thousand tenge from the 2020 budget for co-financing at the expense of the district budget.
On the allocated funds for stage 1, earthworks (excavation, excavation, crimping, etc.) and the device of soil for the elevation of the highway were carried out.
Due to technical errors (incorrect entry into the KTRU), the department's account was closed, due to the inability to timely disburse funds, the additional amount allocated for 2019 was 110 199.0 thousand tenge. the funds were returned to the budget account.
2. Works on connecting residential buildings to the central water supply system in the village of Saksaulsk, Aral district, Kyzylorda region (Within the framework of the program" Development of Regions until 2020")
Estimated cost - 343,364. 0 thousand tenge
Allocated to 2018 – 111 000,0 thousand tenge
Contractor-LLP "COMBI-STROY-I"
For 2019 allocated-200 212.0 thousand tenge.
Currently, 2,240 residential buildings are connected to the central water supply system in the village. According to the project, works on pumping water with a total length of 90,842 km were carried out, accepted by the state acceptance commission on 22.07.2019.
3. 30 000,0 thousand tenge was allocated for the construction of 2 biothermal pits from the settlements of Kulandy and Sazdy in the Aral region.
The construction contractor is BAIS-A LLP.
Under the contract-23,204. 8 thousand tenge
Construction and installation works were carried out according to the project and put into operation on 31.07.2019.
4. Funds were allocated from the district budget for the construction of a water pipeline for residential buildings in the settlement of Zhalgyzagym (86 stations) in the village of Saksaulsk in the Aral region. As a result of construction and installation works, 29 families received access to high-quality drinking water.
5. Construction of engineering and communication infrastructure (water supply works) to the Aral plant with a capacity of 300 thousand tons per year in the Aral region.
The contractor-LLP " Altyn Aidarly»
Under the contract-26,559. 1 thousand tenge.
Construction and installation works are fully completed and accepted by the state acceptance commission on 06.11.2019.
6.Funds were allocated from the district budget for the gasification and reconstruction of the boiler house of 8 objects in the city of Aralsk (kindergarten"Mereke", "Gulder", "Altyn Balyk", school No. 64 and Zhyrau house with a children's art school).
Construction work is fully completed before the heating season, heating networks are heated with gas fuel
The Department of Construction, Architecture and Urban
Planning is developing design and estimate documentation
7. (In order to provide engineering infrastructure to the areas designated for individual housing construction under the "Nurly Zher" program»)
10 200.0 thousand tenge was allocated from the district budget for the development of design and estimate documentation for the construction of water supply networks in the microdistrict No. 1. Public procurement is organized through the department.
Designer-too "it's Cheese".
Under the contract-4 284.0 thousand tenge.
Currently, in accordance with the positive conclusion of the state expertise on the project, a budget application was submitted to the Committee for Construction and Housing and Communal Services for financing in 2020.
8. (In order to provide engineering infrastructure to the areas designated for individual housing construction under the "Nurly Zher" program»)
The development of design and estimate documentation for construction of gas network, district No. 2 city of Aralsk of Kyzylorda region Bali vydeleny from the local budget - 11 396,0 thousand tenge. The development of design and estimate documentation of such works by district No. 4-14 100,0 thousand tenge. this.
Designer-state enterprise "Enbek Astana".
Currently, in accordance with the positive conclusion of the state examination of the project, budget applications have been sent to the industry departments to allocate funds for construction in 2020.
For public services
1. " Provision of raw materials for the development of construction and reconstruction projects (redevelopment, re-equipment)" - 192 public services were provided.
2. " Approval of the sketch (draft design)"-162 state services were rendered.
3. "Issuance of certificates for determining the address of real estate objects in the territory of the Republic of Kazakhstan" - 106 state services are rendered.
4. The number of individual residential buildings accepted in the month of May in the Aral region is 23 (2,814 sq. m.)
Construction works commissioned by the Department of Architecture and Urban Planning of the Kyzylorda region
In the Aral region
1. Construction of the Palace of schoolchildren for 250 seats in the city of Aralsk
The total estimated cost of the project is 333,541 thousand tenge.
SCS Engineering LLP was recognized as the winner.
Construction and installation works are underway (masonry walls).
2. General provisions Construction of a patient with 40 beds in the village of Saksaulsk of the Aral region
The contractor is LLP "ATAMEKEN".
Funds under the contract-772 800.0 thousand tenge
At the start of construction in 2019 allocated 50 000,0 thousand tenge are allocated.
Earthworks are underway (very slow) of the zero sign of the steam boiler building.
3. Construction of an additional educational building for 100 places to secondary school No. 231 in the village of Saksaulsk
To 2018 selected-50 000,0 thousand tenge.
The contractor is SCS Engineering LLP.
For the continuation of construction for 2019, 114,131. 3 thousand tenge was allocated.
Construction works were fully completed and put into operation on 23.07.2019.
4. Construction of a new house of culture in the village of Shizhaga
Total estimated cost-240 867.89 tenge
General contractor-LLP "Nur-Talap and"
The winning amount is 212 800.00 tenge
In 2018, the stipulated amount is 50 000,00 tenge
In 2018, the amount was fully disbursed.
2019 the amount considered is 162 800,00 tenge
Construction and installation work of the House of Culture has been completed. Adopted on 23.07.2019 and opened in a solemn ceremony with the participation of the Akim of the region.
Results of the work done by the Department of Architecture and Urban Planning of the Aral region as of the third quarter of 2020.
1. Construction of a biothermal pit from the settlement of Zhanakurylys in the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
All construction works were completed and accepted by the state acceptance commission on 21.09.2020.
2. Construction of a biothermal pit in the settlement of Kyzylzhar of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
All construction works were completed and accepted by the state acceptance commission on 11.09.2020.
3. Construction of a biothermal pit from the settlement of Karateren in the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
All construction works were completed and accepted by the state acceptance commission on 11.09.2020.
4. Construction of a biothermal pit from the Bogen settlement of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
The contractor-LLP " Namys-Kurylys»
All construction works were completed and accepted by the state acceptance commission on 17.09.2020.
5. Construction of a biothermal pit from the settlement of Rayym in the Aral region
The total estimated cost is 16,789. 4 thousand tenge.
The contract amount is 13,843. 9 thousand tenge.
The contractor-LLP " Namys-construction"
All construction works were completed and accepted by the state acceptance commission on 17.09.2020.
6. Construction of a 1-storey 4-apartment residential building (10 units) in the city of Aralsk. (Credit house with a preferential loan for bank depositors through JSC "Zhilstroysberbank" within the framework of the housing construction program "Nurly Zher")
General Designer - "IDI stroyproekt" LLP.
The total estimated cost of the project is 370 981.0 thousand tenge.
General contractors of construction works:
- 5 residential buildings-"Aral su-kurylysy" LLP Contract-173 775.8 thousand tenge.
- 5 residential buildings - "Nauryz Kurylys" LLP Contract-173 775.8 thousand tenge.
Along with the exterior facade of all residential buildings, brick walls were built, the roof was covered. External doors-windows were installed, internal electrical and thermal networks were installed. Drinking water was introduced. The interior plastering works have been completed, and finishing works on painting are underway.
In case of incomplete distribution of funds, the construction may be transitional for the next year.
7. Works on reconstruction (reconstruction) of the building of the district department of employment, social programs and civil registration
Allocated funds-47,082. 0 thousand tenge,
Podryachik-IP " Zhubanov And"
Under contract-40 000,0 thousand tenge.
Currently, the reconstruction of the building is fully completed. Documents are issued for commissioning by the contractor.
8. Construction of a 300-seat school in the village of Saksaulsk in the Aral region
Total estimated cost: - 864 315.0 thousand tenge
General contractor: - LLP "Energomera".
Contract amount: - 733,153,236. 48 tenge
The number of employees under the Employment Roadmap program is 125 people.
Including:
62-working with coverage of 50% of Energomera LLP»;
63-working 50 % of the population in the direction of "Aral regional employment center".
For construction and installation works, work on laying external overhead lines, water supply networks and external fencing has been completed. On the I and II blocks, work is underway to lay a brick wall. The foundation of the III-block is being installed.
9. Construction of water supply networks in Aralsk microdistrict No. 1
Allocated funds-RB-266505,0 thousand tenge, OB-40723,0 thousand tenge,
Under the contract-351 193,2 thousand tenge.
The length of water supply networks is 11.1 km
Construction work is passing in 2020-2021 years
In order to ensure a normal level of water supply to residential buildings built on the outskirts of the city of Aralsk, an additional water station is being built from the microdistrict No. 1. Work on fencing the territory of the station building has been completed. At the station, high-voltage electrical networks are supplied with electricity, and current transformers are being prepared for installation. In addition, in the microdistrict No. 1, work is underway to install a water meter with water supply in houses where there is no water supply. This project" (in order to provide engineering infrastructure to the areas identified for individual housing construction within the framework of the "Nurly Zher" program).
10. The area of land allocated for the construction of a solid waste landfill in the city of Aralsk (ha) – 5.0 ha. In the north-western part of the city of Aralsk, it is being built 4 km from the city.
Contractor-the Director of the Department of criminal - Executive system of the Ministry of internal Affairs Rogalevo-Executive system
(penitentiary) system uchrezhdeniya SCRM
Under the contract-173 324, 243 thousand tenge
For 2018, ABOUT-10 000,0 thousand tenge was allocated
For 2019, about 36,700. 0 thousand tenge was allocated
For the completion of construction works by 2020, the total amount allocated is 127,399. 0 thousand tenge.
Currently, work on the excavation and strengthening of the landfill site has been completed. Diesel power plants were installed at the site of the landfill. The installation sole of the modular house is filled in. To ensure fire safety, 50 and 10 cubic tanks and parking lots were built. The necessary devices were delivered to the beginning of the facility.
11. Reconstruction and expansion of the internal water supply network in the Shomish settlement of the Aral region (within the framework of the state program "Development of Regions until 2020")
The total cost of the project is 329,061. 0 thousand tenge.
The contractor is Stroy Dos KZ LLP.
Under the contract-276,837,446 thousand tenge.
The length of the internal water supply network is 5.7 km
Water tower - 50 m3
Currently, work is underway on the installation of the main water pipeline, partial dismantling and major repairs of the building of the old worn-out pumping station. In particular: works on plaster of walls of the building of pumping station, and also roofing works are carried out. Construction works will be put into operation on December 1 of this year.
Works in the Aral region Commissioned by the Department of Construction, Architecture and Urban Planning of the Kyzylorda region
12. construction of the Palace of schoolchildren for 250 seats in the city of Aralsk
The winner's contractor is SCS Engineering LLP.
Under contract-282 053,6 thousand tenge.
For 2019 allocated-78 390,0 thousand tenge.
From SMR:-to date, completed the loading of stone at 100 %, pouring concrete supports input vestibule (calonne), 100 %, walls of the 1st floor. 1 layer is covered with reinforced concrete coating.
The remaining funds for the full completion of construction work – 203 663.6 thousand tenge.
Including:
For the continuation of work in 2020, OB-101 832.3 thousand tenge was allocated;
Currently, construction work has been fully completed. Documents are issued for commissioning by the contractor.
13. Construction of a patient with 40 beds in the village of Saksaulsk in the Aral region
The contractor is LLP "ATAMEKEN".
Funds under the contract-772 800.0 thousand tenge.
50 000,0 thousand tenge was allocated for the start of construction in 2019. highlighted.
Work on laying the walls of households has been completed.block and building of the boiler house.
For the continuation of work in 2020, about 300,000,0 thousand tenge. funds were considered.
External and internal plastering works with a tamirbetonny covering of a roof of households are carried out.block and building of the boiler house. Work is also underway on laying the walls of the main building.
14. Construction of a "sports and recreation complex" in the village of Zhaksykylysh of the Aral region (within the framework of the project "Auyl-El besigi")
The contractor is Energomontazhnaladka LLP.
Funds under the contract-184 957,5 thousand tenge.
From the SMR, earthworks are being carried out on the zero axis.
Earthworks of the zero mark of the object have been completed. At the facility, work is underway to transport other necessary building materials with a built-in metal scheme (metal structure).
15. Construction of an extension of the educational building for 100 places to school No. 19 in the village of Zhaksykylysh of the Aral region (within the framework of the project "Auyl-El Besigi")
The contractor is Samat-Munai LLP.
Funds under the contract-201,994. 2 thousand tenge.
According to the SMR, work on laying the walls of the building has been completed, work is underway to close the roof.
Within the framework of public-private partnership
16. Within the framework of public-private partnership, it is planned to build a medical outpatient clinic in the settlement of Shizhaga in the Aral region.
alemstroy-1 LLP was involved as an investor in the implementation of the project for the construction of the facility.
By the decision of the competition commission No. 6 of 04.11.2019, alemstroy-1 LLP was recognized as implementing the project "construction of a medical outpatient clinic in the settlement of Shizhaga" within the framework of public-private partnership and signed an agreement No. 15 of 20.12.2019 with the State Institution "Health Department of the Kyzylorda region".
The contract price is 126,135. 4 thousand tenge.
Delivery time: 3 months from the date of receipt of the construction permit.
Currently, the construction work of the facility has been fully completed. Documents are issued for commissioning by the contractor.
Results of the work done by the Department of Architecture and Urban Planning of the Aral region as of July 10, 2020 (10.07.2020).
1. Construction of a biothermal pit from the settlement of Zhanakurylys in the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
2. Construction of a biothermal pit in the settlement of Kyzylzhar of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
3. Construction of a biothermal pit from the settlement of Karateren in the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
4. Construction of a biothermal pit from the Bogen settlement of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract amount is 12,994. 7 thousand tenge.
The contractor-LLP " Namys-Kurylys»
5. Construction of a biothermal pit from the settlement of Rayym in the Aral region
The total estimated cost is 16,789. 4 thousand tenge.
The contract amount is 13,843. 9 thousand tenge.
The contractor-LLP " Namys-construction"
For construction and installation works, all biothermal pits are opened along a depth of 5 m, walls with bottoms are filled with mortar of reinforced concrete structures. Work is also underway to fence the yards
6. Construction of 10 1-storey 4-apartment residential building in the city of Aralsk
Contractors:
- 5 residential buildings-"Aral su-kurylysy" LLP. Contract-173 775.8 thousand tenge
- 5 residential buildings - "Nauryz Kurylys" LLP. Contract-173 775.8 thousand tenge.
In all residential buildings, work on the overflow of the foundation has been fully completed, and work on laying the walls is underway.
Due to the incomplete distribution of funds, the construction becomes transferable for the next year.
7. Works on reconstruction (reconstruction) of the building of the district department of employment, social programs and civil registration
Allocated funds-47,082. 0 thousand tenge,
Podryachik-IP " Zhubanov And"
Under contract-40 000,0 thousand tenge.
Currently, work on the dismantling of walls, floors and doors has been completed. Doors are installed, works on internal whitewashing, finishing of painting are carried out.
8. Construction of a 300-seat school in the village of Saksaulsk in the Aral region
The contractor is LLP "Energomera".
The amount under the contract is 733,153. 2 thousand tenge.
For construction and installation works, earthworks, grinding works, as well as laying the foundation are carried out. Work on laying overhead power lines has been fully completed. Construction works are carried out in accordance with the work schedule provided by the contractor.
9. Construction of water supply networks of the microdistrict No. 1 of Aralsk, Aralsky district
Allocated funds-RB-266,505. 0 thousand tenge, OB-40,723. 0 thousand tenge,
Under contract-351 193,2 thousand tenge.
Construction work is passing in 2020-2021 years
To date, land management works are underway.
10. The area of land allocated for the construction of a solid waste landfill in the city of Aralsk (ha) – 5.0 ha. In the north-western part of the city of Aralsk, it is being built 4 km from the city.
Construction contractor-Director of the Department of the Criminal Executive System of the Ministry of Internal Affairs of the Republic of Kazakhstan of the Criminal Executive system
(penitentiary) system of institutions SMKRM Branch
Under the contract-173 324, 243 thousand tenge
For 2018, ABOUT-10 000,0 thousand tenge was allocated
For 2019, about 36,700. 0 thousand tenge was allocated
On the allocated funds for stage 1, earthworks (excavation, excavation, crimping, etc.) and the device of soil for the elevation of the highway were carried out.
For the completion of construction works by 2020 – 110 199.0 thousand tenge. funds have been allocated. For co-financing at the expense of the district budget - 17,200. 0 thousand tenge is required to be allocated to the budget of 2020.
Construction and installation works on the 2nd stage;
According to the 3rd stage, landscaping works will be carried out.
Currently, earthworks are being carried out (excavation, excavation, crimping, etc.).
Works in the Aral region Commissioned by the Department of Construction, Architecture and Urban Planning of the Kyzylorda region
11. construction of the Palace of schoolchildren for 250 seats in the city of Aralsk
The winner's contractor is SCS Engineering LLP.
Under contract-282 053,6 thousand tenge.
For 2019 allocated-78 390,0 thousand tenge.
From SMR:-to date, completed the loading of stone at 100 %, pouring concrete supports input vestibule (calonne), 100 %, walls of the 1st floor. 1 layer is covered with reinforced concrete coating.
The remaining funds for the full completion of construction work – 203 663.6 thousand tenge.
Including:
For the continuation of work in 2020, OB-101 832.3 thousand tenge was allocated;
The walls of the second floor are laid, the roofs are completely finished. Work is underway on interior decoration, painting.
12. Construction of a patient with 40 beds in the village of Saksaulsk in the Aral region
The contractor is LLP "ATAMEKEN".
Funds under the contract-772 800.0 thousand tenge.
50 000,0 thousand tenge was allocated for the start of construction in 2019. highlighted.
Work on laying the walls of households has been completed.block and building of the boiler house.
For the continuation of work in 2020, about 300,000,0 thousand tenge. funds were considered.
External and internal plastering works with a tamirbetonny covering of a roof of households are carried out.block and building of the boiler house. Work is also underway to lay the foundation of the main building.
Within the framework of public-private partnership
13. Within the framework of public-private partnership, it is planned to build a medical outpatient clinic in the Shizhaga settlement of the Aral region.
alemstroy-1 LLP was involved as an investor in the implementation of the project for the construction of the facility.
By the decision of the competition commission No. 6 of 04.11.2019, alemstroy-1 LLP was recognized as implementing the project "construction of a medical outpatient clinic in the settlement of Shizhaga" within the framework of public-private partnership and signed an agreement No. 15 of 20.12.2019 with the State Institution "Health Department of the Kyzylorda region".
The contract price is 126,135. 4 thousand tenge.
Delivery time: 3 months from the date of receipt of the construction permit.
Currently, work is underway on the fencing of the medical outpatient clinic and covering the roof of the building with a reinforced concrete coating.
Return on investment costs 2020-2023
Information on the work done by the Department of Architecture and Urban Planning of the Aral region for the first quarter of 2020
1. construction of a biothermal pit from the settlement of Zhanakurylys of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract estimate is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
2. construction of a biothermal pit in the settlement of Kyzylzhar of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract estimate is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
3. construction of a biothermal pit from the settlement of Karateren in the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract estimate is 12,994. 7 thousand tenge.
Contractor-Real Stroy Invest LLP"
4. construction of a biothermal pit from the Bogen settlement of the Aral region
The total estimated cost is 15,804. 7 thousand tenge.
The contract estimate is 12,994. 7 thousand tenge.
The contractor-LLP " Namys-Kurylys»
5. construction of a biothermal pit from the settlement of Rayym in the Aral region
The total estimated cost is 16,789. 4 thousand tenge.
The amount of winnings is 13,843. 9 thousand tenge.
The contractor-LLP " Namys-construction"
All biothermal pits for construction and installation works are opened along a depth of 5 m, walls with bottoms are filled with mortar of reinforced concrete structures.
6. contractors for the construction of 10 1-storey 4-apartment residential building in the city of Aralsk
- 5 residential buildings-"Aral su-kurylysy" LLP. Contract-173 775.8 thousand tenge
- 5 residential buildings - "Nauryz Kurylys" LLP. Contract-173 775.8 thousand tenge.
A contract has been concluded and recommended for registration with the Treasury Department. Preparatory work for the construction works is underway.
7. works on reconstruction (reconstruction) of the building of the district department of employment, social programs and civil registration
Works on public procurement were carried out by means of a tender. Due to the fact that the first winner did not sign the contract on time, work is underway with the second winner to conclude the contract.
8. Construction of a 300-seat school in the village of Saksaulsk in the Aral region
The contractor is LLP "Energomera".
Under the contract-733,153. 2 thousand tenge.
A contract has been concluded and recommended for registration with the Treasury Department. Preparatory work for the construction works is underway.
9. land allocated for the construction of a solid waste landfill in the city of Aralsk (ha) – 5.0 ha. In the north-western part of the city of Aralsk, it is being built 4 km from the city.
Contractor-the Director of the Department of criminal-Executive system of the Ministry of internal Affairs of the penal system (prison) system of institutions Branch SCRM
Under the contract-173 324, 243 thousand tenge
For 2018, ABOUT-10 000,0 thousand tenge was allocated
For 2019, about 36,700. 0 thousand tenge was allocated
On the allocated funds for stage 1, earthworks (excavation, excavation, crimping, etc.) and the device of soil for the elevation of the highway were carried out. For the completion of construction works by 2020 – 110 199.0 thousand tenge. funds have been allocated. For co-financing at the expense of the district budget - 17,200. 0 thousand tenge is required to be allocated to the budget of 2020.
Construction and installation works on the 2nd stage;
According to the 3rd stage, landscaping works will be carried out.
Works in the Aral region commissioned by the Department of Construction, Architecture and Urban Planning of the Kyzylorda region
10. construction of the Palace of schoolchildren for 250 seats in the city of Aralsk
The winner's contractor is SCS Engineering LLP.
Under contract-282 053,6 thousand tenge.
For 2019 allocated-78 390,0 thousand tenge.
From SMR:-today completed the pouring of the Foundation 100 %, pouring concrete supports input vestibule (calonne), 100 %, walls of the 1st floor. 1 layer is covered with reinforced concrete coating.
The remaining funds for the full completion of construction work – 203 663.6 thousand tenge.
Including:
For the continuation of work in 2020, OB-101 832.3 thousand tenge was allocated;
Work is underway on the second floor of the calonne.
11. Construction of a patient with 40 beds in the village of Saksaulsk in the Aral region
The contractor is LLP "ATAMEKEN".
Funds under the contract-772 800.0 thousand tenge.
50 000,0 thousand tenge was allocated for the start of construction in 2019. highlighted.
Work on laying the walls of households has been completed.block and building of the boiler house.
For the continuation of work in 2020, about 300,000,0 thousand tenge. funds were considered.
Work is underway to cover the roof of the building of the utility block and the boiler room with a tamir concrete coating.
Public-private partnership
12. Within the framework of public-private partnership, it is planned to build a medical outpatient clinic in the settlement of Shizhaga in the Aral region.
alemstroy-1 LLP was attracted as an investor for the implementation of the project of construction of the facility.
By the decision of the competition commission No. 6 of 04.11.2019, alemstroy-1 LLP was recognized as implementing the project "construction of a medical outpatient clinic in the settlement of Shizhaga" within the framework of public-private partnership and signed an agreement No. 15 of 20.12.2019 with the State Institution "Health Department of the Kyzylorda region".
The contract price is 126,135. 4 thousand tenge.
Delivery time: 3 months from the date of receipt of the construction permit.
Currently, construction and installation works of the outpatient clinic are underway.
Return on investment costs 2020-2023