Information in the field of heat supply
In pursuance of the election program "A Just Kazakhstan – for all and everyone. Now and forever," work is underway to reduce the depreciation of heating networks to 43% by 2029.
In the region, heat supply is provided by 20 enterprises, including 19 of which are in state communal ownership.
In total, there are 4 CHPPs and 113 boiler houses, 698 autonomous heating systems operating in the region. The average depreciation of heat sources as of 1.01.2026 is 40.5%.
The total length of heating networks in the region is 759.230 km, of which the length of main lines is 201.826 km, and intra-block lines are 557.404 km. The average depreciation of heating networks as of 1.01.2026 is 43%. As part of the 2026 repair campaign, the average depreciation of heating networks is planned to be reduced from 43% to 42.8%.
To ensure uninterrupted heat supply in 2026, about 7.5 billion tenge has been allocated from the budget (RB 2.7 billion, OB 2.0 billion tenge, Government reserve 2.8 billion tenge), including 4.7 billion tenge for the repair and reconstruction of heating networks (repair of 4.06 km), and 2.8 billion tenge for the reconstruction and repair of thermal equipment and the purchase of boiler equipment (Government reserve).
Within the framework of the national project "Modernization of the Energy and Communal Sectors" for 2026-2029, it is planned to implement 7 projects totaling 7.6 billion tenge for the reconstruction of 4.5 km of heat supply networks (Kostanay, Lisakovsk, Rudny, Zhitikara).
Information in the field of power supply
Electricity production in the region is carried out by 8 energy sources with a total installed capacity of 459.6 MW (Kostanay CHPP, Kostanay CHPP-2, CHPP of JSC "SSGPO", Arkalyk CHPP, WPP "Ybyrai", WPP of LLP "KazWindEnergy", WPP of LLP "Aspan Energo", SPP of LLP "Altyn Solar Energy"). The region receives the missing volume of electric energy from the Single Purchaser.
Transmission and distribution of electric energy is carried out by 4 private enterprises (LLP "Mezhregionenergotranzit", LLP "EPK-forfait", LLP "EPK-Atica", LLP "Kun ElektrSet") and 3 state communal enterprises (SCE "Kostanayuzhelektroservis", SCE "Lisakovskgorkommunenergo", SCE "Zhitikarakommunenergo").
The total length of the region's power supply networks is 27,110.1 km. The average depreciation of power supply networks is 64.5%.
The issue of developing the region's power supply system is of strategic importance today.
Currently, the issue of reconstructing the power supply system of the city of Arkalyk, Amangeldy and Dzhangeldy districts is being worked out. In 2023, design and estimate documentation was developed for the reconstruction of 37.8 km of power supply networks, 3 substations, and 4 distribution points in the city of Arkalyk. The total project cost is 9.1 billion tenge. This project is included in the Comprehensive Development Plan of the Torgai region.
Also, this year, the construction of the "Batys – Zapadnaya" line was completed, which will relieve existing substations by 35 MW and further distribute this capacity for the development of the regional center.
In order to strengthen the power supply scheme of the regional center, as well as due to the limitation of free capacity at existing substations, this year the development of design and estimate documentation began for the construction of 3 new substations in the southern and central parts of the city, as well as on the territory of the Industrial Zone. At the same time, the construction of the "Ortalyk" substation is planned.
In addition, the Energy Department is working on the development of a Regional Scheme for the Development of Electric Networks in the Kostanay region until 2030 with a perspective until 2050, with a total cost of 29.3 million tenge. The regional scheme will contribute to effective planning of new capacity commissioning, ensuring the reliability of power supply, etc.
Information in the field of housing and communal services
In the Kostanay region, the implementation of the republican program "Taza Qazaqstan," aimed at improving the environmental situation and the improvement of settlements, continues.
In 2025, 13.4 billion tenge was allocated for its implementation, directed towards street lighting, renovation of multi-apartment buildings, improvement of parks and squares, installation of children's and sports grounds, landscaping, demolition of dilapidated buildings, and installation of fences.
80 public spaces were improved, 26 children's and sports grounds were repaired, and 164 were installed. Works were carried out on laying paving stones, installing small architectural forms, lighting, irrigation systems, and creating recreation areas.
108 multi-apartment residential buildings were renovated for 3.9 billion tenge. Demolition of more than 800 dilapidated buildings was carried out.
In 2026, work continues as planned: Repair of external walls and roofs of 76 multi-apartment residential buildings, installation and repair of 92 children's playgrounds and sports grounds, improvement of 104 parks, squares, and alleys, demolition of more than 457 dilapidated buildings, installation of 11.6 thousand lighting fixtures, as well as work on laying paving stones, installing small architectural forms, ensuring sanitary cleaning of settlements, cleaning and removal of unauthorized landfills, etc.
Also, an eco-park project is being implemented within the framework of the project "Reconstruction of the northern part of the Pritobolsky Park in Kostanay" with an area of 40 hectares, costing 222.5 million tenge, with completion in September 2026.
For 2026, the approved volume of planting green spaces in the settlements of the Kostanay region is 77.3 thousand seedlings (49.4 thousand trees and shrubs have been planted), as well as 1.5 million perennial and annual flowers of different varieties, active work on which is planned from May of this year. In this area, the key task is not only to achieve the planned indicators for the number of planted trees but also to ensure their survival.
Information in the field of water supply and sanitation
By the end of 2025, access to water supply services in the Kostanay region reached 100% in both urban and rural settlements.
The urban population is 524,366 people, or 9 settlements, including 6 cities and 3 townships.
The rural population is 297,098 people, or 492 rural settlements, the water supply coverage was:
- 250 villages (250,232 people or 84.2%) have centralized water supply;
- 34 villages (13,976 people or 4.7%) have integrated block-modules installed;
- 152 villages (24,794 people or 8.3%) have water distribution points for delivered water;
- 2 villages (68 people or 0.1%) receive water delivery (refused water distribution points);
- 54 villages (8,028 people or 2.7%) are provided with wells and boreholes (refused centralized water supply and water distribution points).
For 2026, 4.4 billion tenge is provided from the regional budget for the implementation of 10 water supply and sanitation projects.
In addition, within the framework of the National Project "Modernization of the Communal and Energy Sectors," it is planned to implement 4 water supply and sanitation projects through the issuance of government securities totaling 5.4 billion tenge.
The implementation of the above projects will reduce the depreciation level of water supply networks from 29.9% to 29.7%, and sanitation networks from 57.9% to 57.7%.
Information in the field of gas supply
In the region, as of January 1, 2026, out of 484 settlements, 87 are gasified (5 cities, 2 urban-type settlements: Kachar settlement of the city of Rudny and Oktyabrsky settlement of the city of Lisakovsk, as well as 80 rural settlements), which is 17.9%.
The level of the gasified population in the region is 60.4% (496,043 people out of 821,464 people).
In 2025, 3,490.3 million tenge was allocated for the implementation of 6 projects (4 – construction and installation works, 2 – design and estimate documentation) for gas supply to the region's settlements. By the end of 2025, 100% of budget funds were utilized, and 3 gas supply facilities were put into operation, including:
- from the AGDS of the village of Auliekol to the village of Dievka with the connection of the village of Novoselovka, Auliekol district (facility acceptance certificate dated 29.10.2025);
- in the village of Dievka, Auliekol district (facility acceptance certificate dated 22.10.2025);
- in the villages of Lesnoye, Berezovka, Fedorovka district (facility acceptance certificate dated 28.11.2025).
As a result of the implementation of the above projects, access to gas supply networks was provided to residents of the villages of Auliekol and Fedorovka districts, totaling 2,953 people.
This year, 425.198 million tenge (RB – 386.543 million tenge, MB – 38.655 million tenge) has been allocated to continue the implementation of the gasification project for the settlement of Kushmurun, Auliekol district. Completion of the facility's construction is planned for 2027.
Under this project, access to gas supply networks will be provided to residents of the Kushmurun settlement, with a population of 7,204 people.