By heating season
For the 2019-2020 heating season. Karasu district imported only 31.24 thousand tons of coal (a total of 33.99 thousand tons), including budget organizations-8,699 thousand tons, for the needs of the population - 19.0 thousand tons, state utilities - 5.7 thousand tons.
Two new hot water boilers were purchased for schools in the villages of Lublinka and Herceno at a total cost of 6 million 267 thousand tenge.
New chimneys and flues were purchased and installed for the kindergarten "Balapan" of Karasu village and the Ilyichevsk secondary school at a cost of 4 million 65 thousand tenge.
Connection to centralized heating of multi-apartment residential buildings in the village of Karasu at the address Isakov 69, Komsomolskaya 31A, 31 and 33 was made.
In 2019, the object "Breeding networks of water supply in the village of Chelgashi" was commissioned and put into operation, the total amount of which was 907.7 million tenge. It is 28, 356 km long. Due to the implementation of this project, water was supplied to 489 houses.
Repair of highways
In 2019, the current and average repair of roads with a total length of 42.4 kilometers was completed. the amount of allocated funds amounted to 1 billion 558.2 million tenge.
Highways of regional significance
Contractor "VAN" LLP, the cost of SMR 460 million 320 thousand tenge;
Technical supervision of "Kurylysta Expertise" LLP cost 12 million 682 thousand 553 tenge.
Contractor "Sarykoldorstroy" LLP, cost of SMR 383 million 040 thousand tenge;
Technical supervision of "DSK KZ" LLP 10 million 244 thousand 135 tenge.
Contractor LLP "Serializearray", with-th CMP 193 million 760 thousand tenge;
Technical supervision of "DSK KZ" LLP 2 million 157 thousand 984 tenge.
Roads of regional significance
"The first implemented project this year is the average repair of the entrance to the village of Zhambyl " from 7 to 14 km. Contractor LLP " van "amount under the contract 227 million 700 thousand tenge, Technical supervision is LLP" Kurylys-Expertise " amount of 2 million 905 thousand tenge. All work was completed on time and 100 %.
A two-year contract was signed with van LLP for the repair of the Karasu bypass road from 0 to 3,775 km in the amount of 106 million 048 thousand 626 tenge with the term of performance of works until September 2020. Technical supervision is provided by Tender Consulting Company LLP. the contract was signed for 631 thousand tenge. At the moment, work has been completed on the 3.675 km section.
In the course of public procurement for road repairs
"October-Chagasi" with a length of 4 km a winner too "Serializearray" the cost of SMR is 95 863 million 731 thousand tenge. All work was completed on time and 100 %.
For 2020, competitive procedures for average road repairs have been completed
Regional significance with a total cost of 2 billion rubles. 777 million 921 thousand tenge:
"Karasu-Bolshaya Churakovka" 25-43 km with repair of artificial structures 964 130 494.00 tenge
"Koibagor Karasu Sevastopol 83-124 km" with repair of artificial structures 1 813 791 131.99 tenge
District value of 723 million 709 thousand tenge:
"Average repair of the highway of regional significance KR-KK-26" Entrance to the village of Komsomolskoe "0-14 km" 375 007.0 thousand
"Average repair of the highway of regional significance KR-KK-18" Entrance to the village of Amangeldy "0-5, 35 km" 139,924,9 thousand
"Average repair of a section of the highway of regional significance KR-KK-2 "Karasu-B. Churakovka" - Novoselovka-Novopavlovka-Kushmurun "0-6 km" 202 225.2 thousand tenge.
Total amount of techs.supervision of objects 6 552.0 thousand tenge
Intra-village roads cost 37 million 440 thousand tenge:
Oktyabrskoe village Gorky street 20092.0 thousand tenge
Oktyabrskoe St. Kalinina 17 348.0 thousand tenge.