Analytical information for the 1st quarter of 2020

Housing and Utilities

Energy complex

Electricity consumption in the region for the 1st quarter of 2020 amounted to 1294.9 million kWh, which is 0.5% higher compared to the same period last year (1287.7 million kWh).

The volume of electricity generated by the region’s own sources for the current period amounted to 312.0 million kWh, which is 19.2% higher compared to the same period last year (261.7 million kWh). An increase in the volume of electric energy production occurs due to an increase in the volume of electric energy generated for own needs of the Rudnenskaya TPP.

Gas supply

In the region, out of 529 settlements, 70 are provided with natural gas, including: the cities of Kostanay, Rudny, Lisakovsk, Zhitikara and part of the villages of Altynsarinsky, Auliekolsky, Zhitikarinsky, Denisovsky, Karabalyksky, Kostanaysky, B. Maylin, Kamystinsky, Fedorovsky districts.

The total length of the region’s gas distribution pipelines as of April 1, 2020 is 3,907.5 km.

The volume of natural gas consumption in the 1st quarter of 2020 decreased compared to the previous year (324.1 million cubic meters) by 6.7% and amounted to 302.3 million cubic meters. The decrease in consumption is associated with a decrease in gas consumption for the generation of thermal energy in the region's heat sources.

In 2020, 1,790.8 million tenge was allocated from the republican and regional budgets for gasification projects (RB - 1,337.2 million tenge, MB - 453.6 million tenge).

This year gasification of the regional centers will be completed. Fedorovka and with. Auliekol.

The implementation of 3 construction projects for high pressure gas supply pipelines continues: Kamysty-Altynsarino of the Kamystinsky district, from the gas distribution station of the village of Auliekol to the village of Kushmurun with the connection of the village of Chernigovka of the Auliekolsky region, to the village of Sheminovka and the village of Ozernoye, Kostanai district.

In addition to the 5 rolling construction objects mentioned above, the implementation of the project “Construction of gas distribution networks in s. Koskuduk of Altynsarinsky district of Kostanay region.

Also, at the expense of the regional budget, development of the projects “Construction of gas distribution networks in the village of Kushmurun in Auliekolsky district”, “Construction of gas distribution networks in the village Altynsarino of the Kamystinsky district "," Construction of a gas supply pipeline from the gas distribution station of the village of Auliekol to s. Dievka with connection s. Novoselovka Auliekolsky district ".

Project implementation incl. will increase the general access to central gas supply to 571 thousand people, or 65.8%, and increase the number of gasified settlements to 72 units. (or 13.6%).

Water supply and sanitation

As of April 1, 2020, out of 529 settlements, 183 settlements (34.6%) are provided with centralized water supply from group and local water pipelines, drinking water is delivered in 30 settlements (5.7%), 316 settlements (59 , 7%) are provided with water from decentralized water supply sources (wells, wells).

Under the “Nurly Zher for 2020-2025” program for 2020, funds were allocated from the republican and local budgets in the amount of 10.2 billion tenge for the implementation of 36 water supply and sanitation projects (10 - urban, 26-rural).

In general, the implementation of 26 rural water supply projects will make it possible for the first time to provide centralized water supply to 34 villages (30.5 thousand people), to improve water supply in 6 villages (18.1 thousand people).

By the end of 2020, it is planned to commission 13 rural water supply facilities, which will improve water supply for 3 villages or 12.7 thousand people, for the first time connect 14 villages or 10.5 thousand people to the water supply system, while the provision of villages in the region is centralized water supply system will increase from 33.5% to 36.1% (from 174 villages to 188).

For the purpose of further work on water supply to settlements, 40 projects on rural water supply are being developed (estimated cost 33.7 billion tenge), within the framework of which water supply will be improved in 6 villages (20.7 thousand people), 39 villages (38.4 thousand people) will be connected for the first time to centralized water supply, 22 villages (12.9 thousand people) have built water treatment and distribution points.

 

Дата публикации
08 июня 2020
Дата обновления
08 июня 2020
Тип
Analytics

Сейчас читают

Information
22 сентября 2022
Information on the implementation of water supply and sanitation projects under the National Project and State Program
Information
15 июня 2021
Principles of the Administrative and Procedural Code of the Republic of Kazakhstan
Information
01 мая 2021
Information about vacant positions

Социальные медиа

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты