Automotive network infrastructure
In 2023, work was completed on a two-year project (2022-2023) for the average repair of the 12.6 km long Tobol-Novoilinovka-Pavlovka-Apanovka-Yevgenovka road, for which 459 million tenge was allocated from the regional budget, the work was completed in full. The contractor is Lisakovskrudstroy LLP.
As well as the average repair of the Tobol-Priozernoye highway with a length of 5 km, the total amount of the project was allocated – 392 796.0 million tenge. The contracting organization of "ALUMINSTROY" LLP. To date, the asphalt of the lower layer has been laid (3.5 km of 5.2 km have been laid). The project is a two-year one (2023-2024).