Highways:
In the village of Shelek, including narrow streets, 121 streets with a length of 130.59 km, of which 63.72 km - 49 streets with asphalt pavement, 66.89 km-with rocky ground.
There are 10 streets along the village of May, a total of 6.62 km, of which 6.02 km are asphalt, 0.61 km are stone-dirt.
There are 2 streets in the village of torgaybaz, only 0.81 km, with asphalt pavement.
Drinking water:
Shelek village-54.7 km. or 60% (the remaining 40% use water drainage devices). The village of May is 8 km. or 100% centralized. The village of torgaybaz uses artesian water.
The length of the water supply networks in the village of Shelek, built in 1959, is 54.7 kilometers. Of these, 41 kilometers are made of cast iron, the rest are made of iron pipes.
In 2021, Kazgiprovodkhoz Kurylys LLP prepared design and estimate documentation for the modernization and construction of water supply networks in the village of Shelek. In order to provide the village of Shelek with clean drinking water, design and estimate documentation has been prepared and passed state expertise for work on laying 124 km of drinking water systems. In 2023, work is expected on the modernization and construction of drinking water systems.
Gasification works:
Gasification of the village of Shelek is carried out by "APL CONSTRUCTION" LLP.
Number of houses connected to natural gas -1500,
The number of houses ready to be connected to natural gas is 190,
The length of the laid pipes is 138,942. 2 m. Of these, the average pressure is 9986.3 m., the low pressure is 128,955.9 m. 6 gas distribution cabinets are involved. In total, to provide natural gas to the village of Shelek, it is necessary to place 10 gas distribution cabinets. In 2023, it is planned to build the remaining 4 gas distribution cabinets.
Electricity:
The total length of electric networks in the rural district is 370.24 km . There are 112 KTP/TP units. 70 percent or 259.1 km of electric networks in the rural district need to be updated.
Block-modular boiler:
In order to provide centralized natural gas to multi-apartment residential buildings No. 2 Zhibek Zholy and No. 4 Zhibek Zholy of the village of Shelek, the construction of a block-modular boiler house has begun. Next year, it is planned to place and launch a total of 4 block-modular boiler houses, provide gas to 7 multi-apartment residential buildings.