Information on investment projects Industrialization maps (Entrepreneurship support maps)

The Industrialization Map (Entrepreneurship Support Map) of Akmola Oblast includes 113 projects totaling 516.0 billion tenge with the creation of 11.9 thousand permanent jobs.

As of June 1, 2020, 88 projects were commissioned in the amount of 310.5 billion tenge, 9.2 thousand jobs were created:

In 2010, 10 projects were commissioned with a total value of 73.2 billion tenge, 3,017 jobs were created, of which the largest:

- Further development of the Vasilkovsky gold deposit and construction of a gold recovery factory of Altyntau Kokshetau LLP (Zerenda district, project cost 58.5 billion tenge, capacity — up to 12.5 tons, put into operation in May 2010, 2264 jobs);

- Construction of a factory for the production of ceramic bricks by “ENKI” LLP (Kokshetau, the project cost — 6.2 billion tenge, capacity — 60 million pieces, put into operation in December 2010, 250 jobs);

- Construction of a factory No. 2 for the production of soft drinks of “Kokshetau Mineral Waters” JSC (Kokshetau, project cost — 665 million tenge, capacity — 52.6 million bottles or 35.3 million liters, put into operation in November 2010 g., 8 jobs).

In 2011, 14 projects were commissioned in the amount of 18.4 billion tenge, 670 permanent jobs were created, of which the largest:

- Construction of a dairy plant of “Rodina” Agrofirm LLP (Tselinogradsky District, project cost — 557.8 million tenge, capacity — up to 18.2 thousand tons, put into operation in December 2011, 25 jobs);

- Plant for the production of chemical plant protection products of “Astana-Nan Chemicals LLP” (Stepnogorsk, the project cost — 500 million tenge, capacity — 12.6 million liters, commissioned in December 2011, 40 jobs).

In 2012, 6 projects were commissioned in the amount of 7.1 billion tenge, 380 permanent jobs were created, of which the largest:

- Organization of the production of collective concentrates with a capacity of 1.5 thousand tons per year of “SARECO” LLP (Stepnogorsk, the project cost — 4.4 billion tenge, capacity — 1.5 thousand tons of collective concentrates, put into operation in December 2012 g., 270 jobs).

- Modernization of the plant for the processing of natural aseptic milk with a capacity of 15.6 million liters per year of “Milk project” LLP (Zerenda district, the project cost — 236.1 million tenge, capacity — 15.6 million liters of dairy products, was commissioned in operation in December 2012, 3 jobs).

In 2013, 9 projects were launched in the amount of 3.5 billion tenge, 433 permanent jobs were created, of which the largest:

- JSC “Tynys” — development of foundry for gasified models with a capacity of 1000 tons per year (Kokshetau, project cost — 625.7 million tenge, 60 jobs were put into operation in December 2013);

- “Novopek” LLP — modernization of the production of polypropylene packaging with an increase in capacity by 1.5 million big bags per year (Kokshetau, project cost — 180 million tenge, commissioned in April 2013, 16 jobs).

In 2014, 10 projects were commissioned in the amount of 19.1 billion tenge, 746 permanent jobs were created, of which the largest:

- Reconstruction of the sulfuric acid plant of “SP SKZ-Kazatomprom” LLP (Stepnogorsk, the project cost 13.1 billion tenge, capacity — 180 thousand tons, 140 jobs);

- Poultry farm LLP "Ush Bulak 2005" (Akkol district, project cost 2.3 billion tenge, capacity — 90 million pieces, 200 jobs);

- Production of polyethylene products of “Polymer Plast” LLP (Shortandy district, project cost 161.6 million tenge, design capacity — 1500 tons of products per year, 37 jobs).

In 2015, 8 projects were launched in the amount of 23.4 billion tenge, 742 jobs were created, of which the largest:

- Creation of a broiler poultry farm of “Capital Projects Ltd” LLP (Tselinograd district, the cost of 15.1 billion tenge, capacity — 20 thousand tons, 250 jobs);

- Creation of a meat processing enterprise LLP "MPZ Bizhan" (Kokshetau, cost — 1.1 billion tenge, capacity — 5000 tons, 120 jobs);

- Development of the nomenclature of spherical bearings of JSC "EPK Stepnogorsk" — (Stepnogorsk, cost — 129 million tenge, capacity — 17.4 thousand units, 29 jobs).

In 2016, 15 projects were introduced in the amount of 13.9 billion tenge, 845 jobs were created, of which the largest:

- The Kazakhstan-Belarus Industrial and Technological Park of Agricultural and Communal Engineering “Kazakhstan Agro Innovation Corporation” LLP (Kokshetau, cost — 3.4 billion tenge, capacity — 4500 units, 232 jobs);

- Construction of a plant for the production of natural stone products from “Turan Industry” LLP — (Shortandy district, cost — 1 billion tenge, capacity — 130 thousand square meters, 50 jobs);

- Reconstruction of a mining and processing plant for processing copper and molybdenum ores from the Kyzyltu deposit of “Stepnogorsk Mining and Chemical Combine” LLP (Stepnogorsk, cost — 970.8 million tenge, capacity — 1 million tons of ore, 227 jobs).

In 2017, 7 projects were launched in the amount of 95.4 billion tenge, 1,119 jobs were created, of which the largest:

- Construction of a cement plant of “PO Kokshe-Cement” LLP (Birzhan sal district, cost — 63.1 billion tenge, capacity — 2 million tons, 650 jobs);

- Construction of a gold recovery plant at the Aksu mine of “Kazakhaltyn Technology” LLP (Stepnogorsk, cost — 11.8 billion tenge, capacity — up to 1100 kg of Dore alloy, 103 jobs).

In 2018, 4 projects were launched in the amount of 52.3 billion tenge, 1,146 jobs were created, of which the largest:

- Construction of a broiler poultry farm with a productivity of 60 thousand tons in live weight per year at “Makinsk Poultry” LLP (Bulandy district, cost — 45.6 billion tenge, capacity — 60 thousand tons, 910 jobs);

- Modernization and expansion of a new line for the production of ceramic stone and blocks of “Astana Ceramic” LLP (Tselinograd district, cost — 3.8 billion tenge, capacity — 30 million pieces, 60 jobs).

In 2019, 5 projects were launched in the amount of 4.0 billion tenge, 139 jobs were created, of which the largest:

- Complex for the production of instant cereals and cereal LLP "Urozhay" (Zhaksy district, cost — 2.6 billion tenge, capacity — up to 50 tons per day, 29 jobs);

- Construction of a poultry farm LLP "Blic Terminal" (Zerenda district, cost — 2100 tons, 30 jobs).

Дата публикации
09 июня 2020
Дата обновления
09 июня 2020
Тип

Сейчас читают

Information
14 марта 2024
19 декабря 2023
Центр приема граждан
31 октября 2023

Социальные медиа

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты