
Regional perspective plan for the development of health infrastructure in Akmola region until 2026
In 2018, the implementation of the Regional long –term plan for the development of health infrastructure in the Akmola region (hereinafter-RPP) was launched. Last year, 100% completed activities related to changing the configuration of the network of hospital and outpatient organizations, optimized 13 hospital organizations, created 5 clusters:
1) the Akmola TB dispensary was reorganized.Kurmanbayeva for 312 beds by joining an inter district TB dispensary in Stepnogorsk;
2) a Regional mental health center with 719 beds has been established,
3) multi-specialty regional hospital with 775 beds
4) multidisciplinary regional children's hospital with 320 beds
5) multi-specialty city hospital with 270 beds.
2 outpatient organizations were reorganized:
1) WWII polyclinics in a structural division of a City polyclinic;
2) polyclinics of the city hospital No. 2 to the primary health care Center – an independent legal entity.
The result of these measures is a reduction of 7 units of legal entities, optimized 135.75 units of units, savings amounted to 187.4 million tenge.
The following activities are planned for the RPP this year:
1) material and technical equipment at the expense of the local budget for 1.3 billion tenge (53 units of medical equipment and 10 units ambulance vehicles);
2) construction of 5 objects (Oncology clinics in Kokshetau, medical aid at the station 42-departure of Arshaly district, 3 medical outpatient: 25 visits per S. Bastau Atbasar district, s. stepne Shortandy district and 50 visits p. Sofiivka Tselinograd district), launched in 2018, it is planned to complete in 2019, with the exception of the Oncology clinic (2020). In addition, this year started construction of a polyclinic for 100 visits per shift in and.Kosshy of Tselinograd district (2019-2020).
Also, it is planned to build: 2 outpatient clinics (VA) for 25 visits per shift each in the village of Karaotkel of Tselinograd district (2019-2020), a PHC Center for 50 visits per shift in the village of Koyandy of Tselinograd district;
3) capital repairs of 9 objects for 652.8 million tenge:
- internal heating and ventilation systems of the pediatric Department of the city polyclinic of Kokshetau;
- premises of the pediatric Department of the city polyclinic of Kokshetau;
- the children's Department of Shortandy district hospital;
- external networks of water supply and Sewerage, electricity supply of the Akmola regional center for mental health;
- garages and landscaping of territories of the Regional ambulance station;
medical point in the village Kanskoe Garinskogo district;
- buildings of the Multidisciplinary regional children's hospital (three-story medical building, food service building, garage #1,2,3);
- outpatient clinic in the village of Zhaltyr, Astrakhan region;
- dormitory buildings (replacement of window blocks on the 1st and 2nd floor) Kokshetau higher medical College;
4) closing of 5 medical centers (MP):
- MP s.Arshaly district of the Donetsk population of 392 people serving the Canary ISLANDS (0.8 km);
- 4 MP does not meet the State standard of the network, that is, the population is less than 50 people. the distance to the nearest medical organization (MO) is no more than 5 km (MP).Proletarka of Atbasar district 7 people. to the nearest MO 3 km; MP in the villages of Kargaly (47 people), Ekpendy (35 people), Sulukol (12 people) Korgalzhyn district to the nearby MO 5 km).
5) reorganization of 6 outpatient organizations (bringing the network into compliance with the State standard):
- 3 paramedic-midwifery stations (FAP) (2 in VA) in the villages of Petrovka, Astrakhan district 1502 people. and Stepnoye, Shortandinsky district 2843 people. (standard from 1500 to 10000 people) and Kalachi of Esil district 200 people in MP (standard from 50 to 800 people);
- 2 MP in the villages of Kyzylzhar of Tselinograd district 928 people, Zhaltyrkol of Arshalyn district 850 people and VA of Nauchnoe village of Shortandinsky district 1227 people in the FAP (standard from 800 to 1500 people).