Information about the work Of the Department of culture and language development of Sandyktau district for the first half of 2020.
by RDC
The district's network of club enterprises includes 23 state-owned club enterprises: RDC, SDK-12; SK-10. All club institutions are on the balance sheet of the RDC and are strengthened by staff units.
For the 1st half of 2020 the total amount of financing for the industry
the total amount of culture was 104069.6 thousand tenge.
The Republican budget is 263128.2. tenge. According to the DKZ for current repairs).
The local budget amounted to 93763.0 thousand tenge.
To date, the RDC and KFOR carry out repairs of roofs, facades, and heating systems.
Overhaul of the rural house of culture in the village of Veseloe for 98605.1 thousand tenge. Competition using a special procedure contractor LLP "Dayana Service" Head Makazhanov Batyrbek Zhanibekovich, work started on may 25 this year through the employment center are 12 jobs. The salary Fund is 1 million 020 thousand tenge. per month.
Current repairs in the madeniyet house of culture for 37,498. 0 thousand tenge., an open competition was held by the contractor IP Usembayev, Almaty, the head of Usembayev Yerkebulan Bakhytovich, work has begun on dismantling the roof and ceilings. 5 pass through the employment center
Current repair of Vasilievsky rural house of culture 40000.0 thousand tenge. The competition with the use of special procedures, the contractor LLP "Zhasyl Otan", Kokshetau Urunbayev Anvar Mukhtarovich, delivered materials for the heating system at the moment, the pipe is laid, work is underway to install cast-iron radiators, the roof is being cleaned. 5 workers pass through the employment center.
Current repair of Novonikolsky rural house of culture 40000.0 thousand tenge. The competition with the use of special order, the contractor SP Zhdanov, the head of the Zhdanov Valery. Work is underway to remove the roof. installation of rafters and crates, disassembly of the building facade. The ceiling and floors were dismantled. 5 jobs pass through the employment center. The salary Fund is 425 thousand tenge. per month.
Current repair of the roof of the RDC building in the village of Balkashino 21,397. 0 thousand tenge. Anvar Mukhtarovich urunbayev, contractor of "Zhasyl Otan" LLP, Kokshetau, held an open competition. work has started on cleaning garbage from the attic and preparing crates for professional flooring. 3 workers pass through the employment center. The salary Fund is 255 thousand tenge. per month.
Current repair of the internal heating system of the RDC building for 10,496. 0 thousand tenge. a competition was held with preliminary qualification selection contractor krofas LLP, Kokshetau
7. Current repair of the building of the district house of culture for 15,132. 1 thousand tenge. The competition with the use of special procedures, the contractor LLP "Zhasyl Otan", Kokshetau Urunbayev Anvar Mukhtarovich. Materials have been delivered and work has begun on dismantling the stoneware slabs. Work is underway to insulate the walls. 2 workers pass through the employment center.
Current repair of the building of the Central district library of the village of Balkashino 20 365.0 thousand tenge. The competition with the use of special procedures, the contractor LLP "Zhasyl Otan", Kokshetau Urunbayev Anvar Mukhtarovich. The first floor has been completed for plasterboard wall finishing, the entrance group's plasterboard sheets are being dismantled and installed , and the walls are being leveled. 3 workers pass through the employment center. The salary Fund is 255 thousand tenge. per month.
Current repair of DC in madeniyet village for 22138.6 thousand tenge. The competition with the use of special order, the contractor Yip Eginbaeva M. B. Kokshetau. Windows and floors were measured.
Current repair of RDC b for 12 448.6 thousand tenge. The competition with the use of special order, the contractor Yip Eginbaeva M. B. Kokshetau. Measurements of Windows and tiles were made.
Current repair of the heating system of the Novonikolsky SDK for 9,760. 0 thousand tenge. The competition with the use of special procedures, the contractor LLP "Zhasyl Otan", Kokshetau Urunbayev Anvar Mukhtarovich.
Current repair of the building of the Central regional library 4360,2 thousand tenge s. Balkashino Competition with the use of a special order contractor LLP "Stroy MONTAZH" Kokshetau
The number of events for the first quarter is 1391, the number of visitors is 43205. The number of club formations is 275, with 3002 participants.
In the district there are 3 groups awarded the honorary title "people's" folk group "Zhuravushka" Balkashinsky RDC, folk choir "Native tunes" Balkashinsky RDC, folk group "Bereginya" Spassky SDK.
Five specialists attended a workshop and master class in Kokshetau on the preparation of the"Regional review of folk art of Akmola zhuldyzdary".
Libraries
The library network of the Sandyktau CBS consists of 11 libraries, including 1 CRH and 10 rural branch libraries. Compared to the first half of 2019, the library network has decreased by 12 libraries.
Resolution Sandyktau district Governor's office dated 31 January and 16 June 2019 closed: Central children's library, Belgorod, Guards, Doroginskoe, Basil, Veselovskaya, vladimirovskaya, Kamensky, Michael, Menshikov, 'ninskaya ,Spasskaya rural libraries. Book collections of libraries were transferred to the state institution " Department of Education of Sandyktau district. The rest of the library's property was transferred to the balance of the GKKP "Balkashinsky RDC".
Rural library branches are located in rented premises in Houses of culture and 3 branch libraries in school buildings-Novoromanovskaya, Shirokovskaya, Leskhoznaya. The number of Model libraries is 2 libraries. Shirokovskaya, Sandyktau rural library. The Central children's library and the Guards s / b lost the status of model libraries, due to closure.
Book Fund: during the reporting period, the library network received 1517 copies of documents in the amount of 2197.4 thousand tenge.
In 2020, the book Fund is 126332ekz.
In 2020, the amount of funds allocated for subscriptions was 694.0 tenge.
Finance: 33838.7 thousand tenge was allocated from the local budget for the development of the library sector in 2019. Of these, the salary Fund amounted to 26165.4 thousand tenge. In 2020, 34212,2 thousand tenge was allocated , the salary Fund amounted to 29,853,4 thousand tenge.
20365.0 was allocated for the current renovation of the Central district library building in 2020 under the DKZ program.
Telephony in the library system is 100 percent, and computerization is 100 percent. There are 2 libraries connected to the Internet - the Central district library and the Sandyktau model library. To Otau TV connected 6 libraries: Priozerska, Shirokovskaya, Novonikolskoe, Sandyktau, Maksimovskaya and CRH. 2 libraries are connected to the Internet: the Central district library and the Sandyktau rural library.
Personnel structure: the number of employees is 25 people, staff units-20. 10 people work in rural branch libraries, 9-at 0.5 rates, and 1 librarian of the Sandyktau rural library at 0.75 rates. The district library employs 16 people, 7 creative people.
Mass work
In 2019, the district's libraries provided users with free and equal access to information in all types, provided services in response to their needs, formed an image of themselves in society, through the use of active forms of activity, and created a comfortable service environment. Using the library's potential, they introduced the villagers to reading by holding mass events of various directions. In 2019, 1412 events were held ,and the number of visits to them was 20,132 people. The number of readers 6322 people, visits for the year-80126, book output was 121679.
This year, due to the pandemic, library staff have been working online since April. For 6 months of 2020, 827 events were held, 536 events were held online, 9341 online users visited them, online quizzes, online presentations, exhibitions, virtual linguistic tournaments, game programs were held, as well as video clips, online readings of poems on various topics, challenges and online promotions were published. The number of readers since the beginning of 2020 is 3774, visits-31220, book distribution-44767.
Work of the Sandyktau Central Bank for 6 months of 2020.
Museum
Since December 1, 2018, the Department of culture and language development of the Sandyktau district has been operating a local history Museum
The stock collection consists of 500 Museum exhibits, and the Fund is being replenished.
The Museum hosted round tables, historical, thematic hours, and seminars. Schools in the district brought students on excursions, but in connection with the coronavirus pandemic, group visits are suspended, most of the events are translated into electronic format and published on the official page of the social fest "Facebook".
The Museum collects materials about our countrymen who made a contribution to the development of Kazakhstan, works on local history, as well as the study of neutral places.
Language development center
Work of the language development Center of Sandyktau district for 4 months of 2020.
On the basis of the decree of the mayor's office of Sandyktau district on March 2, 2020, within the framework of the program to expand the scope of the state language, integration into all spheres of society, to teach adults the state and English languages, the KSU "language development Center" of the Department of culture and language development of Sandyktau district was established.
The material and technical base of the center is equipped in accordance with the requirements of the time (multimedia and computer room), the educational and methodological base is fully provided.