Меню

Страницы

Статья

Health care

In the village of Bakanas there is a typical central district hospital with 110 beds built in 1986 with a polyclinic for 300 visits. The total area of the CRH building is 6195 sq.m.
GKP on the PCV "Balkhash CRH" is located in a three-storey building. Major repairs were carried out in 2020 (exterior cladding). There are two separate entrances for children and adults.
The planned capacity is 300 visits per shift. The polyclinic works from 8 o'clock to 20 o'clock on a rolling schedule. The reception of doctors is organized in 24 specialties, there is a day hospital, as well as all medical and diagnostic rooms.
The 110-bed hospital is located in a three-storey standard building built in 1986. Major repairs were carried out in 2020 (food hall, therapeutic department).
Therapeutic department – 30 beds
Children's department – 15 beds
Surgical department - 25 beds:
Maternity department – 15 beds:
Infectious diseases department – 15 beds
The total bed capacity is 172 beds.
There are 70 beds in the district to provide inpatient replacement care.
The hospital is equipped with modern medical equipment and equipment: ultrasound machine, digital mammography machine, digital fluorography machine, X-ray machine, modern equipment for physiotherapy.
There are offices: ultrasound, X-ray, endoscopic, physiotherapy, dental, otolaryngological, ophthalmological, surgical, endocrinological, psychiatric, narcological, obstetric-gynecological, ECG office, etc.
Digitalization of the hospital
The equipment of computers is 100%. The medical institutions of the district are connected to the Internet, but there are problems in the villages with Internet speed. All existing medical information systems of the Ministry of Health of the Republic of Kazakhstan have been implemented. Medical documentation is kept in the medical information system of the MIS "Zhetysu".
There is a PACS system with which specialists of various profiles have access to view the results of X-ray studies.

Дата публикации
12 сентября 2022
Дата обновления
12 сентября 2022
Тип
Information

Сейчас читают

20 августа 2024
Residents of Almaty region were provided with more than 1,200 PSC services at home
Information
30 марта 2024
About the opening of the Voroshilov reservoir dam
Information
04 марта 2024
An important message from the operational headquarters of the Almaty region!

Социальные медиа

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты