
By the beginning of the 2020-2021 school year, 3399 children are studying in educational institutions. 393 students were admitted to the 1st grade. 1601 students study in 4 distance learning schools, 338 distance learning students are provided with personal computers.
Taking into account the needs of low-income families, measures are being taken to provide 681 students from the remaining 400 distance learning families with the necessary laptops and Internet cards.
Nowadays, 450 routers worth 7415.0 thousand tenge, 13.0 million tenge from the local budget, 81 computers and 110 laptops have been purchased and distributed to low-income families in remote schools.
It is planned to purchase 600 computers from the republican and regional budgets (to be purchased in November).
8 projects worth 22 million 772 thousand tenge were implemented within the program "Tulek KZ", including technology room at Saralzhyn secondary school for 467.0 thousand tenge, The Bekmukhambetovs family bought the car “UAZ”to the school-gymnasium after Sh. Bekmukhambetovafor 6 million tenge, director of "Anvar" Salfikov T.M 16 million tengeHe took part in the construction of the building of the musical school, equipping it with modern classrooms.
48 million 623 thousand tenge. 46.5 million tenge was disbursed for the kindergarten building of Karaoi kindergarten and within the framework of "Auyl el besigi". The old building of the school-gymnasium named after Bekmukhambetova was overhauled with 51 million 173 thousand tenge, Kurman secondary school and 41 million 991 thousand tenge with Sapakkol secondary school.
There is a shortage of 11 specialists (3 teachers of mathematics, 1 primary school, 1 geography, 1 teacher of Russian language and literature, 2 teachers of chemistry, 3 teachers of computer science) in schools of the district. Due to the lack of specialists, there are 3 teachers of retirement age (2 mathematics, 1 chemistry).
In the new academic year, 3 specialists were hired on the recommendation of higher education institutions, and 19 self-employed specialists were recruited and employed in 10 schools of the district, including 15 specialists in rural schools.
There are 565 children in preschool organizations - on duty groups. There are 285 children in the queue for kindergarten. The kindergarten, built by an individual entrepreneur in the village of Oiyl, is expected to be commissioned in January 2021. There is no queue for children aged 3-6 in preschool organizations. The coverage of children aged 1-3 years is 84.5% (due to the pandemic).
There are 16 small schools.
68.0% are equipped with modern offices (59% of the region).
All 23 schools (100%) are connected to the Internet, of which 9 schools are currently connected to the network of high-speed fiber-optic communication systems, 14 schools are connected to the Internet via satellite Internet at a speed of 4 Mbps.
Schools are fully equipped with video cameras. 6.9 million tenge was allocated from the budget and turnstiles were installed in 15 schools.
All schools have indoor toilets.
Problem: The building of Ekpetal secondary school needs to be built in case of emergency. 64 students are taught in three buildings. Design and estimate documentation is not developed. Presented to the regional department of education.