Housing and Communal Services

Implementation of construction and installation works" construction of a call point in Shalkar, Aktobe region "from the program" budget program for the development of Public Utilities " 124870.0 thousand tenge was allocated from the regional budget, 124869.7 thousand tenge was disbursed, 0.2 thousand tenge remained. Work on the facility is underway with a variable period of 2024.
Under the program" design, development and (or) arrangement of engineering and communication infrastructure " 1,399,558.9 thousand tenge was allocated, 1,375,345. 7 thousand tenge was disbursed, 24,213. 2 thousand tenge remained undeveloped. Including:
1) construction and installation work of the object" construction of water supply networks in the development zone on Saztobe Street in Shalkar " was carried out and accepted.
446415.0 thousand tenge was allocated from the National Fund, 446414.9 thousand tenge was disbursed, 0.1 thousand tenge was saved.
100,000.0 thousand tenge was allocated from the Republican budget and fully disbursed.
60713.0 thousand tenge was allocated from the regional budget, 60712.8 thousand tenge was disbursed, 0.2 thousand tenge was saved.
2) construction and installation work of the object" construction of an overhead power line of 0.4 KV in the development zone on Kokzhide street, Shalkar city " was carried out and accepted.
90906.0 thousand tenge was allocated from the Republican budget, 90905.0 thousand tenge was disbursed, and 1.0 thousand tenge was saved.
10101.0 thousand tenge was allocated from the regional budget, 10100.8 thousand tenge was disbursed, 0.2 thousand tenge was saved.
3) construction and installation work of the object" construction of overhead lines-0.4 KV in the development zone on Saztobe street in Shalkar " due to delays in the approved schedule of work, the contractor was transferred to the economic Court. Construction work is underway.
454295.0 thousand tenge was allocated from the Republican budget, 431579.6 thousand tenge was disbursed, and 22716.4 thousand tenge remained undeveloped.
50,478.0 thousand tenge was allocated from the regional budget, 48,981. 9 thousand tenge was disbursed, and 1,496 thousand tenge remained undeveloped.
4) construction and installation work of the object" construction of gas supply networks in the village of ESET batyr of Aishuak rural district of Shalkar district " was carried out and received.
91724.0 thousand tenge was allocated from the regional budget, 91723.9 thousand tenge was disbursed, 0.1 thousand tenge was saved. 1000.0 thousand tenge was allocated from the district budget and fully disbursed.
5) construction and installation work of the object" construction of an electric lighting network on the highway of Baisalbayev street (from the intersection of M. Auezov Street to the Shalkar-Irgiz highway) in Shalkar city " was carried out and accepted.
11875.2 thousand tenge was allocated from the district budget and fully disbursed.
6) construction and installation work of the object" construction of an electric lighting network on the highway of Biekenov street (from Kaidaul Street to the Southern Railway Bridge) in Shalkar " was carried out and accepted.
17992.6 thousand tenge was allocated from the district budget and fully disbursed.
7) construction and installation work of the object" construction of an electric lighting network for the highway Zhalmaganbetov Street (to the Southern Ring Road) in Shalkar " was carried out and accepted.
14695.0 thousand tenge was allocated from the district budget and fully disbursed.
8) construction and installation work of the facility" construction of an electric lighting network on the Shalkar-Irgiz highway in Shalkar city " was carried out and accepted.
25145.8 thousand tenge was allocated and fully disbursed from the district budget.
9) construction and installation work of the facility" construction of an electric lighting network on the Shalkar-Aktobe highway in Shalkar city " is suspended in connection with the construction of the Shalkar-Kandyagash Highway.
12697.5 thousand tenge was allocated from the district budget and fully disbursed.
10) in addition, 5 projects on night lighting of the street of Shalkar were prepared and conclusions were obtained from the application. 5907.7 thousand tenge was allocated from the district budget and fully disbursed.
Under the program" development of water supply and sanitation systems in rural settlements", 16301.7 thousand tenge was allocated and fully disbursed from the district budget. Among them: a project for the reconstruction of water networks in the village of Kaulzhyr, Shalkar district, was prepared, and a positive opinion was obtained from the expert examination. In addition, projects for the reconstruction of the water supply network of Karashokat, Shokysu villages and the sewerage network of Kaulzhir village with the Akaba network are being prepared for 2023-2024.

Дата публикации
18 ноября 2020
Дата обновления
01 января 2023
Тип
Directions

Сейчас читают

Information
23 февраля 2026
О проведении 15 марта 2026 года республиканского референдума
19 февраля 2026
Об утверждении Календарного плана основных мероприятий по подготовке и проведению республиканского референдума, назначенного на 15 марта 2026 года
Information
12 ноября 2025
Этика и терминология в отношении лиц с инвалидностью. Современное понимание инвалидности

Социальные медиа

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты