State institution " Department of construction, architecture and urban development of Aktobe region"

On the implementation of the state housing construction Program "Nurly Zher»
The main indicator that characterizes the construction industry is the volume of construction work performed.
According to the results of the reporting period January-tamyz 2020, the volume of construction work performed in the Aktobe region corresponds to 101.0 billion tenge or 101.2%, the commissioning of housing from all sources of financing is 480.9 thousand m2 (3186 apartments) or 106.6% by the corresponding period of 2019.
The plan for the volume of completed construction works for 2020 is 200.5 billion tenge or 102.5%.
According to the Memorandum signed between the Prime Minister of the Republic of Kazakhstan and the akim of Aktobe region, the plan for housing commissioning from all sources of financing is 940.0 thousand m2, but until November 1 this year, this indicator will be changed to 1024.8 thousand m2 (7200 apartments).
It is planned to achieve this indicator in the following areas:
- 49.0 thousand m2 of credit housing under the ZHSSBK or 861 apartments (these are multi-storey residential buildings in the Nur-Aktobe railway area for a total of 8.7 billion tenge, including 7.0 billion tenge from the MB AND 1.7 billion tenge from the RB);
- 10.6 thousand m2 of rental housing without the right to buy or 159 apartments(this is for large families apartments worth 3.5 billion tenge from the Republic of Belarus);
- 191.3 thousand m2 of commercial housing at the expense of non-state enterprises in Aktobe 1829 or apartments (this apartment building in W/array "Batis" such developers as: LLP "SK Aktobe" PC "Nectar", LLP "Savedsettings W", LLP "Investkompleks", LLP "Edelweiss", LLP "K7 Groups" HBC "Safina", HBC "Kerametal", LLP "SMP Group", etc.);
- 773,9 thousand m2 of individual housing or 4351 houses at the expense of means of the population in Aktobe and region.
For 2020, the Nurly Zher program provides 9096.3 million tenge for the construction of engineering and communication infrastructure, including 7892.3 million tenge from the national budget and 1325.3 million tenge from the local budget. It is planned to use these funds to build 518 km of engineering networks (electricity, gas, water and sewer lines).
During the reporting period January-August, 4165.3 million tenge was disbursed from the allocated funds, which is 100%.
8732.1 million tenge was allocated for the construction of credit residential buildings, and the planned 4079.6 million tenge was spent in January-August.
3503.9 million tenge from the Republic of Belarus and 635.7 million tenge from the Republic of Kazakhstan WERE allocated for the construction of rental residential buildings without the right to buy. According to the results of the reporting period, 1608.3 million tenge was disbursed.
Also, this year, at the expense of the Republic of Belarus, 1.1 billion tenge was allocated for the purchase of ready-made 122 apartments for large families. To date, 53 apartments have been purchased and 306.4 million tenge has been disbursed.

Дата публикации
04 декабря 2020
Дата обновления
04 декабря 2020
Тип
Information

Сейчас читают

Information
02 октября 2023
About the general plan of the city of Aktobe, Aktobe region (including the main provisions)
Information
16 мая 2022
Decision of the regional maslikhat on approval of the improvement rules
Information
16 мая 2022
Appendix to the draft decision of the regional Maslikhat № 349 dated December 11, 2015

Социальные медиа

Меню подвал

State of the Nation Address of the President of Kazakhstan
Website of the President of Kazakhstan
Website of the Prime Minister of Kazakhstan
Digital transformation concept
Life situations
National symbols
Terms and explanations
Central communications service under the President of the RK
Screen Reader
Құпиялылық саясаты