Within the framework of the housing construction program” Nurly Zher", 4 low-rise rental and communal residential buildings were built.after the commissioning of this object, 64 families registered as needing housing from the state housing Fund were provided with housing.
1. by educational objects
Gasification of the secondary school named after I. Kurmanov is being carried out. Egindybulak. Construction of a kindergarten “Kausar"has been completed in the village of egindybulak.Developed design and estimate documentation for gasification of residential buildings in C. Egindybulak and held a competition for construction work. Also, work is underway on gasification of the buildings of the secondary school named after I. Balabanova, kindergarten “Bolashak” in the name of I. Balabanova and Megalinsky primary school. Design and estimate documentation for gasification of the building of Kalinovskaya secondary school in begalinsky rural district
2. gasification of the building “House of youth” in the village of egindybulak has been completed for cultural objects. The rural club named after I. biltabanov has developed design and estimate documentation for gasification and is undergoing a comprehensive non-departmental examination.
3. for administrative buildings, design and estimate documentation for gasification of buildings in C. Egindybulak and Kalinovka village. Also during the completion of gasification of the administrative building of the village named after I. Biltabanov.
This year, major repairs were carried out to water supply networks and facilities owned by KGP" Kobda su " in the village of Kobda. Construction and installation works were performed by "Sermar"LLP. In total, this project includes the reconstruction of the 2107m water supply system, replacement of electrical networks with insulated wire, replacement of water valves with in-village wells, installation of a hot water boiler and installation of hot water pumps of the 2nd KGP lift»Kobda su", fencing device.
In 2020, construction and installation works were carried out" on the object "reconstruction of sewer networks in the village of Kobda". Construction and installation works were carried out by "OTES Aktobe"LLP. In total, 10,847 meters of sewer networks were built under this working project. Two new sewage pumping stations were also built and one sewage station was reconstructed. During this project, more than 200 residential buildings, with the exception of social and business facilities in Kobda village, were able to connect to the centralized sewer system
The amount of the contract for this object was 217,798 thousand tenge.