The gross output of the agricultural sector for 10 months of 2020 amounted to 25 billion 827.4 million tenge, or 107.8% more than in the same period of 2019. Including: crop production – 14 billion 869.0 million tenge (IFO-110.7%), animal husbandry – 10 billion 853.8 million tenge (IFO-104.2%).
compared to the same period last year, meat was exceeded by 108.0%, milk by 101.6%, eggs by 101.5%.
Compared to last year, the number of cattle in the district increased by 102.9%, sheep and goats by 107.0%, horses by 105.0%, pigs by 101.7%, poultry by 105.2%.
The volume of industrial production in January-October 2020 amounted to 2 billion 129.5 million tenge, or 98.4% compared to the corresponding period last year. Including:
- mining industry - 591.1 million tenge (95.6%)
- manufacturing industry-1216.6 million tenge (97.6%);
- electricity and gas - 276.6 million tenge (114.8%);
- water supply; Sewerage system, control over waste collection and distribution - 45,2 million tenge (100,9%).
The reason for the decline in production in the mining industry was a decrease in production volumes.» TAS Arman Aktobe " and LLP» TAS Kargaly " in connection with the pandemic.
The reason for the decline in production in the processing industry is the decrease in the production of flour at processing enterprises (Stepnoy LLP) and sunflower oil (kendala TAS agro-industrial complex).
The volume of investments in fixed assets amounted to 9 billion 878.2 million tenge, which is 161.2% more than in the corresponding period last year.
The volume of construction works is 7 billion 473.1 million tenge, or 128.5% more than in the same period last year.
For housing commissioning in January-October 2020, 9865 sq/m of housing was commissioned, which is 107.2% more than in the same period last year.
Retail trade volume-1178.5 million tenge, physical volume index-105.3%.
In the field of entrepreneurship, the number of registered small and medium-sized businesses is 1,167, which is 104.7% more than in the same period last year. Of these, there are 1082 active entities, or 92.7% of the number of registered entities.
679 new jobs were created in the field of employment and social protection. Compared to the previous year – 104,6%.
446.2 million tenge was forecasted to the district budget, 652.8 million tenge was actually received, or the forecast was fulfilled by 146.0%.
Execution of budget expenditures - 5 billion 725.0 million tenge, with the forecast-5 billion 792.2 million tenge, or execution amounted to 98.8%.