Dear residents of the city!
In accordance with the Decree of the President of the Republic of Kazakhstan" on holding reporting meetings with the population of heads of Central Executive bodies", akims of all levels report to the residents once a year.
In January 2019, 5 reporting meetings were held with the city's population.
Work is underway to implement the criticisms and suggestions made at the reporting meetings.
The work of the city akimat in 2019 is aimed at further ensuring the sustainable socio-economic development of the city, which has a positive dynamics.
As of January 01, 2020, the population was 33.4 thousand people. the migration balance is 226 people.
The state budget received $ 2 billion 436 million tenge, the forecast was fulfilled by 103%, including the local budget-1 billion 101 million (102%).
The expenditure part of the budget is executed in the amount of 4bn.652 million tenge or 99.4% undeveloped.
In 2019, the volume of industrial production amounted to 23.1 billion tenge, the physical volume index was 104.6%. In the structure of industry, the main share is provided by the manufacturing industry, which occupies 73.9% of the total volume of industry.
The implementation of the "anchor "project of" BapyMining "LLP"Mining and processing of iron ore with the production of limit pig iron using innovative technology" continues. Since the beginning of the project, 12.0 billion dollars of tengeinvestments have been attracted, and 9.0 thousand tons of pig iron have been produced in 2019.
In 2019," Akaltunproducts " LLP with a capacity of 2640.0 tons of slaked lime per year was introduced, 30 jobs were created.
In the process of developing a strategy for the production of competitive products, "Elektromarganets" LLP has started production of steel packaged casting for the domestic market of Kazakhstan, with a design capacity of 50.0 tons of finished casting per month, with the creation of 40 jobs;
In 2019, the volume of investments in the main capital amounted to 6.2 billion tenge, 79, 1% are off-budget investments (4.9 billion tenge).
Small and medium-sized businesses are an important part of the city's economy.
As of January 1, 2020, the number of operating small and medium-sized businesses is 1500 units,the receipt of payments to the budget from small and medium-sized businesses amounted to 1.4 billion tenge. tenge.
Work is underway to cover state support under the Unified business support and development program " business Roadmap 2020 "in the part" Subsidizing the interest rate on loans from second-tier banks.
For 2019, under this program, 3 projects were covered by state support for business: 2 projects for subsidizing in the amount of 2.5 billion tenge(Cascade Karatalskaya HPP LLP, IP" Isabekova A. T.") and 1 project for guaranteeing in the amount of 10.0 million tenge(IP "Isabekova S. T.").
3 state grants were issued for youth in the amount of 6.0 million tenge (LLP "Tourism of Semirechye" 4.0 million tenge, IP "Abdikarimnazym" - 2.0 million tenge. tenge).
The program "Productive employment and mass entrepreneurship"is being implemented.
In 2019 12 loans in the amount of 70.0 million tenge were issued for business entities of the city
One of the main directions in the development of the city's economy is the tourism industry.
There are 13 tourism infrastructure facilities in the city, including: 7 hotels, 2 hotels, a health resort "Tekeli", a recreation center" Bastau", a Center for children and youth tourism and local history.
The volume of services provided by tourist organizations of the city in 2019 amounted to 161.3 million tenge, which is 0.6% more than in 2018.
The number of citizens served by domestic tourism organizations for 2019 is 5256 people, which is 4.8% more than in 2018.
It is also worth noting the objects of the hospitality sphere that have national diplomas, certificates of the tourism Department of Almaty region, regional and city certificates, such as hotel and bath complexes: "Switzerland"and" Slavyansky Dvor".
Solving problems related to the development of housing and communal services is an important element that determines the living conditions of the population.
Within the framework of the"development of regions "Program, projects on the "reconstruction of m-na thermal trunk networks" project have been completed»Metallurg " (486.0 million tenge, with a total length of 5.01 km.).
for the reconstruction of the Sewerage system(650,8 million tenge, with a total length of 29,17 km).
In 2019, 4 specialized vehicles were purchased at the expense of budget funds(the Total amount of 76.3 million tenge) (2 tractors with attachments, a garbage truck, a KAMAZ-sand spreader).
Work was carried out on the installation of 12 new garbage bays with the installation of 33 Euro containers(10.8 million tenge).
For the rest of citizens, there is a viewing platform "Tekeli Koktobe" (2.7 million tenge).
In 2020, it is planned to build 22 children's playgrounds.
Reconstruction of the water intake facility in the village of Rudnichny will be carried out.
Design and estimate documentation has been developed for the project "Major repair of sidewalks and arychny network on B. Momyshuly Kunayev street from the railway crossing to the exit from Tekeli"(the project Cost is 106.3 million tenge);
Developed design and estimate documentation for the objects "Construction of a gravity water pipeline with a diameter of 300 mm from the pumping station "Chazha" g. Tekeli " (PSA-5.5 million us dollars). tenge, SMR - 76.0 million tenge);
"Construction of engineering and communication networks to the city basin of Tekeli"(PSA-1.7 million tenge, SMR-23.5 million tenge);
"Reconstruction of intra-district heating networks of the Alatau and Dostyk metro stations in Tekeli" ($52.4 million). tenge).
In 2018, the construction of the 31.3 km long Taldykorgan-Tekeli gas pipeline was completed.
Gasification of the Dostyk metro station has been carried out in the city. Work was carried out on the installation of 5.2 km of low-pressure gas supply networks along 5 streets. Currently, there is no gas supply in the networks.
To date, there is an unacceptable situation regarding gasification in the city. In 2018 a private investor LLP started construction of the gas pipeline»As-TAS-invest". The work was carried out in violation of all building regulations and current legislation. Obligations on the part of As-TAS-invest LLP have not been fulfilled. All types of work have been stopped. The city police Department opened a criminal case in relation to "Astas-invest". However, due to the lack of evidence of the crime, the case was dismissed.
Under the transport infrastructure development program
In 2019, an average repair was carried out on four streets of the city (length of 3.8 km, Panfilov, Tolebayev, Zhalairi, Kerimbek streets). The share of highways in good and satisfactory condition has increased in relation to 2018 from 78.2% to 79.9%.
This year, it is planned to implement a project to overhaul 5 streets of the city (B. Momyshuly, Sadovaya, Stadionnaya, I. esenberlin, M. Mametov streets), with a total length of 5.7 km (300.0 million tenge was allocated).
Also, there are ready-made design and estimate documentation for the objects "Major repairs of al-Farabi, Dostyk, orakty Batyr, Zhansugurov, Ring of Tekeli" (SMR 765.2 million tenge) and "Average repairs of Seifulin, Tolstoy, Zhideli and lane from Tolstogokunaev street to Shevchenko street"(SMR 63.5 million tenge).
During the reporting year, the volume of passenger transportations increased to 10 million 922 passengers. the passenger turnover was 105.5%. More than $ 2.4 million tons of cargo were transported, and the cargo turnover was 85.2 million tons/km.
In 2019, the volume of construction work amounted to 1.9 billion tenge and was completed by 94.6 %. 5.3 thousand square meters of housing were commissioned.
As part of the "Nurlyzher"program, a new apartment rental residential building was built in the" Dostyk" microdistrict.
In 2020, it is planned to build an amphitheater in the Park of culture. The design and estimate documentation for the construction of two 40-apartment residential buildings has been developed.
Accessibility and quality of education are always among the main priorities for the development of the social sphere.
For the development of the education sector, us $ 1.7 billion has been allocated.tenge.
There are 437 teachers working in the city's schools
In the 2019-2020 academic year, 17 young specialists were provided with housing-6 of them.
As part of the implementation of digitalization, all educational institutions of the city are connected to the Internet, the system of the electronic magazine "Kundelik.KZ".
The computer capacity is 6.9 students per computer.
At the end of the 2018-2019 academic year, the quality of students ' knowledge was 65.0%. From year to year, there is a dynamic growth in the indicator of the unified national testing, the average score for the city last year was 93.3 points.In 2019, 64 out of 133 graduates received grants,13 of them to foreign Universities.
Hot meals covered 4,385 students, which is 98.5% of the total number of students.
If in 2019, free hot meals were covered by -710 students from low-income families, in 2020 -972. in the summer, health and recreation covered 160 children from the universal education Fund in the amount of 3.8 million tenge.
Every year, teachers and students of the city's schools become winners of national and regional competitions and competitions.
In regional competition:
"The best organization of education-2019 in Almaty region" - I place, school №8-certificate in the amount of 34.0 million tengetenges;
"The best class teacher of the region" - I place, teacher of school № 6 Tuteev Medet;
"The best teacher of 2019 in Almaty region" - III place-physics teacher of school № 5 Muratbek Khizaykhan;
"Business leader of the preschool organization of the region" - I place, head of kindergarten no.4 Kalymbekova Zhamilya Turarova;
"The best teacher of physical culture of the region" - II place, teacher of school№4 Bolatkhankyzy Guldana;
In 2020, "Major repairs of secondary school No. 6 with a pre-school mini-center with seismic reinforcement" will be carried out (465.5 million tenge), two buses will be purchased for the children's tourism center and for transporting students.
Also, funds were allocated for the development of design and estimate documentation for the object "Mini-football field with artificial turf" for 6 schools and for the development of design and estimate documentation for the object "Major repairs of the building of secondary school No. 3".