Action plan
to resolve problematic issues
based on the results of meetings of the Akim of the city of Ridder with the population
for 2024
|
№ |
Question |
Decision period |
Responsible executor |
Execution |
|
1 |
Resolve the issue of clearing the road along Sovkhoznaya Street from snow. |
12.02.2024 |
Kurmetuly R. |
COMPLETED |
|
2 |
Consider the possibility of arranging a sidewalk to school No. 11 and to the kindergarten "Kuanysh" from the side of the store "Kazakhstan" and from the side of residential buildings of the 6th microdistrict. |
01.07.2024 |
Kurmetuly R. |
COMPLETED paving the pedestrian path to school No. 11 |
|
3 |
Inform the city's population about free sports sections and clubs. |
12.02.2024 |
Oshakbaev E.K. |
COMPLETED: Information about the work of sports sections is posted on the official accounts of the KGU "DYUSSH of Ridder", KGU "DYUSSHOR for winter sports", as well as on the accounts of the coaching and teaching staff of sports institutions in Ridder. Links: https://www.instagram.com/p/C4IXfjYLKQU/?igsh=MWNqa3J0YXZuanhmaQ== --https://www.instagram.com/p/CFEIkDSgMlM/?igsh=MWtsNGJkYXV4emI5Ng==https://www.instagram.com/s/aGlnaGxpZ2h0OjE4MDg2MzMwMDA1MzQ4ODUx? story_media_id=3129413082622505745_18302738473&igsh=cHFoN2p0cXhxZms1https://www.instagram.com/p/Ch1pcBnrFuT/?igsh=MWF6cWhrZnFtajVxdA== |
|
4 |
Install a “Speed Limit” sign near the intersection of Gogol and M. Auezov streets, and repair the traffic light. |
01.04.2024 |
Kurmetuly R. |
COMPLETED The traffic light was repaired, the issue of installing the “Speed Limit” sign in the area of the intersection of Gogolya and M. Auezov streets was considered in the summer |
|
5 |
Resolve the issue of regular waste removal from solid waste sites |
01.04.2024 |
|
COMPLETED: According to information from Firma ETALON, a container truck carries out daily removal of solid waste from the sites according to the schedule. Specialized equipment is used to remove oversized waste and removal is carried out as it accumulates. |
|
6 |
Improvement of the children's playground on Gertsena St. 6, 6/1 |
01.07.2024 |
Kurmetuly R. |
COMPLETED: |
|
7 |
Resolve the issue of lighting the football field on Semenova Street |
15.10.2024 |
Kurmetuly R. |
COMPLETED: |
|
8 |
Take measures to pave the area in front of the Ulba store, repair the steps and install railings. |
01.07.2024 |
Kurmetuly R. |
COMPLETED: |
|
9 |
Take measures to prevent avalanches from falling onto the road in the area of 71 km (Sinyushenskaya St.) in the village of Lesnoye. |
19.01.2024 |
Tarasov E.V. (subject to agreement) Alibekuly S. |
COMPLETED: 01/19/2024, together with the Department of Emergency Situations and employees of the State Institution "Kazselezashchita", a forced avalanche was carried out in the area of 71 km in the village of Lesnoye, after which the road was cleared of snow. |
|
10 |
Resolve the issue of providing free medications to lonely and bedridden citizens living in the 4th district. |
01.04.2024 |
Kitappaeva G.S. (subject to agreement) |
COMPLETED For individuals who are unable to obtain medications on their own, the staff of the medical clinic (district nurses) deliver them to their homes. |
|
11 |
Resolve the issue of cutting down trees near the houses of Dreyman, 12, 14 |
15.10.2024 |
Kurmetuly R. |
COMPLETED: Three old trees were cut down on ul. Dreiman, 12 |
|
12 |
Resolve the issue of filling the pedestrian path from the bus stop to the house at 12 Gesovskaya St. |
15.10.2024 |
Kurmetuly R. |
COMPLETED: |
|
13 |
Clearing roads of snow. |
20.03.2024 |
Kurmetuly R. |
CLARIFIED |
|
14 |
Take measures to organize waste removal from the village of Lesnoye |
01.05.2024 |
Kurmetuly R. |
CLARIFIED: employees of the subscriber department of TOO Firma Etalon went out twice to conclude contracts for waste removal, but, unfortunately, none of the residents agreed to conclude the contract |
|
15 |
Consider the possibility of repairing a children's playground in the village of Lesnoye |
01.07.2024 |
Kurmetuly R. |
Work on repairing the children's playground is included in the list of improvement works for 2025 |
|
16 |
Take measures to repair and re-stretch power lines in the village of Ulbastroy |
01.07.2024 |
Kurmetuly R. |
A visual inspection of the power transmission line has been carried out. Sections subject to repair have been identified. The work will be completed in 2025. |
|
17 |
Internet connection in the village of Poperechnoe |
20.11.2024 |
Kurmetuly R. |
The school has a satellite system "Starlink" installed to provide Internet. The process of registering a land plot for the construction of an antenna mast structure is underway. |
|
18 |
Organization of bus traffic Ridder-s.Poperechnoe |
01.06.2024 |
Kurmetuly R. |
COMPLETED: On November 8, 2024, the bus service was resumed. The bus operates on Tuesdays and Wednesdays. Carrier: KazAvtoline LLC. |
|
19 |
Delivery of gas in cylinders to the village of Poperechnoe |
01.07.2024 |
Kurmetuly R. |
CLARIFIED: Gas is purchased by the village residents themselves from IP Fyodorov. At present, it is not possible to organize delivery from the city to the village of Poperechnoye due to the high cost of delivery and the relatively low price of gas. |
|
20 |
Water supply of the village of Konovalovka |
01.07.224 |
Kurmetuly R. |
Centralized water supply is provided by the networks of TOO Kazzinc-Energo. The development of design and estimate documentation for the reconstruction of water supply networks in the village of Konovalovka has been included in the preliminary work plan for 2025. |
|
21 |
Bus number 27 movement |
01.06.2024 |
Kurmetuly R. |
COMPLETED: Since June 1, the traffic of bus No. 27 has been regulated, there are 2 buses on the line, no complaints |
|
22 |
Take measures to illuminate Tikhaya Street in the village of Leninogorsk forestry |
01.10.2024 |
Kurmetuly R. |
Installation of lighting on Tikhaya Street in the village of Leninogorsk forestry enterprise is included in the preliminary work plan for 2026. |
|
23 |
Take measures to repair the bridge across the Tikhaya River in the village of Leninogorsk forestry |
01.09.2024 |
Kurmetuly R. |
In 2025, a budget application will be submitted for the development of design and estimate documentation for the construction of a bridge across the Tikhaya River in the village of Leninogorsk forestry. |
|
24 |
Installation of street lighting in the village of Verkhnyaya Khariuzovka |
01.07.2024 |
Kurmetuly R. |
COMPLETED Installed 21 new supports and 26 joint ones, total number 47 lights |
|
25 |
Bridge repairs in the village of Livino. |
10.09.2024 |
Kurmetuly R. |
COMPLETED In 2024, one bridge inside the village will be repaired, the second bridge will be repaired in 2025 |
|
26 |
Repair of power lines on Shubinskaya street, 4-6 |
01.09.2024 |
Kurmetuly R. |
An application for power transmission line repair has been sent to VK REC. |
|
27 |
Installation of a fence for a children's playground in the village of Livino |
01.07.2024 |
Kurmetuly R. |
COMPLETED. 3 million tenge were allocated from the local budget for the installation of a fence for the children's playground. |