
Akim of region Gauez Nurmukhambetov held a final district meeting with the akims of the Aiyrtau, Yesil, Musirepov, Timiryazev, and Shal Akyn districts, as well as heads of territorial departments and regional offices.
Flood-prone settlements have been identified in these districts. Since last year, a series of measures have been implemented to minimize the risk of flooding.
✔️Shal Akyn District:
The shoreline at Lake Malyi Tarangul has been reinforced. In the town of Sergeyevka, the protective cutoff embankment at the emergency wastewater discharge pond has been raised.
✔️G. Musirepov District:
In the village of Takhtabrod, a 5-kilometer-long drainage canal has been deepened. The flood-prone villages of Novoishimskoye, Ruzayevka, Chistopolye, Birlik, and Takhtabrod have been fully supplied with inert materials.
✔️ Yesil District:
A 1-kilometer-long drainage channel has been cleared, and an earthen embankment has been reinforced in the village of Chirikovka. In the village of Nikolayevka, an additional 0.5-meter-diameter culvert has been installed on the intra-village road.
✔️ Aiyrtau District:
A protective embankment has been reinforced in the village of Gusakovka. Culverts have been installed in the villages of Agyntai Batyr and Imantau. A damaged 1-meter-diameter culvert has been repaired at kilometer 23 of the Novosvetlovka-Bereslavka highway.
✔️Timiryazevsky District:
Earth embankments have been erected and reinforced in the Aksut, Kurttai, and Dzerzhinsk rural districts.
In addition, 41 culverts on local roads have been replaced and 36 repaired. Inert materials and specialized equipment have been fully prepared.
The head of the region noted that there is little time left before the onset of the flood season, and therefore instructed district akims and responsible services to constantly monitor the situation and ensure full readiness for the upcoming period.