A large-scale update of statistics is underway in Pavlodar schools

A large-scale update of statistics is underway in Pavlodar schools

Akim of the region got infected with running complex repair work in city schools. Abylkair Skakov noted the commitment to tightening the right to accept objects based on the results of the work of contractors.

This year, three football fields appear on the site of a wasteland between schools No. 25 and 42: two small and one full-size, with a jogging track, a basketball court and a tennis court. In addition, a workout is being built - a playground, a recreation area, children's play areas.

During extracurricular time, you can engage in active recreation in all kinds of Usolsky microdistrict. The large-scale project provides for the presence of about 20 thousand people.

Another project to develop school sports reality is being implemented at school No. 19. Here, the dismantling of the old football field, the foundation of the base for the foundations for the fence are based. On the territory of the sports ground there are two new football fields, basketball and volleyball courts, an area for practicing NVP, a workout, a gym and a playground.

The high workload of the name in the secondary school of Bauyrzhan Momyshuly. With a design capacity of 1,000 students, about 2,000 children study here. The contractor must update the building from the roof to the utilities. Akim of the region allows acceptance of electrical signals and fire safety systems separately from finishing works.

- In order to ensure safety, it is necessary to take measures to prevent the so-called invisible work, such as electrical, plumbing, communications, - said the regional akim.

In school-gymnasium No. 9, an extension for 700 students is being built. According to the plan, a four-story building will be built here, which will house an elementary school block with its own school, assembly and sports halls, a choreography studio, music and fine arts classrooms. The head of the region will happen two buildings in the next architectural and educational complex.

- It is necessary to place reconstruction with construction during construction, so that it becomes a single ensemble, - Abylkair Skakov drew attention. - I think that the contractors are fully responsible for the repair work, as the facility is socially important.

At the end of the work, the regional akim visited the village of Zheleznodorozhnikov, where a new school for 210 students is being built. Previously, the training of children in the village was organized by passenger transportation. Work is planned for the start of the new academic year. Local children are developing in a new school, where workshops for processing fabrics, ceramics and metal, NVP classrooms, circles in robotics and cooking will open. Abylkair Skakov instructed to carry out the work in accordance with the accepted format.

 

Press service of the akim of Pavlodar region

Photo by Valery Bugaev