Construction of a secondary school named after S. Mukanov for 300 places and a secondary school named after Kazhymukan for 200 places has begun in Badam village of Ordabasy district. In addition, funds have been allocated for the construction of infrastructure systems that have become an urgent problem in the "Orda" microdistrict over the years, and large-scale work has begun.
Currently, the design and estimate documentation for the construction of a school for 600 children is being developed in the" Orda " microdistrict. A paramedic and obstetric station will also be built in the village of Karabastau.
In Badam village of Ordabasy district, in accordance with the tripartite agreement adopted last year within the framework of the "Program for the development of the agro-industrial complex for 2017-2020", there are 10 thousand hectares.
Two hectares of greenhouses have been put into operation, and the method of drip irrigation has been introduced on 85 hectares. And 11 feedlots were opened.
In addition, three small family farms have already started their work. In addition, last year, within the framework of the program" Auyl – El besigi", average repairs were carried out on 23 streets in the district, street lighting was carried out, and sidewalks were laid.The seifullin secondary school and the Diamur kindergarten were overhauled and put into operation. On the territory of badam there are 4 channels with a total length of 41 kilometers. Of these, 27 kilometers were subjected to mechanical cleaning.
Press service of the akim of Turkestan region