S/N |
Event content |
Time of execution |
Process of implementation |
Responsible |
|
Kyzylorda city |
||||
|
1. |
The issue of organizing a joint meeting with the population in order to clarify the contracting institution carrying out work on the reconstruction (modernization) of the multi-story residential building No. 24A of the Shugyla micro district |
October |
Based on the "Procedure for capital repair of the common property of the condominium object", approved by the order of the Minister of Industry and Infrastructure Development of RK from 29.04.2020 № 246, in 2022 a survey of residents of apartment building № 24A of Shugyla micro-district of Kyzylorda city was conducted, 70% of contracts were collected. For the reconstruction of this housing, design, and estimate documentation have been developed, and a positive conclusion of expertise has been received. Currently, a budget request has been submitted to the republican budget, and financing is expected. In 2024, in case of allocation of appropriate funds from the republican budget, the reconstruction of multi-story housing will be carried out by the selected institution. |
G.Yerkebay A. Rysbek T.Kulmaganbetov |
|
2. |
The issue of installing night lighting poles on st. Sh.Bakirov |
March 2024 |
For installation of night lighting poles on Sh. Bakirova Street, design and estimate documentation was developed and a budget request was submitted to the republican budget. After the allocation of necessary funds construction and installation works will be carried out. For reference: In the current year the design and estimate documentation for the installation of light poles on 52 streets of the city was developed and submitted a budget request to the national budget, the estimated cost of 1,372.0 million tenge. |
G.Yerkebay Zh.Faizullayev |
|
3. |
The issue of providing natural gas and drinking water to residential buildings in the Bayterek micro district |
March 2024 |
On the funds allocated from the city budget for the construction of natural gas and drinking water networks in the amount of 14 streets (2, 3, 8, 19, 31, 32, 33, 34, 35, 35, 37, 38, 40, 41, 43 streets) in the residential area of Baiterek-1 of Kyzylorda city 8.4 million tenge the design institution "Neftegazengineering" LLP has developed design and estimate documentation and received a positive conclusion of expertise. At present, a budget request for the allocation of necessary funds for construction works has been sent to the regional Department of Economy and Finance. After the allocation of appropriate funds, construction and installation works will be carried out in stages (total project cost - 427.5 million tenge). |
G.Yerkebay А.Anuar |
|
4. |
The issue of sanitary cleaning of the main streets of the Bayterek micro district |
October |
In the Baiterek microdistrict, sanitation works are carried out on a regular basis by the relevant institutions. |
G.Yerkebay T.Kulmaganbetov |
|
5. |
Consider installing night lighting poles on the street (2nd entrance), where the newly built school is located in the Bayterek micro district |
March 2024 |
For the installation of night lighting poles on the street (2nd entrance), where the newly built school in Baiterek microdistrict is located, design and estimate documentation has been developed and a budget request has been submitted to the republican budget. After the allocation of necessary funds construction and installation works will be carried out. For reference: This year design and estimate documentation for the installation of light poles on 52 streets of the city was developed, budget application was submitted to the national budget, estimated cost of 1,372.0 million tenge. |
G.Yerkebay Zh.Faizullayev |
|
6. |
Development of design and estimate documentation on the construction of a road bridge across the Bayterek-4 micro district |
December |
For the development of design and estimate documentation for the construction of an automobile bridge to the Baiterek-4 micro-district in the current year from the city budget allocated 2.0 million tenges (necessary funds for the development of the project 15.0 million tenges), currently developing design and estimate documentation. By the end of the year, it is planned to develop the design and estimate documentation and implement the project in 2024. |
G.Yerkebay D.Tursynbayev Zh.Faizullayev G.Baimakhanova |
|
7. |
Together with the competent authorities in the form of entrepreneurship "Askhana", located on the 1st floor of a multi-story residential building No. 11 on Bekturganov Street, to create a special commission to verify compliance with legal requirements and take appropriate measures |
Till October 10 |
On October 6, 2023, by Akim's order #171, a special working group was created to check compliance with the requirements of the legislation on the object of entrepreneurship "24 Canteen", located on Bekturganov Street #11 of a multi-story residential building, on the 1 floor. At present, the study is being conducted by specialists of the relevant industry. |
D.Islamov D.Tursynbayev G.Yerkebay B.Baimakhanov E.Uzakbayev (by agreement) F. Kozhabergenov (by agreement) Zh.Tuimenov (by agreement) G. Kainazarov D.Syrlybayev A. Rysbek Act.E.Bakbergenuly |
|
8. |
The issue of ensuring the readiness of the multi-story residential building No. 11 on Bekturganov Street for the upcoming heating season |
October |
To ensure the readiness of multi-storey residential building No. 11 for the upcoming heating season on Bekturganov Street together with the management body of the condominium object "Rauan", the relevant works were carried out and fully connected to the heating network. |
G.Yerkebay A.Rysbek |
|
9. |
The issue of installing night lighting poles on Tauke Khan Street |
March 2024 |
For the installation of night lighting poles on Tauke Khan St. design and estimate documentation have been developed and a budget request has been submitted to the republican budget. After the allocation of necessary funds construction and installation works will be carried out. For reference: In the current year the design and estimate documentation for the installation of light poles on 52 streets of the city was developed, a budget request was submitted to the national budget, the estimated cost of 1,372.0 million tenge. |
G.Yerkebay Zh.Faizullayev |
|
10. |
Development of design and estimate documentation on the construction of a sidewalk in Rustembekov Lane |
December |
For the development of design and estimate documentation for the construction of sidewalks on 33 streets of the city, the city budget allocated 20.0 million tenge (this list includes Rustembekova Lane). By the end of the year, it is planned to develop design and estimate documentation and implement it in 2024. |
G.Yerkebay Zh.Faizullayev |
|
Tasbuget village |
||||
|
11. |
The issue of the construction of a sidewalk along the streets of A. Orazbayev and O. Seitenbekov |
November |
In September this year announced a public procurement competition for the construction of sidewalks on 6 streets (including A. Orazbayev and O. Seitpenbekova streets), where social facilities (school, kindergarten) are located in the village of Tasboget. After determining the winner contractor organization will be carried out (the cost of the project is 127 million tenge, and the results of the tender will be determined at the end of October). |
G.Yerkebay D.Tursynbayev G.Baymakhanova S.Syzdykov |
|
12. |
To consider the issue of installing bus stops in the Tasbuget settlement |
October |
Design and estimate documentation is being developed for the capital repair of A. Kunanbaev Street in the settlement. Within the framework of this project, it is envisaged to install 7 stops. Design and estimate documentation will be fully developed in November this year and submitted to the regional budget request (to date, a total of 18 stops have been installed in Tasboget settlement). |
G.Yerkebay D.Tursynbayev Zh.Faizullaev G.Baymakhanova S.Syzdykov |
|
13. |
The issue of carrying out the average repair of the road along M. Shokaya Street |
November |
The design and estimate documentation for the average repair of roads on 6 streets of Tasboget settlement (M. Shokai, Sh. Esenov, E. Bozgulov, S. Maikanova, Rakhmet Zhyrau, A. Kunanbaev streets) has been developed, in June of the current year a budget request to the regional budget has been submitted. After the allocation of funds, the works will be continued (the volume of necessary funds - 370.0 million tenge). |
G.Yerkebay S.Syzdykov Zh.Faizullaev |
|
Belkul village |
||||
|
14. |
Consideration of the issue of acquiring state ownership of the "bow square" located in the locality of Birkazan, in accordance with the law |
November |
Legalization of the land plot on the issue of state ownership of the land plot in Birkazan settlement is being carried out. These works will be completed in December this year. |
D.Tursynbayev Zh.Sadu act.K.Zhusipov D.Syrlybayev |
|
15. |
The problem of installing an artificial uneven barrier near secondary school №189 |
November |
From the local budget for the installation of an artificial uneven barrier in front of school #189 and on Ortalyk Street, 921 thousand tenge has been allocated and public procurement is underway. This work will be completed in December. |
G.Yerkebay Zh.Sadu |
|
Kosshynyrau Rural District |
||||
|
16. |
The issue of replacing public transport to the settlement of Abai with large-capacity buses |
December |
In additional leasing from the regional budget in 2023 considered 1 billion 612 million tenge for the purchase of 150 buses. To date, the supplier LLP "QazTehna" in August, and September of this year delivered 46 buses and at the moment the relevant documents are being formalized. From November 1 of the current year public transport to the Abay settlement of Kosshynyrau rural district will be replaced by large capacity buses. |
D.Islamov Zh.Faizullaev M.Zhusip S.Abdykadyrov |
|
17. |
The issue of installing a transformer in the village of Dosan (Term-2 weeks) |
October 2, 2023 |
By the end of October, an auxiliary power plant (1 piece) will be installed in Dosan village, Kosshynyrau rural district. At present, work is underway to establish the appropriate location. |
G.Yerkebay Zh.Faizullaev E.Kalenov (by agreement) S.Abdykadyrov |
|
Karauyltobe Rural District |
||||
|
18. |
The issue of launching the conducted electric networks to the newly populated territory by the contracting organization "Elcom" LLP |
December |
In 2022, within the framework of the program "Nurly Zher", in order to provide electricity to the newly settled territory of the rural district (8 power stations and 12.8 km of electrical networks and 215 electric poles) at the expense of the National Fund was allocated 311 million tenges. This year, 34.6 million tenge was allocated from the regional budget to complete this project, at the moment the work is fully completed. Currently, commissioning works are underway. |
G.Yerkebay A.Anuar E.Kalenov (by agreement) E.Akhetov |
|
19. |
The issue of replacing public transport on route No. 27 with high-capacity buses |
December |
In additional leasing from the regional budget in 2023 for the purchase of 150 buses considered 1 billion. 612 million tenge. To date, the supplier LLP "QazTehna" in August and September of this year delivered 46 buses, and the relevant documents are being processed. 46 buses, at the moment the relevant documents are being formalized. From November 1 of the current year public transport of large capacity will be connected to the route №27 in rural district Karauyltobe. |
D.Islamov Zh.Faizullaev M.Zhusip E.Akhetov |
|
Kyzylzharma Rural District |
||||
|
20. |
The issue of sidewalk construction and street lighting st. No. 17 |
November |
Design and estimate documentation was developed and a budget request was submitted to the regional budget for the construction of sidewalks and lighting of street #17 in the rural district of Kyzylzharma. After allocation of the necessary amount of funds, construction works will be carried out (project cost: total 115.0 million tenge for construction of sidewalks on 5 streets, 291.5 million tenge for lighting of 22 streets). |
G.Yerkebay Sh.Abdirakhmanov |
|
21. |
The issue of the average repair of the road along Abaya Street |
November |
Within the framework of the program "Auyl - El besigi" on Abay Street in a rural district allocated 64.4 million tenge, the average repair of roads (asphalt) is underway. These works will be completed by the end of October this year (Contractor - Aknur Auto LLP). |
G.Yerkebay Sh.Abdirakhmanov |
|
Kyzylozek Rural District |
||||
|
22. |
The problem of strengthening the Internet connection at the Karaozek station |
December |
In order to strengthen the connection of the Internet network at Karaozek station, Kazakhtelecom JSC is considering the possibilities of fiber-optic communication network technology. |
G.Yerkebay S.Abdizhappar S.Dukenbaev (by agreement) |
|
23. |
The issue of work on the renewal of the lawn covering of the children's playground at the Karaozek station |
December |
A budget request will be submitted to the city budget by the end of October for the renovation of the lawn covering of the children's playground (artificial turf) at Karaozek station. After the allocation of appropriate funds, the work will be carried out. |
G.Yerkebay D.Tursynbayev Zh.Faizullaev G.Baymakhanova S.Abdizhappar |
|
24. |
Consider the possibility of installing night light poles in the area of school No. 128 and up to the intersection with the entrance to the Karaozek post |
December |
In November of this year, night lighting poles will be installed in the area of School #128 on the driveway up to the intersection with the entrance to Karaozek Station. |
G.Yerkebay S.Abdizhappar |
|
Talsuat Rural District |
||||
|
25. |
The issue of the construction of a sidewalk from A. Kunanbayev Street to three social service facilities |
December |
A positive conclusion of expertise on the construction of a sidewalk from A. Kunanbaev Street to social facilities in the Talsuat rural district was received. The project will be implemented in 2024 (the project provides joint work on pedestrian paths and lighting, the total cost of the project - 78.8 million tenge). |
G.Yerkebay D.Tursynbayev Zh.Faizullaev G.Baymakhanova A.Zhylkybay |
|
Akzharma Rural District |
||||
|
26. |
The issue of carrying out work to prepare for the upcoming winter period with a full survey of drinking water systems in the rural district |
October |
At present, by the end of October of the current year will be carried out a complete reconstruction of shaped parts of the observation well in the number of 3 pieces on the drinking water system of the settlement Baimurat batyr. |
G.Yerkebay act. N.Shamuratov (by agreement) S.Abdreev |
|
27. |
The issue of carrying out work on the development of design and estimate documentation for the purpose of gas supply to the population of the rural district |
December |
37.7 million tenge was allocated from the city budget for the preparation of design and estimate documentation for gas supply to the rural district of Akzharma. On these funds "Grand" Structure Engineering" LLP, which became the winner in accordance with the law on public procurement, developed design and estimate documentation and received a positive conclusion of expertise. |
G.Yerkebay S.Abdreev |
|
28. |
The issue of carrying out work on the upcoming launch of newly installed electric networks in the village of Baymurat Batyr |
October |
Newly constructed electric networks in Baimurat Batyr village of Akzharma rural district were put into operation (letter of Tasboget district electric unit No. 305 dated 13.10.2023). |
G.Yerkebay A.Anuar E.Kalenov (by agreement) С.Әбдіреев |
|
29. |
To consider the issue of strengthening the Internet connection of the rural district |
December |
In order to strengthen the connection of the Internet network in some areas of the rural district, special letters were sent to the Interregional Communications Inspectorate for Shymkent, Zhambyl, Turkestan, and Kyzylorda regions of RGU "Telecommunications Committee of the Ministry of Digital Development, Innovation and Aerospace Industry of the Republic of Kazakhstan", telecom operators "TELE 2", "Activ". At present, responses from industry specialists are expected. |
G.Yerkebay S.Abdreev S.Dukenbaev (by agreement) |
|
Aksuat Rural District |
||||
|
30. |
The issue of carrying out repair work on the streets of public transport in a rural district |
March 2024 |
In the rural district, it is planned to reconstruct P. Tlepbaev, A. Tandyraev, B. Zhusupbekov, and Kanal-2 streets with public transportation and start construction works in August 2023 for 1 240.0 million tenge allocated 124 million tenge from the regional budget, currently a public procurement tender is being held (result at the end of October). The remaining funds will be allocated from the republican budget in 2024. |
G.Yerkebay D.Tursynbayev A.Anuar G.Baymakhanova N.Bakhytov |
|
31. |
The issue of correcting the pillars of night lighting on B. Zhonbayev Street |
September |
In September of the current year, the institution "Inno Tech" carried out works on tidying up the night lighting poles on B. Zhonbaev Street. |
G.Yerkebay N.Bakhytov |
|
32. |
Problem of regulating traffic signs on the street where school-lyceum No. 268 is located |
October |
On the issue of regulation of road signs on B. Zhonbaeva Street, adjacent to the school lyceum No. 268 of the rural district of Aksuat, the city police department conducted a study of road signs located in this area to be installed. As a result, the relevant works will be carried out until the end of October on the basis of the prescription № 401, sent through the city police department to the city department of housing and communal services, passenger transport and highways. |
G.Yerkebay Zh.Faizullaev А.Kasanov (by agreement) N.Bakhytov |