Information
for modular boiler rooms
Thousand tenge
|
№ |
Name |
The Cost Of
|
The Conclusion Of |
The Financing |
Implementation period |
Note |
|
1 |
"construction of a gas-fired modular boiler house for secondary school No. 3 in Fedorovka village" (0.7 MW) |
51 668.1 |
№ 12-0089 / 19 from 08.05.2019 |
dcz |
May-August |
Procurement was conducted by way of competition with the use of special order 4 times |
|
2 |
"Construction of a modular boiler the gas fuel to the boiler-house TSRB village fedorivka" (3,6 MW) |
101 237 |
№ 12-0088 / 19 from 08.05.2019 |
dcz |
May-August |
|
|
3 |
"construction of a gas-fired modular boiler house for the Central boiler house of Fedorovka village" (4 MW) |
89 163.4 |
№ 12-0055 / 19 of 08.04.2019 |
DKZ |
May-August |
|
|
|
TOTAL DKZ |
242 068,5 |
|
|
|
|
|
4 |
"construction of a modular gas-fueled boiler house for secondary school No. 1 in the village of Fedorovka" (6 MW) |
105 075,4 |
№ 12-0090 / 19 of 08.05.2019 |
ABOUT |
July-September 15 |
Purchases were made by means of a competition with a preliminary qualification selection of 6 times |
|
5 |
" construction of a modular gas-fired boiler house for-fueled boiler house for the "Krasnoarmeyskaya" boiler house in the village of Fedorovka " (2.4 MW) |
84 699,2 |
№ 12-0086 / 19 of 08.05.2019 |
ABOUT |
July-September 15 |
|
|
6 |
" construction of a modular gas-fueled boiler house for the Ostrovsky village of Fedorovka "(1 MW) |
51 921,5 |
№ 12-0054 / 19 of 08.04.2019 |
ABOUT |
July-September 15 |
|
|
7 |
"construction of a gas-fired modular boiler house for secondary school No. 4 in Fedorovka village" (0.8 MW) |
47 346 |
№ 12-0087 / 19 of 08.05.2019 |
ABOUT |
July-September 15 |
|
|
|
total for regional development |
289 042.1 |
|
|
|
|