Information for modular boiler rooms

Information

 for modular boiler rooms

Thousand tenge

№

Name

The Cost Of

 

The Conclusion Of

The Financing

Implementation period

Note

1

"construction of a gas-fired modular boiler house for secondary school No. 3 in Fedorovka village"

(0.7 MW)

51 668.1

№ 12-0089 / 19 from 08.05.2019

dcz

May-August

Procurement was conducted by way of competition with the use of special order 4 times

2

"Construction of a modular boiler the gas fuel to the boiler-house TSRB village fedorivka"

(3,6 MW)

101 237

№ 12-0088 / 19 from 08.05.2019

dcz

May-August

3

"construction of a gas-fired modular boiler house for the Central boiler house of Fedorovka village"

(4 MW)

89 163.4

№ 12-0055 / 19 of 08.04.2019

DKZ

May-August

 

TOTAL DKZ

242 068,5

 

 

 

 

4

"construction of a modular gas-fueled boiler house for secondary school No. 1 in the village of Fedorovka"

(6 MW)

105 075,4

№ 12-0090 / 19 of 08.05.2019

ABOUT

July-September 15

Purchases were made by means of a competition with a preliminary qualification selection of 6 times

5

" construction of a modular gas-fired boiler house for-fueled boiler house for the "Krasnoarmeyskaya" boiler house in the village of Fedorovka "

(2.4 MW)

84 699,2

№ 12-0086 / 19 of 08.05.2019

ABOUT

July-September 15

6

" construction of a modular gas-fueled boiler house for the Ostrovsky village of Fedorovka "(1 MW)

51 921,5

№ 12-0054 / 19 of 08.04.2019

ABOUT

July-September 15

7

"construction of a gas-fired modular boiler house for secondary school No. 4 in Fedorovka village"

(0.8 MW)

47 346

№ 12-0087 / 19 of 08.05.2019

ABOUT

July-September 15

 

total for regional development

289 042.1

 

 

 

 

 