ANALYTICAL REFERENCE based on the results of an internal analysis of corruption risks in the activities of the state institution "Department of Architecture, Urban Planning and Construction of the Akimat of Beimbet Mailin District"

ANALYTICAL REFERENCE

based on the results of an internal analysis of corruption risks in the activities of the state institution "Department of Architecture, Urban Planning and Construction of the Akimat of Beimbet Mailin District"

 

In accordance with paragraph 5 of Article 8 of the Law of the Republic of Kazakhstan "On Combating Corruption" and the Standard Rules for Conducting an Internal Analysis of Corruption Risks, approved by order of the Chairman of the Agency of the Republic of Kazakhstan for Civil Service Affairs and Combating Corruption No. 12 dated October 19, 2016 on the basis of the order of the head of a state institution "Department of Architecture, Urban Planning and Construction of the Akimat of Beimbet Mailin District" dated October 1, 2020 No. 81 "On conducting an internal analysis of corruption risks in the State Institution" Department of Architecture, Urban Planning and Construction of the Akimat of Beimbet Mailin District "from October 1 to 30 November 2020, an internal analysis of corruption risks was carried out.

The analysis of corruption risks was carried out in the activities of the Department of Architecture, Urban Planning and Construction for the period January-September 2020.

 

  1. Identification of corruption risks in regulatory legal acts affecting the activities of the object of internal analysis of corruption risks.

The Department of Architecture, Urban Planning and Construction carries out its activities on the basis of the Regulations on State Institutions, approved by the resolution of the Akimat of the Beimbet Mailin district of July 11, 2019 No. 163. The functions of the Department, defined in the Regulations, comply with regulatory legal acts.

The main regulatory legal acts by which the Department is guided in its activities are: Law of the Republic of Kazakhstan dated July 16, 2001 "On architectural, urban planning and construction activities in the Republic of Kazakhstan", Standards of public services "Issuance of a certificate to determine the address of real estate objects in the Republic of Kazakhstan "," Provision of source materials for the development of construction and reconstruction projects (redevelopment and re-equipment) "," Approval of a sketch (draft design) "," Provision of a land plot for the construction of an object within a settlement "," Issuance of a decision for a complex of post-utilization works objects (demolition of buildings) ".

Based on the analysis of the regulatory legal acts regulating the activities of the Department of Architecture, Urban Planning and Construction, discretionary norms were not identified. The presence of functions that have signs of public services has not been identified.

 

  1. Identification of corruption risks in the organizational and management activities of the object of internal analysis of corruption risks

 

  1. Personnel management

The staff of the Department is 3 units (the head of the department, the main specialists -2). For the period of the analysis, the Department is fully staffed, there are no vacancies.

There were no facts of demotion from among the employees of the department.

The job descriptions of the civil servants of the Department fully reflect their official rights and duties, there are no facts of duplication of duties of employees.

The provision of vacations to the employees of the department is carried out in accordance with the approved schedule and strictly in accordance with the law on public service and the labor code of the Republic of Kazakhstan. In the analyzed period, there were no facts of recalling a department employee from vacation.

Bonuses for employees are carried out in accordance with the legislation of the Republic of Kazakhstan. During the analyzed period, bonuses were not paid to employees.

There are no facts of awarding bonuses to employees with an unreleased disciplinary sanction.

Based on the results of the analysis of the sphere of personnel management, no corruption risks were identified.

 

  1. Disciplinary practice.

In the analyzed period, there was the fact of involving an employee of the Department of the Chief Specialist Bayaziev S.B. to disciplinary responsibility for the commission of a disciplinary offense expressed in improper behavior in everyday life.

 

 Compliance with business ethics

During the analyzed period, there were no facts of bringing employees of the Department to responsibility for committing corruption offenses, as well as misconduct discrediting the civil service.

 

  1. Documentation support

Documentation support in the department is carried out on the basis of the Rules for documenting, document management and use of electronic document management systems in state and non-state organizations, approved by the Government of the Republic of Kazakhstan dated October 31, 2018 No. 703.

Orders are numbered by sequential numbering within a calendar year.

Based on the results of the analysis of the sphere of personnel management, no corruption risks were identified.

  1. Implementation of basic functions

On the basis of the Regulation on the state institution (hereinafter - the Regulation), approved by the resolution of the Akimat of the Beimbet Mailin district of July 11, 2019 No. 163, the Department carries out a number of functions of local government in the field of architecture, urban planning and construction within the boundaries (lines) of the settlements of the district. These features include:

1) monitoring of facilities and complexes under construction (planned for construction)

The function is implemented in accordance with the Law of the Republic of Kazakhstan dated July 16, 2001 "On architectural, urban planning and construction activities in the Republic of Kazakhstan".

When implementing this function, monitoring is carried out to achieve the indicators of the index of physical volume (IFO) of construction work in the Beimbet Mailin district and the commissioning of housing.

For the analyzed period, the indicators were:

- IFO of construction work amounted to 5855 million tenge for the period January - September 2020;

- housing commissioning amounted to 1,575 m2 for the period January - September 2020.

Based on the analysis of this function, no corruption risks were identified.

 

 

 

 

2) provision of public services in the manner prescribed by law;

The department provides 5 types of public services:

  1. Issuance of a certificate for determining the address of real estate objects in the territory of the Republic of Kazakhstan.

The public service is provided in accordance with the Standard approved by the order of the acting Of the Minister of National Economy of the Republic of Kazakhstan dated March 27, 2015 No. 257.

The provision of public services is carried out through the State Corporation "Government for Citizens", as well as the web portal "electronic government".

During the analyzed period, 20,587 services were provided, of which 7 services were provided through the State Corporation "Government for Citizens", 20,580 services were provided through the "electronic government" web portal.

The actual processes for the provision of public services comply with the approved Standard, the facts of requesting unforeseen documents from the applicants were not revealed.

The grounds for refusal to provide a public service are clearly defined in the Public Service Standard.

There were no facts of refusal to provide public services.

No discretionary terms and powers have been identified in the approved Standard for the provision of public services.

Based on the analysis of the provision of the service, no corruption risks were identified.

  1. Providing source materials for the development of construction and reconstruction projects (redevelopment and re-equipment)

The public service is provided in accordance with the Standard approved by the order of the acting Of the Minister of National Economy of the Republic of Kazakhstan dated March 27, 2015 No. 257.

The provision of public services is carried out through the web portal of "electronic government".

During the analyzed period, 17 services were provided, all services were provided through the web portal of "electronic government".

The actual processes for the provision of public services comply with the approved Standard, the facts of requesting unforeseen documents from the applicants were not revealed.

The grounds for refusal to provide a public service are clearly defined in the Public Service Standard.

No discretionary terms and powers have been identified in the approved Standard for the provision of public services.

Based on the analysis of this function, no corruption risks were identified.

  1. Coordination of the sketch (sketch design).

The public service is provided in accordance with the Standard approved by the order of the acting Of the Minister of National Economy of the Republic of Kazakhstan dated March 17, 2016 No. 137.

The provision of public services is carried out through the web portal of "electronic government".

During the analyzed period, 6 services were provided, all services were provided through the web portal of "electronic government".

The actual processes for the provision of public services comply with the approved Standard, the facts of requesting unforeseen documents from the applicants were not revealed.

The grounds for refusal to provide a public service are clearly defined in the Public Service Standard.

There were no facts of refusal to provide public services.

No discretionary terms and powers have been identified in the approved Standard for the provision of public services.

Based on the analysis of the provision of the service, no corruption risks were identified.

  1. Provision of a land plot for the construction of an object within the boundaries of a settlement (stage 1).

The public service is provided in accordance with the Rules for the provision of public services in the field of land relations approved by order of the Minister of Agriculture of the Republic of Kazakhstan dated October 1, 2020 No. 301.

The provision of public services is carried out through the State Corporation "Government for Citizens", as well as the web portal "electronic government".

During the analyzed period, 2 services were provided, all services were provided through the State Corporation "Government for Citizens".

The actual processes for the provision of public services comply with the approved Standard, the facts of requesting unforeseen documents from the applicants were not revealed.

The grounds for refusal to provide a public service are clearly defined in the Public Service Standard.

No discretionary terms and powers have been identified in the approved Standard for the provision of public services.

Based on the analysis of this function, no corruption risks were identified.

 

  1. Issuance of a decision for a complex of works on post-utilization of facilities (demolition of buildings)

The public service is provided in accordance with the Rules for the provision of public services "Issuance of a decision on a complex of works on post-utilization of facilities (demolition of buildings)", approved by order of the acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated March 30, 2020 No. 167.

The provision of public services is carried out by submitting an application to the service provider's office or through the web portal of "electronic government".

During the analyzed period, no applications for the provision of public services were received.

The actual processes for the provision of public services comply with the approved Rules.

The grounds for refusal to provide a public service are clearly defined in the Public Service Standard.

No discretionary terms and powers have been identified in the approved Standard for the provision of public services.

Based on the analysis of this function, no corruption risks were identified.

3) ensuring the effective use of budgetary funds and material assets in accordance with the intended purpose;

The function is regulated by the Budget Code of the Republic of Kazakhstan dated December 4, 2008 and the Law of the Republic of Kazakhstan "On Public Procurement" dated December 4, 2015.

As part of the implementation of this function, budgetary applications are developed and submitted, financing plans are drawn up, and a public procurement schedule is approved.

Based on the analysis of this function, no corruption risks were identified. Inappropriate use of budget funds has not been identified.

 

4) representation in the established manner of the interests of a state institution in courts.

During the analyzed period, the Division acted as a plaintiff in the Specialized Court:

- to LLP "Insekt", the statement of claim "On the enforcement of the performance of warranty obligations";

- to SanzharProektService LLP the statement of claim “On recognition of a public procurement participant as unfair”;

- to Firm “Energiya” LLP the statement of claim “On recognizing a participant in public procurement as unfair”.

Based on the analysis of this function, no corruption risks were identified.

 

5) coordination of activities for the implementation of the integrated scheme of urban planning of the territory of the district (draft district planning), general plans of rural settlements, approved in the manner prescribed by law;

The function is carried out in accordance with the Law of the Republic of Kazakhstan "On architectural, urban planning and construction activities in the Republic of Kazakhstan" and the Land Code of the Republic of Kazakhstan.

General plans of the villages of Kyet and the village of Tobol were approved in 2018. The concept of the city's master plan defines the foundations and principles of the future development of the settlement until 2050, and reveals its potential opportunities, outlines the priorities for further territorial and socio-economic development. The general plans are posted on the official website of the Akimat of the Beimbet Mailin district.

The selection of land plots for construction is carried out in strict accordance with the master plans within the framework of the state service "Provision of a land plot for the construction of an object within the boundaries of a settlement."

Based on the analysis of the function, no corruption risks were identified.

 

6) making proposals for construction, engineering preparation of the territory, landscaping and planting of greenery, conservation of construction of unfinished objects, carrying out a set of works on post-utilization of objects of regional significance;

The function is carried out in accordance with the Law of the Republic of Kazakhstan "On architectural, urban planning and construction activities in the Republic of Kazakhstan" and the Budget Code of the Republic of Kazakhstan.

In the analyzed period, as part of the implementation of this function, budget applications for 2020-2022 were submitted to the Department of Construction, Architecture and Urban Planning for the development of design and estimate documentation for objects:

- Construction of a block-modular boiler house to the Mayskaya secondary school in the village of Mayskoye, Beimbet Mailin district, Kostanay region;

- Reconstruction of the water supply and distribution networks in the village of Mayskoye, Beimbet Mailin district, Kostanay region;

- Construction of a gas pipeline to a residential building in the village of Tobol, Beibitshilik str. 114, Beimbet Mailin district, Kostanay region;

- Construction of a water supply system and distribution networks in the village of Krasnoselsky, Beimbet Mailin district, Kostanay region.

for 2020-2022 to carry out construction work on the project

- Construction of water supply systems and distribution water supply networks in the village of Valerianovka, Taranovsky district, Kostanay region;

- Construction of engineering networks for pastures with an area of ​​2531 hectares in Taranovsky district of Kostanay region

Based on the analysis of this function, no corruption risks were identified.

7) organization of the development and submission for approval to the district maslikhat of schemes for urban development of the territory of the district, as well as draft master plans of rural settlements;

For consideration by the district budget commission, budget applications were sent for the allocation of funds for the development of master plans with topographic survey of the village of Asenkritovka worth 3,978.0 thousand tenge, the village of Novoilinovka worth 5,213.0 thousand tenge and the village of Yubileinoe worth 3,978.0 thousand tenge. tenge. Based on the results of consideration of budget applications, the development of master plans with a topographic survey of the village of Asenkritovka, the village of Novoilinovka and the village of Yubileinoye of the Beimbet Mailin district in 2020 is not possible due to the lack of funds

Based on the analysis of this function, no corruption risks were identified.

 

8) implementation of urban planning projects developed for the development of approved master plans (territorial development schemes) of settlements;

The implementation of state investment projects has begun:

Execution of construction work on the object “Construction of water supply systems and distribution networks in the village. Valerianovka of Taranovsky district of Kostanay region ".

Contracts concluded:

- Construction and installation works (construction and installation works), contractor Firma Energia LLP in the amount of 432,682,650.29 tenge for 2019-2020:

- Technical supervision contractor LLP "Engineering and Production Center" Alliance "in the amount of 13,240,089.46 tenge for 2019-2020:

- Designer's supervision contractor PIP Kostanayvodproekt LLP in the amount of 5 384 495.20 tenge for 2019-2020.

During the analyzed period, it was mastered - 137.9 million tenge

Commissioning is expected in November 2020.

 

Execution of construction work on the object "Construction of engineering networks for pastures with an area of ​​2531 hectares in the Taranovsky district of the Kostanay region"

Contracts concluded:

No. 19 dated April 9, 2020 for construction and installation work with AiF LLP. The total cost of construction and installation works amounted to 210 633.0 thousand tenge.

No. 20 of April 2, 2020 for the performance of engineering services for technical supervision with the LLP "Directorate of enterprises under construction" Stroyintegratsiya "in the amount of 6 445.0 thousand tenge,

No. 21 of April 29, 2020 for the implementation of engineering services for field supervision with the IP "Vladimir Fedorovich Kochin" in the amount of 2 621.0 thousand tenge.

Construction period: July-August 2020, June 2021.

During the analyzed period, it was disbursed - 149 817.0 thousand tenge.

Commissioning is expected in 2021.

No corruption risks were identified for the project.

 

Development of design and estimate documentation for the project "Construction of a water supply system and distribution networks in the village of Krasnoselsky, Beimbet Mailin district, Kostanay region."

Contract No. 22 of April 15, 2020 was concluded for the performance of construction and installation works with SanzharProektService LLP. The total cost of design work was 9,905,050.01 tenge.

A positive expert opinion is expected in December this year.

For the analyzed period, mastered - 0.0 tenge

Construction and installation work will be carried out approximately in 2021.

No corruption risks were identified for the project.

 

Development of design estimates for the project "Construction of a block-modular boiler house to the Mayskaya secondary school in the village of Mayskoye, Beimbet Mailin district, Kostanay region."

Contract No. 50 dated August 17, 2020 for construction and installation works was concluded with IgilikStroyProekt LLP. The total cost of design work was 4,219,123.99 tenge.

Currently, the project documentation has been prepared.

For the analyzed period, mastered - 0.0 tenge

The project examination is scheduled for 2021.

No corruption risks were identified for the project.

 

Construction of a gas pipeline to a residential building in the village of Tobol, Beibitshilik str. 114, Beimbet Mailin district, Kostanay region.

Contract No. 78 dated December 24, 2020 for construction and installation works was concluded with IgilikStroyProekt LLP. The total cost of design work was 3,442,500.01 tenge.

The design documentation is currently being developed.

During the analyzed period, it was spent - 0.0 tenge.

The project examination is scheduled for 2021.

No corruption risks were identified for the project.

 

Development of design and estimate documentation for the project "Reconstruction of the water supply and distribution networks in the village of Mayskoye, Beimbet Mailin district, Kostanay region."

Contract No. 65 of March 11, 2020 was concluded for the performance of construction and installation works with PIP Kostanayvodproekt LLP. The total cost of design work was 11,749,550.01 tenge.

At present, the development of design estimates is underway.

The examination is scheduled for 2021.

For the analyzed period, mastered - 0.0 tenge

No corruption risks were identified for the project.

 

9) development of proposals for the selection, provision, and in the cases provided for by legislative acts, and withdrawal for state needs of land plots for development or other urban development;

In the analyzed period, the seizure of land plots for state needs was not made.

 

10) development and approval of draft legal acts on architecture, urban planning and construction;

In the analyzed period, the development of normative legal acts on architecture, urban planning and construction was not carried out.

 

11) carrying out work to comply with the rules and regulations for planning and development of settlements;

The settlement is being built up in accordance with the zoning provided by the master plan. Projects are developed in compliance with applicable rules and regulations in the field of construction, architecture and urban planning.

Based on the analysis of this function, no corruption risks were identified.

 

12) issuing an architectural and planning assignment;

The function is implemented within the framework of the state service "Provision of raw materials for the development of construction and reconstruction projects (redevelopment and refurbishment)".

In the analyzed period, 17 services were provided.

Based on the analysis of this function, no corruption risks were identified.

 

13) reconstruction and construction of educational, sports, culture, landscaping, agriculture, engineering and communication networks, housing and communal services, water supply systems in the district;

As part of this function, the project "Construction of water supply systems and distribution networks in the village of Valerianovka, Taranovskiy district, Kostanay region" is being implemented, for the period January - September 2020, the development amounted to 137.9 million tenge.

(276.5 million tenge January-December)

Based on the analysis of this function, no corruption risks were identified.

 

14) organization of work on the delivery of completed construction facilities and their transfer to the balance sheet of operating enterprises and organizations;

In the analyzed period, the facility was put into operation "Construction of a water supply and distribution networks in the village of Novoilinovka, Taranovskiy district, Kostanay region." The object was transferred to the balance of the GKP "Tobol".

  Based on the analysis of this function, no corruption risks were identified.

 

15) implementation of acceptance of work performed and services rendered in accordance with contractual obligations;

In the analyzed period, the acceptance of the work performed was not carried out.

Based on the analysis of this function, no corruption risks were identified.

 

  1. Implementation of functions for the implementation of public procurement

In the analyzed period, the Department concluded 78 contracts on public procurement for a total amount of 434,280,288.42 tenge, of which 72 contracts (6108.1 thousand tenge) were concluded by the method from one source by direct conclusion of the contract, 2 contracts were concluded by means of an open tender (269060 , 0 thousand tenge), by means of a tender with preliminary qualification selection, 2 contracts were concluded (158140.0 thousand tenge), 2 contracts were concluded by request for price proposals (971.9 thousand tenge)

The legal deadlines for posting the public procurement plan, as well as the amendments made to the plan on the public procurement portal, were not violated.

Document flow in the field of public procurement is carried out in electronic form, invoices, acts of work performed are drawn up exclusively in electronic format.

Based on the analysis of this function, no corruption risks were identified.

 

  1. Appeal of individuals and legal entities.

In the analyzed period, 3 requests were received. The main issues of the appeals were the construction of various types of facilities.

There were no facts of violation of the terms of consideration of applications.

In the analyzed period, the citizens did not apply to the head of the department for a personal appointment.

There were no complaints against the staff of the Division.

Based on the analysis of this function, no corruption risks were identified.

 

Based on the above, I recommend:

  1. To prevent the facts of violation of the terms in the provision of public services.
  2. When conducting public procurement, ensure strict compliance with the Law of the Republic of Kazakhstan "On public procurement", ensure competition between potential suppliers.
  3. Eliminate the facts of violation of the Rules for documenting, document management and use of electronic document management systems in government and non-government organizations, approved by the Government of the Republic of Kazakhstan dated October 31, 2018 No. 703.

 

 

The analytical note was made by:

Chief Specialist                                                                                                       S. Bayaziev

November 30, 2020

 

 

Head of Department                                                                                                          K. Kubenov

ANALYTICAL REFERENCE based on the results of an internal analysis of corruption risks in the activities of the state institution "Department of Architecture, Urban Planning and Construction of the Akimat of Beimbet Mailin District"