
Inorder to ensurereliableeconomicalanduninterrupted power supply to consumers, Tarazenergocenter JSChasdevelopedmeasurestoprepareforworkin the autumnwinterperiodof 2024-2025 According to the investmentprogramforthermalenergy, the replacement of the batterytankNo.1 of the CHP4and the purchase of a steam jet ejector are underwayDismantling of the batterytank has begun The work is carried out by the contractor"ZHMFImstalcon" LLP According to theequipmentrepairscheduleatCHPP4, the steamboilerno2.Duringtherepairwork, the mainsteamvalveisreplaced, the bendsand the controldrum are cleaned, the shut-off valves are repairedaswellas the replacement of the coldsuperheaterpackageIn the turbineshop, the uppercylindercover of steamturbineNo.2isopenedtodefectandcheck the rotarydiaphragm of the productionselection