In general, preparations for the upcoming heating season are carried out in the normal mode.
Since the beginning of this year in the Republic of Kazakhstan, the generation of electric energy amounted to 63,903.23 million kWh or 98.6%, consumption amounted to 64,790.45 million kWh or 99.7% compared to last year.
In accordance with the schedule of repairs approved by the System Operator at power plants, major repairs of 9 power units, 60 boilers and 42 turbines are planned in 2022.
As of today, repairs have been completed on 2 power units, 11 boilers and 10 turbines. At various stages, repairs are carried out on 4 power units, 35 boilers and 18 turbines.
By electric networks
To prepare the electric networks of the unified electric power system of the Republic of Kazakhstan for the autumn-winter period of 2022-2023, repairs of power transmission lines with a total length of 20201.57 km are planned, including: Overhead line-1150 kV – 6 km, overhead line-500 kV – 26 km, overhead line-220 kV – 1277.52 km; Overhead line-110 kV – 3047.67 km; Overhead line-35 kV – 3465 km; Overhead line-6-10kV – 6472.67 km; Overhead line-0.4 kV – 5511.65 km; Overhead line-6-10kV – 295.31 km; CL-0.4 kV – 99.74 km, as well as substations – 712 pcs.; RP, TP, KTP – 3806 pcs.
To date, 5,751.22 km of power transmission lines have been repaired, which is 28% of the plan of the year, as well as: 116 substations, which is 16% of the plan of the year and 921 RP, TP, KTP, which is 24% of the plan of the year.
The country's power plants have accumulated 3.5 million tons of coal and 91.5 thousand tons of fuel oil, which generally corresponds to the level of last year.
The Committee of Atomic and Energy Supervision and Control of the Ministry of Energy of the Republic of Kazakhstan monitors the progress of preparations for the upcoming heating season 2022-2023.