Auction Documentation for the Site Included in the Siting Plan for Generating Facilities with a Flexible Generation Mode with the Available Preliminary Feasibility Study (Combined-Cycle Gas Turbine in the City of Turkestan)
Auction Documentation for the Site Included in the Siting Plan for Generating Facilities with a Flexible Generation Mode with the Available Preliminary Feasibility Study (Combined-Cycle Gas Turbine in the City of Turkestan)
Дата публикации
20 мая 2022