"Average repair of Taskala-Akkurai-Bolashak 48-96km"
On the "Average repair Tasala-URI-48-96 km Bolashak" work is underway on the device of the curb. There is a filling of roadsides with a crushed-gravel mixture, grading. The roadsides are filled with a mixture of gravel and crushed stone.