A citizen, summary of the question |
Implementation |
|
Pavel Petrovich Tkach - Chairman of the ethno-cultural association "Aliya", a member of the Communist Party. On demolition of cemeteries, theft of bricks and fences |
In 2019, police officers during preventive measures on the territory of Atyrau revealed 2 facts of theft of metal fences of cemeteries and detained suspects. According to Art. 188 h. 1 of the Criminal Code of the Republic of Kazakhstan, their crimes were proven and the cases were sent to court. For 6 months of 2020, the facts of the demolition of cemeteries were not registered. |
|
Kubaidolla Zeinollayevich Sholak is a resident of the city of Atyrau. Restriction of the movement of heavy goods exceeding the permissible weight on the Uralsk-Atyrau, Atyrau-Inder highways |
A road sign 3.12 "Limiting axle load" in the amount of 8 tons was installed on the regional road "Atyrau-Inder"; cargo. For 6 months of 2020, 36 administrative cases were initiated on the Atyrau-Inder regional road. Including, for violations of weight parameters - 7, for violations of the rules for the carriage of goods - 19, for the carriage of goods without consignment notes - 10. For violations, fines were imposed in the amount of 1,125.0 thousand tenge, fines in the amount of 416,7 thousand tenge. In total, 510 administrative cases were initiated for carriers on the republican highway "Atyrau-Uralsk". Fines were imposed on them in the amount of 14,824.8 thousand tenge, and fines in the amount of 3,349.4 thousand tenge were collected. Also, the correspondent of the newspaper "Ak Zhaiyk" and the TV channel "Kazakhstan-Atyrau" organized raid events on television patrolling, photo and video recording. Appropriate work has been organized aimed at creating zero tolerance for violations in the field of road transport by sending a message and registering to the Situation Center of the Transport Committee about the facts of violations through the pages of local media and inspections on the social networks Fasebook, Instagram, WhatsApp messenger. In addition, the RSI "Inspectorate of transport control in the Atyrau region" has developed and approved a roadmap for road maintenance and control over the passage of mining vehicles for 2020. |
|
Aibek Idiyatov - a resident of the city of Atyrau. Issues of establishing special sound signals or other signs in public places, buses, pedestrian crossings for the blind and bringing ramps in large shopping places in accordance with the requirements |
The akimat of the city of Atyrau constantly sends proposals on creating conditions for people with disabilities, equipping pedestrian paths, installing ramps, installing parking signs, and small and medium-sized businesses in the city. From July 2019 to the present, a total of 247 buildings have been checked for compliance with ramp standards. As a result of the inspection, it was found that the ramps of 44 buildings do not meet standards. Currently, there are ramps for disabled people and 6 parking units in the Dina shopping center, 2 in the Atyrau shopping and entertainment center, 8 in the Baizar shopping and play center, 2 in the Nasikha shopping center, and in the Saraishyk communal market. 1, on the market "Koktem" - 3, in the trading house "Master Dom" - 1, in LLP "StroyInvest - K" there is 1 parking for disabled people. In addition, the akimats of the markets were given comments on patching inside the market and it was recommended to organize a special duty officer for the blind or hard of hearing at large shopping facilities in the city. To date, an auxiliary control panel has been installed in the Koktem, Dina, and Murager retail outlets; it is planned to place the auxiliary control panel in the Saraishyk communal market and in the Nasikha trading house. In order to ensure the unimpeded passage of citizens with disabilities in wheelchairs in the city of Atyrau (on Beibarys, Kurmangazy, Gumarov, Valikhanov, Gabdiyev, Amandosov, Madenov, Azattyk, Gagarin, Datov streets and on the 0-10 km of the Atyrau-Inder highway) as part of road reconstruction projects, it is envisaged to build ramps (ramps) on pedestrian paths for wheelchair users, and work is underway to reduce curbs for the blind. This year, within the framework of the project for the reconstruction of the squares of S. Mukashev, Kurmangazy, K. Smagulov, in order to create conditions for unhindered movement in wheelchairs and blind citizens with disabilities, work is being carried out on the construction of tactile decks and road slopes (ramp) with a total area of 1501.2 sq. m. Also for the blind in the buses of the city, autoinformators-sound devices (notifying stops) are installed. However, due to the fact that the existing format of tablet validators does not support sound devices, it is not possible to launch autoinformers. Nevertheless, to solve this problem, it is planned to update the technical equipment in the future, that is, to replace it with validators of a new modern format. Currently, out of 30 existing buses have ramps. This year, Akzhaiyk Avtopark LLP plans to equip 170 new buses with such equipment for people with disabilities. In addition, on the pedestrian bridge near the D. Nurpeisova Academy, where construction work is underway, an operational staircase for people with disabilities is provided. Work in this direction will continue. |
|
Zhazira Amanbayeva - a resident of the village of Zhana Karaton, Zhylyoy district. Construction of a road to the village of Zhana Karaton |
For the reconstruction of intra-village highways and pedestrian paths in the village of Zhana Karaton, Zhylyoy district, design estimates were developed, and a state examination was carried out. This project provides for the construction of an asphalt-concrete road 33.4 km long to 117 inter-quarter driveways in the village of Zhana Karaton. The issue of financing will be considered when formulating the budget for 2021-2023, as far as possible. |
|
Ulday Kozhykova - a mother of many children, a resident of the city of Atyrau. About shortcomings in the performance of their official duties by doctors of the City Polyclinic No. 7. |
In accordance with the order of the Head of the Directorate of Healthcare of the Atyrau region No. 276 of June 10, 2020, a commission was created, an official check of the Atyrau City Polyclinic No. 7 was carried out. According to the results of the check, it was established that according to the portal of the national register, U. Kozhykova and his children were registered in the City Polyclinic No. 7 of Atyrau and U. Kozhykova were registered with several diagnoses. U. Kozhykova and her children were under the supervision of the doctors of the polyclinic. Polyclinic provided U. Kozhykova and her children with free medicines and repeatedly bought foreign medicines. According to the results of the check by the polyclinic, revealed during the provision of medical care, no shortcomings were found. |
|
Kuanyshbek Kenzhegaliyev - a resident of Atyrau, a disabled person of the 2nd group. Questions on the improvement of open wells in the city |
There are about 20 thousand control wells on the communal water supply and sewerage networks serviced by the CSE “Atyrau Oblysy Su Arnasy”. The employees of the institution are continuously working to identify open water and sewer wells and to immediately close them. The open wells identified in the institution and the measures taken to close them are assigned by order to each foreman certain areas for daily inspection of water and sewer wells with an entry in a special journal. Every day, the staff of the institution closes on average 10-12 wells, work is carried out around the clock. When open wells are found, a message has been posted about the need for notification through social networks or the dispatch service of the institution (tel: 45-47-12). |
|
Galina Khristoforovna Chernova - public association "Globus", a resident of Atyrau. The problem of restoring water resources, including the Ural River |
The state of the transboundary river Ural is under constant control of the regional akimat and a number of measures are being taken to use and protect it. In order to reduce the load on it by minimizing the volume of water intake from the Ural River, the issue of using for the benefit of the population of the Atyrau region the groundwater reserves "Kokzhide", one of the large deposits of the Western region, located in the southwestern part of the Aktobe region. At present, funds from the republican budget have been allocated to the Akimat of the Aktobe region to reassess the fresh groundwater reserves of "Kokzhide" and work is underway. In order to ensure the reproduction of its animal world and fish stocks, large-scale work is being carried out with the regional construction department - the project "Increasing the water content and improving the hydrological regime of the Ural River". In addition, the branch of the Republican State Enterprise "Kazhydromet" in the Atyrau region, in order to study the hydrological and hydrochemical regime of the Ural River, monitors the water level and water discharge at 5 hydrological posts. The Akimat of Atyrau Oblast has sent a proposal to the Ministry of Ecology, Geology and Natural Resources of the Republic of Kazakhstan to accelerate the development of a set of measures to further improve the hydrological regime of the Ural River. |
|
Ulmeken Turlanova - a resident of the city of Atyrau. Consider the construction of a new kindergarten in the Koktem microdistrict |
The construction department of the city of Atyrau has developed design estimates for the construction of a new kindergarten for 160 children in the Koktem microdistrict, and a state examination has been carried out. The issue of financing will be considered when forming the budget for 2021-2023 as far as possible |
|
Asel Lukpanova - a resident of Bereke village, Atyrau city. Providing complete infrastructure for the newly built sections of the village of Bereke (electricity, natural gas, roads, water supply networks) |
In order to carry out overhaul of 19.3 km of intra-village roads with. An open tender has been announced for Bereke, the contractor has been identified. Construction of 57.6 km of water supply networks in the village. Bereke has been running since May this year. In addition, an examination of design estimates for the construction of 23.1 km of electrical networks in the village was carried out. The issue of financing will be considered when formulating the budget for 2021-2023, as far as possible. |
|
Aibolat Sakhiyev - resident of the village of Almaly, Atyrau. For lighting and road construction in the village. Almaly |
Design estimates have been prepared for the construction of 15.2 km of intra-village roads in the village. Almaly. Construction of 12.8 km of electrical networks in the village is underway Almaly. In addition, construction and installation work on the 10.6 km of the gas pipeline in the village has been underway since May this year. |
|
Residents of the village of Saryozek, the city of Atyrau Construction of a road and clean drinking water in the Saryozek village |
Currently, work is underway to build a water pipeline in the Saryozek microdistrict (Chyornaya Rechka). In addition, design estimates for the construction of roads in settlements are being developed, documents are being collected to be sent for state expertise. |
|
Serikbay Kuanyshev - a resident of the village of Aksay-2. Construction of a special sports facility for residents of Aksay village |
Design and estimate documentation for a multifunctional sports complex in the village. Aksay and passed the state examination. The necessary funds are being considered for construction work. |
|
Zhamal Khalel - a resident of the city of Kulsary. Construction of a new stadium in the city of Kulsary |
The construction of a large stadium in Kulsary is carried out under the Igilik program of Tengizchevroil LLP. Completion of construction work is scheduled for Q2 2021.
|
|
Zhamal Khalel - a resident of the city of Kulsary. Construction of a 75-bed hospital in the city of Kulsary |
The construction of a 75-bed hospital in Kulsary is carried out under the Igilik program of Tengizchevroil LLP. Completion of construction work is scheduled for Q2 2021. |
|
Galiya Ibrasheva - a resident of the village of Inderbor. Fencing polygons in the area |
The number of polygons in the district is 11, the total area is 71 hectares. In the district, a budget application was submitted for the necessary funds to fence sites for the collection of solid waste in 8 settlements. |
|
Gulsim Khanatovna Nauryzova- resident of the village of Yesbol, Inder district, teacher of the K.Yeskaliyev Emergency Secondary School Construction of a new school to replace the K.Yeskaliyev Emergency Secondary School |
Currently, the Directorate of Construction of the Atyrau region has developed design and estimate documentation for a school for 320 places in the village. Yesbol and received a positive conclusion of the state examination. The necessary funds are being considered for construction work. |
|
Bolat Dauletov - Chairman of the Council of Veterans of the Orlikovskiy rural district of the Inder district. Repair of intra-village roads of Koktogay, Orlik villages |
In the village of Koktogay, work is underway to repair 12.9 km of intra-village roads. Construction is scheduled to be completed by the end of the year. Design estimates have been developed for the repair of intra-village roads in the Orlik village. The issue of financing will be considered when formulating the budget for 2021-2023, as far as possible. |
|
Aiymgul Mashayeva - a resident of the Akkystau village of the Isatay district. Road construction of intra-village streets |
Akimat of Isatay district developed 2 projects "Reconstruction of intra-village highways in the Akkystau village" (16.3 km, 25 streets) and "Overhaul of intra-village roads in the Akkystau village" (8.2 km, 19 streets). Currently, the project "Overhaul of intra-village roads in the Akkystau village" is included in the "Employment Roadmap - 2020" program, the contractor has begun overhaul. In order to implement the working project "Reconstruction of intra-village highways in the Akkystau village", a request was submitted. As funds are allocated, appropriate work will be carried out. |
|
Kenzhebay Sagyngaliyev - a resident of the Akkystau village of the Isatay district, a pensioner. Construction of a pedestrian path along E. Yeszhanuly street, installation of road signs |
In the village of Akkystau, Isatay district, 2 projects with a total length of 24.4 km were developed and positive expert opinions were obtained. Due to the fact that these projects did not introduce pedestrian paths on the street. E.Yeszhanuly, in the future it is planned to introduce footpaths into the new project. Currently, at the intersection of Yeszhanuly and Abulkhairova streets, there are 2 pedestrian signs. |
|
Marat Ayupov - a resident of the Kurmangazy village, a pensioner. Provision of a land plot for individual housing construction to residents of the Kurmangazy village |
In order to provide engineering and communication infrastructure for the residential area of the new residential areas "Bolashak", "Shipazhay" in the village of Kurmangazy, roads are being built, gas pipelines, water pipelines and electrical networks are being built. After the delivery of these microdistricts, residents who are on the waiting list for housing will be provided with land plots in the microdistrict. Bolashak - 68, md. "Ship" - 400. The district akimat plans to complete construction work and provide land plots by the end of this year. |
|
Kendebay Baukeshev - a resident of the Akkol rural district, Kurmangazy district. Commissioning of a kindergarten for 290 children in the village of Akkol |
At present, a kindergarten for 290 children is under construction in the village. Akkol Kurmangazy district. The kindergarten is planned to be commissioned in the second half of this year. |
|
Madeniet Khamzayev - Chairman of the Council of Veterans of the Birlik Rural District of the Kurmangazy District. Completion of work on overhaul of the highway between Kurmangazy and Birlik rural district |
In 2018, funds from republican and local budgets were allocated for the overhaul of the regional road "Kurmangazy-Primorye-Birlik-Kotyaevka 0-29", and work began on the construction of roads. The road construction period is 2018-2020. Construction work is scheduled to be completed this year. |
|
Muratay Sarmanov - Chairman of the farm "Agrofirma Nurly Dala", individual entrepreneur. Installation of the monument to Khalel Dosmukhamedov in the village of Miyaly |
At present, the regional Directorate of Culture, Archives and Documentation has published an announcement about a competition for a special selection of the monument. |
|
Oryngali Dosanovich Salykov - a resident of the Miyaly village of the Kyzylkoga district, a pensioner. Construction of pedestrian crossings to the central streets of the village of Miyaly |
Currently, changes are being made to the design and estimate documentation developed in 2018 for the construction of sidewalks and footpaths on the streets of the village of Miyaly. In case of completion of design and estimate documentation, passing the examination and allocation of appropriate funds, pedestrian paths will be built along the streets of Zh.Karabalin, Zh.Zhabayev, Kazybek bi, Akkuov, A. Sabirov, K. Satpayev, S. Ussenov, K. Taszhanov, K. Kuanyshev, Boken bi, K. Sagyrbayuly (in total, the project is planned to build 12.8 km of the highway, 8.9 km of footpaths). |
|
Serik Saginov - a resident of the village of Sagyz, Kyzylkoga district. Providing uninterrupted clean drinking water to the village of Sagyz |
Currently, design estimates are being developed for the construction of a reservoir in the village. Sagyz in the volume of 1500 cubic meters m, water injection building 1200 cubic meters per day. |
|
Sabit Suleimenovich Khalenov - a resident of Makat village, Makat district, Chairman of the Regional Council of Veterans. Repair of the platform of the stations in the villages of Makat and Dossor |
For the overhaul of the apron of the stations in the villages of Makat and Dossor, design estimates were developed and a positive expert opinion was received. Budget requests were directed for the necessary funds. |
|
Amaniyaz Tazhenovich Kabdolov - a resident of the Dossor village of the Makat district, a veteran of law enforcement agencies. Reconstruction and commissioning of 2 hot water boilers built in 2008 in the village of Makat |
In the village of Makat, design estimates for the overhaul of 3000 m3 hot water boilers built in 2008 have been developed, and a positive expert opinion has been received. At present, the necessary funds have been allocated, and major repairs are underway. |
|
Tolembay Amanbayev - head of the Shabay peasant farm, a resident of the Ortakshyl village of the Makhambet district. Solving the problem of water disposal with the introduction of the Yesbol-Kazybay canal |
For the overhaul of the Ysbol-Kazybay canal, design and estimate documentation has been developed and passed the state examination. Budget requests were directed to the necessary funds for construction work. |
|
Kadyrzhan Kazymbekovich - a resident of the Tanday village of the Makhambet district. Construction of intra-village roads in the villages of Tanday, Taldykol, Aktogay |
Design estimates have been developed for the overhaul of intra-village roads in the village of Tandai, 2 km, in the village of Taldykol, 3.1 km, and Aktogay, 3.4 km. Repair of intra-village roads in the villages of Taldykol, Aktogay is included in the Employment Roadmap 2020 program, an agreement is concluded with contractors. |
|
Uzakbay Tulegenov - a resident of the Makhambet district, a pensioner. Construction of a new kindergarten in the village of Alga |
Currently, in the village of Alga, Makhambet district, a kindergarten for 90 places is fully provided. In addition, 130 additional children are registered in the kindergarten queue. The Akimat of the Makhambet district has developed design estimates for a new building of a kindergarten for 160 children in the village of Alga and sent a budget application for financing the project. |