On the implementation of the plan of the event on the proposals and comments received from the population during the participation of the reporting meetings of the city and district akims for the third quarter of 2020 to discuss the report of the regional akim "On the results of the socio-economic development of the Atyrau region for 2019 and the tasks for 2020"

 

The respondents,

summary of the issue

Implementation

Pavel Petrovich Tkach – Chairman of the ethnocultural association "Aliya", a member of the Communist Party.

On the issue of vandalism, theft of metal fences and bricks in cemeteries

In 2019, during the course of operational and preventive measures in the city of Atyrau, police officers revealed 2 facts of theft of metal fences of cemeteries and detained suspects. In accordance with Part 1 of Art. 188 of the Criminal Code of the Republic of Kazakhstan, their crimes were proven, the cases were sent to court and received appropriate punishments in accordance with the articles of the Law. To date, in order to prevent this fact, patrol police posts have been brought closer to the suburban cemeteries, and preventive work is being carried out.

For 9 months of 2020, no facts of destruction of cemeteries were registered.

Kubaidolla Zeinollauly Sholak – a resident of the city of Atyrau.

Restrictions on the passage of heavy and bulky goods that exceed the permissible weight on the Atyrau-Uralsk, Atyrau-Inder highways

A road sign 3.12 "Limiting axle load" of 8 tons was installed on the regional road "Atyrau-Inder", regular raids are organized on the roads of republican importance "Atyrau-Uralsk" and regional importance "Atyrau-Inder" in order to control heavy and bulky cargo, not meeting the requirements.

For 9 months of 2020, a total of 50 administrative cases were initiated on the Atyrau-Inder regional road, including 9 for violations of weight parameters, 19 for violations of cargo transportation rules, 13 for transportation of goods without consignment notes. Penalties in the amount of 2 million 356 thousand 405 tenge were charged, penalties in the amount of 652 thousand 732 tenge were collected. In total, 730 administrative cases were initiated against carriers on the republican highway "Atyrau-Uralsk". They were fined in the amount of 16,546,915 tenge, and 3,948,367 tolls were collected.

Also, the correspondent of the newspaper "Ak Zhaiyk" and the TV channel "Kazakhstan-Atyrau" organized raid events for conducting tele-patrols, photo and video recording.

Relevant work is being carried out aimed at creating zero tolerance for violations in the field of road transport by sending a message and registering to the Situation Center of the Transport Committee reports on violations of the active part of the population through local media, social networks Facebook, Instagram Inspections, through the mobile application messenger "WhatsApp ".

Aibek Idiyatov – a resident of the city of Atyrau.

Issues of establishing special sound signals or other signs for people with disabilities in public places, buses, pedestrian crossings and aligning ramps in large retail outlets

 

In the central, rural districts and courtyards in order to ensure the safety of road traffic and pedestrians in the city, road signs are checked and installed in connection with the complaints received.

In order to create a favorable environment for people with disabilities, all organizations that do not have ramps, including social facilities, are issued notifications of the need to establish ramps.

In the third quarter of 2020, 15 buildings were checked for compliance with the ramp standards. In addition, the commission created by the city akimat includes representatives of non-governmental organizations, organizations and institutions of architecture and urban planning, coordination of employment and social programs, healthcare, education, culture, tourism and others. In order to establish the compliance of ramps with standards and parameters, working groups have been created to directly check and measure objects, and its members have been identified. In case of non-compliance of the ramps with the standard, based on the results of the inspection, they are sent to the authorized state employment bodies for taking measures.

Zhazira Amanbayeva – Zhylyoy district, resident of the village Zhana Karaton.

Construction of roads in the village of Zhana Karaton

For the reconstruction of intra-village highways and footpaths in the village of Zhana Karaton, design estimates have been developed, and a state examination has been carried out. This project provides for the construction of an asphalt road 33.4 km long to 117 inter-quarter lanes in the village of Zhana Karaton. The construction of the road is planned for 2021-2022.

Kuanyshbek Kenzhegaliyev – a resident of the city of Atyrau, a disabled person of the 2nd group.

The issue of open wells in the city

                   

There are about 20 thousand control wells on the serviced communal water supply and sewerage networks of the CSE "Atyrau Oblysy Su Arnasy".

From the beginning of the year to the present day, the employees of the CSE "Atyrau Oblysy Su Arnasy" have carried out work to close 1167 wells on water supply and sewerage networks.

To prevent emergencies and take prompt action when open wells are detected, messages have been posted about the need to notify through social networks or the dispatch service of the institution (45-47-12).

Galina Khristoforovna Chernova – a resident of the city of Atyrau, public association "Globus".

The issue of restoring water resources, including the Ural River

 

The state of the transboundary Ural river is under constant control of the regional akimat and a number of measures are being taken to use and protect it.

In order to reduce the load on it by reducing the volume of water intake from the Ural River, the issue of using the Kokzhide underground water reserves for the benefit of the population of the Atyrau region, one of the large deposits of the Western region, located in the southwestern part of the Aktobe region, is being considered.

At present, funds from the republican budget have been allocated to the Akimat of the Aktobe region to reassess the fresh groundwater reserves of "Kokzhide".

In order to ensure the reproduction of its fauna and fish stocks, a large-scale work is being carried out with the regional construction department - the project "Increasing the water content and improving the hydrological regime of the Ural River".

In addition, the branch of the Republican State Enterprise "Kazhydromet" in the Atyrau region, in order to study the hydrological and hydrochemical regime of the Ural River, monitors the water level and water flow at 5 hydrological posts.

The Akimat of Atyrau region sent a proposal to the Ministry of Ecology, Geology and Natural Resources of the Republic of Kazakhstan on the need to pay attention to joint study, to accelerate the development of a set of measures to further improve the hydrological regime of the Ural River.

In addition, the 17th interregional forum of Kazakhstan and Russia with the participation of the heads of the two states is planned to be held in Kokshetau from November 12-13 this year. The forum will consider the environmental problems of the transboundary basin of the Ural River.

Ulmeken Turlanova – a resident of the city of Atyrau.

The issue of considering the construction of a new kindergarten in the Koktem md.

Design estimates were developed and a state examination was carried out for the construction of a kindergarten for 160 children in the Koktem microdistrict. Funds for construction work will be considered when forming the budget for 2021-2023.

Asel Lukpanova – the city of Atyrau, a resident of the village of Bereke.

Fully provide infrastructure for new sections of Bereke

(electricity, natural gas, roads, water)

In the village of Bereke, the agency "AIS" has been identified, which is carrying out work on laying the road on 42 streets with a total length of 19.3 km;

In addition, design and estimate documentation is being developed for the construction of pedestrian crossings, the arrangement of sidewalks on the streets of the village of Bereke, which remained outside the project.

In the village of Bereke, a project of power grids has been developed and passed the state examination for replacing dilapidated poles, conducting electricity with a length of 23.1 km. Funds are pending.

The construction of 57.6 km of water supply networks in the village of Bereke will be completed in October this year. The village of Bereke is fully supplied with natural gas.

Aibolat Sakhiev – the city of Atyrau, residents of the village of Almaly.

Carrying out night street electricity in the village of Almaly and building roads

Design and estimate documentation has been developed for the construction of a 15 km road in the village. Almaly, design and estimate documentation was developed for the replacement of electrical columns and for the construction of 4.1 km of electrical networks in the village. Almaly, a state examination was carried out. Construction work will begin as funds are disbursed.

Atyrau city, residents of Saryozek village

Issue of drinking water supply to the village of Saryozek and road construction

In accordance with the plan for the construction of water supply facilities in Atyrau, work is underway to build a water pipeline D-110-300 mm in the village of Saryozek (Black River). In addition, the design and estimate documentation for the construction of roads has been developed, and the collection of documents for inclusion in the state expertise is currently underway.

Serikbay Kuanyshev – a resident of the village of Aksay-2.

Construction of a sports facility for residents of Aksay village

For the construction of a multifunctional sports complex in the village. Aksay-2, design and estimate documentation was developed and an examination was carried out. The necessary funds are provided.

Zhamal Khalel – Resident of the city of Kulsary.

Construction of a new stadium in Kulsary

To carry out construction work of the Central Stadium in Kulsary under the Igilik program, the project was submitted to Tengizchevroil LLP and construction is planned for the second half of 2021.

Zhamal Khalel – a resident of the city of Kulsary.

Construction of a 75-bed hospital in the city of Kulsary

The construction of a new 75-bed hospital in Kulsary is being carried out within the framework of the Igilik program. Construction work started in May 2020, completion - December 2021.

Galiya Ibrasheva – a resident of the village of Inderbor.

Fencing waste sites in the area

The number of polygons in the district is 11, the total area is 71 hectares. A budget application has been submitted in the district for the necessary funds to fence off the sites for the collection of solid household waste in 8 settlements.

Gulsim Khanatkyzy Nauryzova – Inder district, resident of the village of Yesbol, teacher of the Y. Yeskaliev secondary school.

Construction of a new school on the site of the emergency Y. Yeskaliev school.

The design and estimate documentation for a school for 320 places in the Yesbol village, a state examination was carried out. Negotiations are underway for the construction of the project with the sponsorship of the NCOC company.

Bolat Dauletov – Inder district, Chairman of the Council of Veterans of the village of Orlik.

Repair of intra-village roads in Koktogay, Orlik villages.

The repair of the intra-village roads of the Koktogay village began in May 2020. The end date is the end of 2020. For the repair of intra-village roads with. Orlik conducted tender procedures and identified contractors. The financing issue will be considered as far as the budget is concerned.

Aiymgul Mashayeva – Isatay district, a resident of the Akkystau village.

Construction of intra-village roads

Akimat of Isatay district developed 2 projects "Reconstruction of intra-village highways in Akkystau village" (16.3 km, 25 streets) and "Overhaul of intra-village roads in Akkystau village" (8.2 km, 19 streets).

Currently, tender procedures have been carried out for the working project "Overhaul of intra-village roads of Akkystau village", a contractor has been identified, work is underway to overhaul intra-village roads of Akkystau village.

"Reconstruction of intra-settlement highways in the Akkystau village" will be carried out as funds are allocated.

Kenzhebay Sagyngaliyev – Isatay district, a resident of the Akkystau village, a pensioner.

Construction of pedestrian roads on Y. Yeszhanuly street, installation of road signs

In the village of Akkystau, Isatay district, 2 projects with a total length of 24.4 km were developed and positive expert opinions were obtained. Due to the fact that these projects do not provide for pedestrian paths along Y. Yeszhanuly Street, a pedestrian crossing will be introduced into the new project, which will be developed after the completion of the two started projects.

Currently, there are 2 pedestrian signs installed at the intersection of Y. Yeszhanuly and Abulkhairova streets.

Marat Ayupov – a resident of the Kurmangazy village, a pensioner.

Allocation of a land plot to residents of the Kurmangazy village for the construction of residential buildings

Under the program "Nurly Zhol", the construction of the object "construction of engineering and communication infrastructure in the village. Ganyushkino of the Kurmangazy disrtict". At the expense of the contractor in the new microdistricts "Bolashak" and "Shipazhai" in the Kurmangazy village, in order to provide the engineering and communication infrastructure of the residential area, gas, water and electricity supply was carried out. After the commissioning of these microdistricts, residents who are in the queue for housing will be provided with land plots in the Bolashak microdistrict - 68, in the Shipazhai microdistrict - 400. It is planned to complete construction work by the end of the year and provide land plots.

Kendebay Baukeshev - Kurmangazy district, resident of the Akkol rural district.

Commissioning of a kindergarten for 290 children in the village of Akkol

Construction of a kindergarten for 290 children in the village. Akkol of Kurmangazy district is operated by Munay Avtomatika Service LTD LLP. Commissioning is planned for the second half of this year.

Madeniet Khamzayev - Kurmangazy district, Chairman of the Council of Veterans of the village of Birlik.

Completion of work on overhaul of the road between rural districts Kurmangazy – Birlik

In 2018, funds from the republican and local budgets were allocated for the overhaul of the regional highways "Kurmangazy-Primorye-Birlik-Kotyaevka 0-29" Due to the variable timing of road construction, road construction works will cover 2018-2020. Construction work will be completed at the end of the year.

Muratay Sarmanov – Chairman of the farm "Nurly Dala Agrofirmasy", a private entrepreneur.

Installation of the monument to Khalel Dosmukhameduly in the village of Miyaly

The akimat of the Kyzylkoga region in order to install the monument to H. Dosmukhameduly in the village of Miyaly, the Directorate of Culture, Archives and Documentation of the region has now held a competition for the selection of a monument, a project of sculptures has been developed.

Oryngali Dosanuly Salykov - Kyzylkoga district, resident of the village of Miyaly, pensioner.

Construction of pedestrian roads in the central streets of the village of Miyaly

 

Design estimates for the construction of roads and sidewalks along the streets of the village of Miyaly began in 2018. Examination No. alash 0010/20 was carried out at the design and estimate documentation on June 25, 2020, according to the project, pedestrian crossings will be built in the village of Miyaly along the streets of Karabalin, Zh.Zhabayev, Kazybek bi, Akkuov, A. Sabirov, Satpayev, S. Usenov, K. Taszhanov, K. Kuanyshev, Boken bi, Sagyrbayuly. Construction work is scheduled for 2021-2022.

Serik Sagynov – Kyzylkoga district, resident of the village of Sagyz.

Providing uninterrupted drinking water to residents of Sagyz village

 

According to the project of reconstruction of the group water pipeline "Keregen-Sagyz-Zhamansor" from the district budget, appropriate funds have been allocated for the preparation of design and estimate documentation for the construction of a reservoir in the village. Sagyz with a volume of 1500 cubic meters, facilities for a pumping station for 1200 m3 per day, design work is planned to be completed by the end of October.

In addition, design and estimate documentation was developed for the development of 3 additional wells from Keregen groundwater reserves and a positive expert opinion was received. Funds have been allocated under the employment program for 2020-2021, construction work has begun.

Sabit Suleimenuly Khalenov – Makat district, Resident of Makat village, Chairman of the District Council of Veterans

Overhaul of railway station platforms in Makat and Dossor villages

For the overhaul of the aprons of the stations in the villages of Makat and Dossor, design estimates were developed and a positive expert opinion was received. If appropriate funds are allocated, on the basis of public procurement procedures, the corresponding work will be started.

Amaniyaz Tazhenuly Kabdolov – Makat district, resident of Dossor village, veteran of law enforcement agencies.

Overhaul and commissioning of 2 pits for drinking water in the village of Makat built in 2008

In the village of Makat, design estimates for the overhaul of 2 pits for drinking water with a capacity of 3000 m3 were developed, a positive expert opinion was received. Overhaul is planned to be completed by the end of this year.

Tolembay Amanbayev - Makhambet district, a resident of the village of Ortakshyl, the head of the "Shabay" peasant farm.

Solving the issue of putting into operation the Yesbol-Kazybay canal and water supply

For the overhaul of the Yesbol-Kazybay canal, design and estimate documentation was developed and a state examination was carried out. Budgetary requests have been directed for the necessary funds for construction work.

Kadyrzhan Kazymbekuly – Makhambet district, resident of the village of Tanday.

Construction of intra-village roads in the villages of Tanday, Taldykol, Aktogay

Repair of intra-village roads in the villages of Taldykol, Aktogay is included in the Employment Roadmap 2020 program, construction work is being carried out by the Kazkomservice institution and will be completed and put into operation by the end of the year. It is planned to develop design and estimate documentation for the overhaul of intra-village roads in the village of Tanday.

Uzakbay Tolegenov –  resident of the village of Makhambet, retired.

Construction of a new kindergarten in the village of Alga

In order to meet the demand for a queue for a kindergarten in the village. Alga developed design and estimate documentation and carried out an examination for the construction of a new kindergarten for 160 children. A budget request was sent to finance the project.

 

О выполнении плана мероприятии по предложениям и замечаниям, поступивших от населения во время участия отчетных встреч акимов города и районов за ІІІ квартал 2020 года по обсуждению отчета акима области «Об итогах социально-экономического развития Атырауской области за 2019 год и задачах на 2020 год»