The area of the region is 146.2 thousand sq. km.
Population as of 01.07.2024 - 789 thousand people, of which urban - 448.4 thousand people (56.8%).
The region consists of 17 districts, 3 cities of regional
and 8 cities of district significance.
Ethnic composition: Kazakhs - 56.6%, Russians - 26.5%, others - 16.9%.
In 2024, within the framework of the Unified Industrialization Map, it is planned to implement 6 projects worth 2.3 billion tenge
with the creation of 185 new jobs, of which the
complex for processing legumes, oilseeds and grain crops of Garanti Export LLP in Kokshetau was implemented for 400 million tenge, 10 jobs were created.
10.8 billion tenge was allocated for the implementation of support and development of small and medium businesses in 2024, incl. for subsidies - 9.4 billion tenge, loan guarantees - 659.3 million tenge, grant financing - 189 million tenge, connection to production infrastructure - 526.5 million tenge.
by 26.3% and amounted to 244.3 billion tenge.
The volume of construction work decreased to 103.8 billion tenge or 102.1% of the 2023 figure. 276.7 thousand square meters of housing were commissioned.
of the economically active population (422 thousand people).
The average monthly nominal wage
for January-June 2024 amounted to 321.2 thousand tenge, which is
12.9% higher than the 2023 level.
The consumer price index amounted to 104.9%, including for food products - 103%
As of August 1, 2024, 374.9 billion tenge or 97.7% of the financing plan for the reporting period have been spent.
The state budget received 261 billion tenge of taxes and other mandatory payments, or 89.1% of the forecast, including 133.8 billion tenge to the republican budget (75.1% of the forecast), and 127.2 billion tenge to the local budget (110.8% of the forecast).
7. 347.3 billion tenge (48.1% of the regional budget) are allocated for the social sphere in 2024, incl. for education - 262 billion tenge (36.3%), health care - 22.3 billion tenge (3.1%).
Coverage of children aged 2 to 6 years with preschool education is 92.3%.
In the field of education, the construction of a school for 80 children in the village of Otemis in the Tselinograd district, an extension to the special boarding school No. 4 in Kokshetau has been completed.
The construction of 6 schools is ongoing: in Birzhan sal (village of Bulandy), Sandytau (village of Petrovka), Tselinograd (village of Zhana Zhol) districts, the cities of Stepnogorsk (p. Bestobe), Kosshy and Kokshetau,
as well as 5 kindergartens: in the Tselinograd district (village of Karaotkel), the cities of Kosshy (1 facility) and Kokshetau (3 facilities).
Within the framework of the National Project "Comfortable School", the construction of 9 schools with the connection of engineering infrastructure continues: in the Tselinograd district - 7 projects (in the villages of: Karazhar, Karaotkel, Kabanbai Batyr, Koyandy, Akmol - 1 project each and Talapker - 2 schools), in the city of Kokshetau - 2 projects.
In the field of healthcare, the construction of the Primary Health Care Center has been completed in the village of Koyandy in the Tselinograd district.
The construction of the FAP in the village of Novoselskoye in the Atbasar district, a hospital combined with a polyclinic in the city of Stepnyak in the Birzhan sal district continues. Within the framework of the National Project "Modernization of Rural Healthcare", the implementation of 35 projects has been launched with the connection of engineering infrastructure (11 medical outpatient clinics in the villages of: Novorybinka of Akkolsky, Arnasai of Arshalynsky, Erkinshilik of Ereimentausky, Svobodnoye and Aksai of Yesilsky, Aidabul of Zerendinsky, Arayly, Zhalgyzkudyk, Nuresil, Orazak of Tselinogradsky, Novokubanka of Shortandysky districts; 21 FAPs in the villages of: Kyna, Uryupinka of Akkolsky, Sergeyevka of Atbasarsky, Andykozha Batyr of Birzhan sal district, Novobratskoye, Partizanka and Altyndy of Bulandysky, Baumanskoye of Yegindykolsky, Kirovskoye of Zhaksynsky, Malik Gabdullin of Zerendinsky, Tonkeris, Karamendy Batyr, Manshuk, Otemis, Zhana Zhainak, Zharlykol,
and Yntymak of Tselinograd district).
to central water supply - 97.8%, heat supply - 68.6%. Access in villages to central water supply - 95.2%.
For 2024, 34.6 billion tenge have been allocated for the development of water supply
and sanitation systems. The funds were allocated for the construction of 23 (10.5 billion tenge)
and reconstruction of 43 facilities (21.4 billion tenge), development of design and estimate documentation for 5 projects (200.8 million tenge), exploration work (606.9 million tenge), routine repairs of 10 facilities (640.2 million tenge), acquisition of 48 KBM (1.3 billion tenge).