The area of the region is 146.2 thousand sq. km.
Population as of 04/01/2024 – 788.5 thousand people, of which urban – 446.9 thousand people (56.7%).
The region consists of 17 districts, 3 regional cities
and 8 cities of regional significance. National composition: Kazakhs - 56.6%, Russians - 26.5%, others - 16.9%.
In 2024, within the framework of the Unified Industrialization Map, it is planned to implement 6 projects worth 2.3 billion tenge
with the creation of 185 new jobs. The largest of them are:
- plant for the production of dry construction mixtures (expansion) Tenus LLP (Arshalyn district, cost - 750 million tenge, capacity - 90 thousand tons per year);
- construction of a complex for processing legumes, oilseeds and grain crops of Garanti Export LLP (Kokshetau, cost - 400 million tenge, capacity - 48 thousand tons of grain and legume crops per year).
10.3 billion tenge was allocated for the support and development of small and medium-sized businesses in 2024, incl. for subsidies - 9.2 billion tenge, guaranteeing loans - 644.3 million tenge, grant financing - 189 million tenge, provision of production infrastructure - 282.2 million tenge.
by 38.4% and amounted to 114.2 billion tenge (the decrease is due to the development of a significant amount of investment in January-April 2023 in the railway industry, alternative energy, and housing construction).
The volume of construction work increased to 25.3 billion tenge or 131.4% of the 2023 figure. 166.4 thousand square meters of housing were commissioned (a decline of 21.5% due to a decrease in the commissioned area of commercial housing due to a shortage of thermal energy in the regional center).
from the economically active population (426.2 thousand people).
Average monthly nominal wage
for January-March 2024 amounted to 313.3 thousand tenge, which
14.4% higher than the 2023 level.
The consumer price index amounted to 102.7%, including 102.3% for food products.
As of May 1, 2024, 176.4 billion tenge or 97.7% were disbursed
to the financing plan for the reporting period.
The state budget received 139.6 billion tenge of taxes and other obligatory payments, or 92.6% of the forecast, including the republican budget - 66.4 billion tenge (75.5%
to the forecast), local – 73.2 billion tenge (116.4% to the forecast).
354.4 billion tenge (52.1% of the regional budget), incl. for education – 273.9 billion tenge (40.3%), healthcare – 19.8 billion tenge (2.9%).
Coverage of children with preschool education aged 2 to 6 years is 92.3%.
In the field of education, the construction of an extension to special boarding school No. 4 in Kokshetau has been completed.
The construction of 7 schools continues: in Birzhan sal (Bulandy village), Sandyktau (Petrovka village), Tselinograd (Zhana Zhol and Otemis villages) districts, the cities of Stepnogorsk (Bestobe village), Koshy and Kokshetau, as well as 5 ty kindergartens: in the Tselinograd region (Karaotkel village), the cities of Kosshy (1 object) and Kokshetau
(3 objects).
As part of the National Project “Comfortable School”, the construction of 9 schools continues: in the Tselinograd region -
7 projects (in the villages: Karazhar, Karaotkel, Kabanbay Batyr, Koyandy, Akmol -
for 1 project and Talapker - 2 schools), the city of Kokshetau - 2 projects.
In the healthcare sector, the construction of a first aid station in the village of Novoselskoye, Atbasarsky district and a Primary Health Care Center in the village of Koyandy, Tselinograd district, a hospital combined with a clinic in the city of Stepnyak, Birzhan Sal district, continues.
Within the framework of the National Project “Modernization of Rural Health Care”, the implementation of 18 projects has begun (6 medical outpatient clinics in the villages of: Novorybinka, Akkolsky, Araily, Zhalgyzkudyk, Nuresil, Orazak, Tselinogradsky, Novokubanka, Shortandinsky districts; 10 FAPs in the villages: Kyna, Uryupinka and Novobratsky, Akkolsky, Baumanskoye, Egindykolsky , Tonkeris, Karamendy Batyr, Manshuk, Otemis, Prirechnoye, Tselinograd and Klyuchi, Shortandinsky districts; 2 medical centers in the villages of Razdolnoye, Yntymak, Tselinograd district).
to central water supply - 97.8%, heat supply - 68.6%. Access to central water supply in villages is 95.2%.
For 2024 for the development of water supply systems
and sewerage allocated 33.8 billion tenge. Funds were allocated for the construction of 23 (10.5 billion tenge)
and reconstruction of 43 facilities (20.9 billion tenge), development of design and estimate documents for 14 projects (236.3 million tenge), prospecting and exploration work (769.9 million tenge), current repairs of 6 facilities (397.8 million tenge), acquisition of 35 KBM (1 billion tenge).
In January-April 2024, there was a 1.5-fold increase in serious crimes, the detection rate for them was 68.7%. Particularly serious crimes increased by 1.5 times, the detection rate for them was 100%.