The area of the region is 146.2 thousand sq. km.
Population as of 02/01/2024 – 787.7 thousand people, of which urban – 446 thousand people (56.6%).
The region consists of 17 districts, 3 regional cities
and 8 cities of regional significance. National composition: Kazakhs - 56.2%, Russians - 26.7%, others - 17.1%.
In 2024, within the framework of the Unified Industrialization Map, it is planned to implement 6 projects worth 2.3 billion tenge
with the creation of 185 new jobs. The largest of them are:
- plant for the production of dry construction mixtures (expansion) Tenus LLP (Arshalyn district, cost - 750 million tenge, capacity - 90 thousand tons per year);
- construction of a complex for processing legumes, oilseeds and grain crops of Garanti Export LLP (Kokshetau, cost - 400 million tenge, capacity - 48 thousand tons of grain and legume crops per year).
and meat).
by 39.8% and amounted to 64.3 billion tenge (due to the purchase of cars from KTZ Freight Transportation LLP in January-February 2023 for 42 billion tenge (Kokshetau), as well as a decrease in investments in housing construction by 6 billion tenge).
The volume of construction work increased to 5.1 billion tenge or 117.9% compared to 2023. 95.8 thousand square meters of housing were commissioned (a decline of 20.6% was due to a decrease in the volume of commercial and individual housing, which accounted for the entire volume of housing in January-February 2023).
The average monthly nominal salary for January-December 2023 amounted to 300 thousand tenge, which is 20% higher than the level of 2022.
The consumer price index amounted to 101.4%, including 101.4% for food products.
As of March 1, 2024, 69.3 billion tenge or 99.2% were disbursed
to the financing plan for the reporting period.
The state budget received 81.5 billion tenge in taxes and other obligatory payments, or 118.3% of the forecast, including the republican budget - 45.5 billion tenge (103.3% of the forecast), the local budget - 36 billion. tenge (144.7% of the forecast).
352 billion tenge (53.1% of the regional budget), incl. for education – 274.6 billion tenge (41.4%), healthcare – 17.6 billion tenge (2.7%).
Coverage of children with preschool education aged 2 to 6 years is 92.3%.
In the field of education, the construction of 8 schools was completed in the villages: Zhibek Zholy (for 300 places), Zhaltyrkol (for 300 places) of Arshalynsky, Otemis (for 120 places), Shubary (for 300 places) of Tselinograd district, the cities of Kosshy (for 1200 places ), Kokshetau (for 392 places), extensions to special boarding school No. 4 in Kokshetau, to a school in the city of Akkol, Akkol district.
The construction of 6 schools continues: in Birzhan sal (Bulandy village), Sandyktau (Petrovka village), Tselinograd (Zhana Zhol village) districts, the cities of Stepnogorsk (Bestobe village), Kosshy and Kokshetau, as well as 5 children’s gardens: in the Tselinograd region (Karaotkel village), the cities of Kosshy (1 object) and Kokshetau (3 objects).
As part of the National Project “Comfortable School”, the construction of 9 schools has begun: in the Tselinograd region - 7 projects (in the villages: Karazhar, Karaotkel, Kabanbay Batyra, Koyandy, Akmol -
for 1 project and Talapker - 2 schools), the city of Kokshetau - 2 projects.
In the healthcare sector, the construction of a medical post (FAP) in the village of Sochinskoye, Atbasar district, has been completed. The construction of a first aid station in the village of Novoselskoye of Atbasarsky and a Primary Health Care Center continues
in the village of Koyandy, Tselinograd district, a hospital, combined
with a clinic in the city of Stepnyak, Birzhan Sal district.
to central water supply - 97.8%, heat supply - 68.6%. Access to central water supply in villages is 95.2%.
For 2024 for the development of water supply systems
and sewerage allocated 33.5 billion tenge. The funds were allocated for the construction of 30 (10.7 billion tenge) and reconstruction of 48 objects (20.9 billion tenge), development of design and estimate documents for 12 projects (165.8 million tenge), prospecting and exploration work (769.9 million tenge), current repairs of the 1st facility (85.4 million tenge), acquisition of 29 KBM (864.4 million tenge).
In February 2024, there was an increase in serious crimes
by 9.7%, the disclosure rate for them was 60.8%. Particularly serious crimes remained at the level of last year (in 2023 - 11 cases), the detection rate for them was 93.1%.